Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Maryland was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Traffic Sign Installation & Maintenance

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Fence Installation at Big Lake Bottom Wildlife Management Area (WMA)
Solicitation # 802-27-85254
The Texas Parks and Wildlife Department is soliciting bids for the installation of approximately 11,000 linear feet of four-strand barbed wire fencing at the Big Lake Bottom Wildlife Management Area in Palestine, Texas. The project requires the installation of steel T-posts every 12 feet, 2-3/8-inch pipe line posts set in concrete every 100 feet, and one 16-foot bull gate. Additionally, the contractor is responsible for clearing brush, tree limbs, and cactus within a three-foot width on both sides of the fence while ensuring minimal soil disturbance and repairing any equipment ruts. All work must be completed by November 30, 2026, with the understanding that activities may overlap with specific archery and gun deer hunt periods. Bids are due by November 10, 2026, at 2:00 PM CT, and a mandatory pre-bid site visit is scheduled for November 4, 2026. To be eligible, contractors must have at least three years of experience in the specified services and provide a company profile, equipment list, and references. The contract will be awarded on an all-or-none basis to the respondent offering the best value. Awarded contractors must pass a criminal background check and provide a certificate of liability insurance before beginning work. Payment is typically issued within 30 days following the acceptance of services, which is determined by a TPWD inspection conducted within five working days of project completion.
Parks and Wildlife Department

POSTED

1 day ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract entails the supply, installation, maintenance, and eventual removal of temporary traffic signs that comply with the Maryland Manual on Uniform Traffic Control Devices standards, ensuring all signage remains in new or like-new condition throughout the term of performance. The work is specifically tied to District 5 and requires strict adherence to state-specific traffic control guidelines to ensure public safety and regulatory compliance during temporary construction or roadway operations. All activities must be carried out with precision to maintain visibility, durability, and functionality of the signs under varying environmental and traffic conditions. This is a subcontract under the Maryland Department of Transportation, with the North American Industry Classification System code 238990 indicating it falls under other special trade contractors. The solicitation was posted on August 6, 2026, with the same date as the response deadline, indicating an immediate or internally managed procurement process. The place of performance is limited to District 5, and the work will be executed in coordination with state transportation operations without specific point-of-contact details provided. Contractors are expected to manage the full lifecycle of the signs from delivery through removal, maintaining high-quality standards throughout the project duration.

General Info

Supply, install, maintain, and remove temporary traffic signs in Maryland District 5 per state standards.

Place of Performance

District 5, MD, USA

Set-Aside

NONE

Documents

This scope was carved out of 499D51429SB.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 404 499D51429SB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply, install, maintain, and remove temporary traffic signs that meet MdMUTCD standards and are kept in 'New or Like New' condition.

More opportunities from Maryland Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build
Solicitation # SM1235174
Contract SM1235174 is a Design-Build project managed by the Maryland Department of Transportation State Highway Administration to implement drainage improvements and shoreline stabilization along approximately 2 miles of MD 249 (Piney Point Road) between Thomas Road and Stark Drive in Saint Marys County. The project addresses critical vulnerabilities on Saint George Island, where low elevations make the roadway susceptible to tidal inundation, wave action, and shoreline erosion. The scope focuses on implementing constructible living shoreline solutions and mitigating erosion hotspots to maintain roadway access and improve corridor functionality, specifically addressing tidal backwater and sediment buildup. The project is classified as a Type III Noise Project and requires strict adherence to environmental regulations regarding erosion and sediment control for Island Creek and St. Georges Creek. The procurement follows the Competitive Sealed Proposals method under COMAR 21.05.03, utilizing a two-phase selection process. Phase One requires the submission of a Statement of Qualifications (SOQ) via the eMMA portal by November 17, 2026, to establish a Reduced Candidate List based on design-build capability and project understanding. Phase Two involves a Request for Proposals (RFP) issued only to the selected candidates, evaluating technical solutions and price to determine the best value. The anticipated Notice to Proceed is August 30, 2027. Requirements include the provision of performance and payment bonds, professional liability insurance for the lead design firm, and compliance with DBE and EEO programs.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS