Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Technical Reporting and As-Built Documentation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract requires the preparation of final technical reports, repair plans, product specifications, and as-built drawings in accordance with Appendix A.2 and NACE SP0502 standards, ensuring all documentation meets rigorous technical and industry-specific requirements for integrity and precision. The work is focused on delivering comprehensive documentation outputs that support project completion and compliance with recognized corrosion control and inspection protocols. This is a subcontract under the Department of Defense, administered by the FA9101 AEDC PKP Procurement Branch, with performance required in Coopertown, Tennessee, 37389. The solicitation was posted on April 23, 2026, and responses must be submitted by May 1, 2026, at 7:00 PM. The North American Industry Classification System code 541330 identifies the work as engineering services, underscoring the technical expertise required for successful execution.

General Info

Prepare technical reports and as-built drawings per NACE SP0502 for DoD in Coopertown, TN, by May 1, 2026.

Agency

Department Of Defense → FA9101 Aedc Pkp Procrmnt BranchView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

COOPERTOWN, TN, 37389, USA

Set-Aside

NONE

Documents

This scope was carved out of FA9101161KVStudy.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CIS & DCVG Survey

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Prepare final technical reports, repair plans, product specifications, and as-built drawings per Appendix A.2 and NACE SP0502 standards.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 541330
New
Federal
Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics
Solicitation # FA910126RWP-DigitalTwins
The Department of the Air Force is seeking innovative solutions through a Request for Whitepapers to establish an Other Transaction Agreement under 10 U.S.C. 4022 for the Arnold Engineering Development Complex (AEDC). The primary objective is to modernize facility documentation by creating high-fidelity, as-built 3D digital twins and predictive analytics for critical test infrastructure. The program begins in Fiscal Year 2027 with an initial prototype phase focusing on the Von Karman Gas Dynamics Facility, covering approximately 260,000 square feet of footprint and 1,040,000 square feet of scan area, with plans to eventually scale to over 2.5 million square feet across the complex. Technical requirements specify engineering-grade models with a minimum Level of Detail (LOD) 350, though LOD 400 is highly desired for primary connection points. Deliverables must maintain a dimensional accuracy of +/- 1/4 inch, globally referenced to project survey control, and utilize Autodesk Revit for architectural/structural models and Autodesk Plant PDM for intelligent process models. All work must be performed within the continental United States, and performers must comply with strict cybersecurity standards, including NIST SP 800-171 and CMMC Level 2 self-assessment. The agreement is not a standard procurement contract and is not subject to the Federal Acquisition Regulation. Instead, it utilizes a milestone-based, firm-fixed price structure for the base phase. Evaluation of submissions will be based on technical merit, innovation, program management, and risk. Eligible participants must certify as small businesses or nontraditional defense contractors. The submission deadline for whitepapers is October 8, 2026, and a site visit is scheduled for September 30, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Federal
RWP Independent Air Supply
Solicitation # FA9101269IAS
The Arnold Engineering Development Complex at Arnold Air Force Base, Tennessee, is seeking white papers for the Independent Air Supply project under the authority of 10 U.S.C. section 4022. The objective is to establish a secondary, dedicated, and conditioned air supply for an existing test cell. The scope of work includes the demolition of existing equipment and the design, procurement, fabrication, and installation of a system featuring at least four modular compressor units, dryers, heaters, expansion turbines, and a final mixing chamber. The system must integrate with base utilities and utilize a local control network featuring Emerson RX3i PLCs, Proficy Machine Edition programming, and a Simplicity HMI interface capable of supporting simultaneous unclassified and classified operations. The government may award up to two prototype agreements, with a preference for base milestone pricing around 250,000 dollars, though this is not a strict ceiling. All final engineering drawings and analyses must be stamped by a Professional Engineer licensed in Tennessee, and air purity must comply with ISO 8573-1 Class 1P. Evaluation of submissions will involve a go/no-go compliance check followed by a qualitative review of technical capability, schedule feasibility, and cost realism. The submission deadline for white papers has been extended to September 23, 2026. Interested parties must verify their CAGE code, Joint Certification Program, and CMMC status to access export-controlled Distribution D documents.
Engineering Services

POSTED

4 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS