Conditional Use Permit No. 20-02 (Grape Solar Project and Gen-Tie line)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Primoris Renewable Energy has applied for a conditional use permit to install two temporary diesel-fired internal combustion engines, certified to Tier 4 Final standards, to power electrical generators during construction activities. These engines are intended solely for temporary use to support the Grape Solar Project and associated Gen-Tie line infrastructure in Kings County, California. The proposal requires regulatory review due to potential emissions and noise impacts, and is being evaluated under local land use and environmental guidelines. The application is being processed by Kings County with oversight from the San Joaquin Valley Air Pollution Control District, reflecting the need to comply with state and local air quality regulations. The primary point of contact for the permit application is Victor Hernandez, Planner at Kings County, who can be reached via phone or email. Additional technical input is provided by Dylan Casares of the Air Quality Specialist team and Nathaniel Caliendo from Primoris, ensuring coordination between local government and the applicant on environmental compliance. The permit is not yet approved and remains conditional pending environmental review and public input. Details regarding the project, including its location and operational parameters, are available through the California Environmental Quality Act portal using the provided project identifier.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
