Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Temporary Diesel Generator Installation & Operation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the supply, installation, operation, and ongoing maintenance of two Tier 4 Final certified diesel-powered generators to deliver temporary electrical power for construction activities. These units must meet strict emissions standards and be capable of reliably supporting site operations throughout the project duration. The responsibility includes ensuring continuous power availability, performing routine servicing, and addressing any mechanical or operational issues promptly to minimize downtime. All equipment must be compliant with environmental regulations and integrated seamlessly into the construction workflow without disrupting site activities. The contract is classified as a subcontract under NAICS code 221117 and is associated with Kings County in California. It was posted on July 7, 2026, and is linked to a specific project identified through the CEQAnet system. While no specific location details are provided in the data, performance is expected to occur within a construction site under Kings County’s jurisdiction. The contractor must adhere to all applicable state and federal guidelines for diesel equipment, environmental compliance, and safety standards during installation, operation, and eventual decommissioning of the generators.

General Info

Supply, install, operate, and maintain two Tier 4 Final diesel generators for Kings County construction site.

Agency

California → Kings County

NAICS

221117 - Biomass Electric Power GenerationView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of C-1262726.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Conditional Use Permit No. 20-02 (Grape Solar Project and Gen-Tie line)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kings County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Kings County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, install, operate, and maintain two Tier 4 Final certified diesel-powered generators to provide temporary electrical power for construction activities.

Similar Contracts

Same NAICS industry code

NAICS: 221117
SLED
PA-2500075 (C)
Solicitation # PA-2500075
San Joaquin County has initiated a conditional use permit process for the construction and operation of a manure anaerobic digestion facility on an existing 78.8-acre dairy property in Manteca, California, situated on a 2.9-acre portion of the site. The project involves installing two above-ground concrete digesters, each measuring 40 feet wide by 180 feet deep and approximately 12.5 feet high, with a rubber bladder lining and a concrete base, to process dairy manure wastewater pumped from existing lagoons approximately 100 yards away. Biogas produced from the digestion process will be upgraded to renewable natural gas (RNG), compressed, and loaded onto specialized gas trucks for offsite distribution, with an estimated monthly volume of 12 truck trips once operational. A third external bladder will serve as emergency methane gas containment, eliminating the need for a combustion flare. The project aligns with renewable energy objectives under the biomass category and is expected to achieve a 29% reduction in greenhouse gas emissions compared to a 2002–2004 baseline, in compliance with San Joaquin Valley Air Pollution Control District’s Best Performance Standards. Emissions are required to remain below thresholds of 10 tons per year for NOx and 0.1 tons per year for PM2.5, with adherence to CEQA, the California Building Code, the California Energy Code, and the SJVAPCD Order R5-2010-0130. The facility is subject to rigorous environmental review under the California Environmental Quality Act and must comply with multiple regulatory frameworks, including water quality standards from the Central Valley Regional Water Quality Control Board, noise ordinances under San Joaquin County Development Code Chapter 9-404, and mitigation obligations under the San Joaquin County Multi-Species Habitat Conservation and Open Space Plan due to impacts on biological resources. Inspections and compliance verification are conducted on-site by the lead agency, San Joaquin County Community Development Department, in coordination with the SJVAPCD and other regulatory bodies. Administrative acceptance of the permit is handled through county offices in Stockton, with no formal contract type or financial terms outlined since this is a regulatory permitting action, not a federal procurement. The solicitation number PA-2500075 (C) relates to the Conditional Use Permit application, with submissions due by June 26, 2026, through the San Joaquin Online
San Joaquin County

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 221117
SLED
Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.
Solicitation # PLN25-00046
The Euismod Energy Storage Project, managed by Euismod Project LLC and Euismod Project I, LLC, involves the development of a battery energy storage system (BESS) facility in southeastern Kern County, California. The facility will utilize lithium-ion batteries to store approximately 1,150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid on a 120-acre site. Key infrastructure includes battery storage arrays, collector substations, SCADA systems, microwave communications towers, and two 230-kV overhead transmission lines connecting to the Southern California Edison Whirlwind Substation. The project requires several land-use entitlements, including a Zone Change, Conditional Use Permits, Zone Variance, and Nonsummary Street Vacations. The project is subject to rigorous environmental and safety standards, including CEQA and NEPA compliance, with specific adherence to NFPA 855 for battery enclosure spacing and NFPA 70E for electrical work. Construction is expected to last approximately two years, with an anticipated operational life of 35 years and a decommissioning period of up to 12 months. The project will utilize union labor with wages meeting IRS prevailing wage standards and must comply with OSHA and California Fire Code requirements. Administrative oversight is provided by the Kern County Planning and Natural Resources Department, with Keith Alvidrez serving as the primary project planner.
Kern County

POSTED

8 months ago

DEADLINE

in 24 days
View Details