Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Terrell Street Resurfacing and Water Line Replacement

Closed
PE-66980-NONST-2027-000000001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

34 minutes ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 2 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Greenville, Georgia is soliciting sealed proposals for the Terrell Street Resurfacing and Water Line Replacement project, with bids due by 3:00 p.m. local time on Tuesday, July 21, 2026, at City Hall located at 101 North Depot Street. The contract involves approximately 1,000 linear feet of pavement repair using full depth reclamation and the installation of about 700 linear feet of 6-inch water line, including all necessary appurtenances, traffic control measures, striping, and erosion control. Bidders must submit proposals using the official form with prices stated in both words and figures, and each bid must be accompanied by a Bid Bond equal to at least 5% of the total bid amount, payable to the City of Greenville, guaranteeing that the bidder will enter into the contract and provide Performance and Payment Bonds each equal to 100% of the contract value if awarded. Failure to execute the contract and supply the required bonds within ten days of notification will result in forfeiture of the Bid Bond as liquidated damages. The project has a 90-day timeline for substantial completion and 120 days for final completion. Bidders must obtain plans and specifications from Turnipseed Engineers via their website, and these documents are also available for public inspection at Greenville City Hall and the Turnipseed offices in Atlanta and Augusta. No bid may be withdrawn for 60 days following the bid opening date.

General Info

Greenville bids for Terrell Street resurfacing and 700-ft water line replacement due July 21, 2026, with 5% bid bond and 100% performance bonds required.

Documents

1

PE-66980-NONST-2027-000000001 Terrell Street Resurfacing and Water Line Replacement

TXT, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Greenville City Hall
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Sealed proposals will be received by the City of Greenville, Georgia at the Greenville City Hall 101 North Depot Street, Greenville, Georgia 30222 until 3:00 p.m. local time, Tuesday, July 21s 2026 at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 1,000 linear feet of pavement repair by full depth reclamation and installation of approximately 700 linear feet of 6-inch water line, all work complete with appurtenances, including traffic control, striping, and erosion control. Time allotted for construction is 90 consecutive calendar days for substantial completion and 120 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Greenville, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Greenville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Greenville, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of Greenville, Georgia and at the offices of Turnipseed Engineers in Atlanta and Augusta, Georgia. Plans and specifications must be obtained at https://turnipseed.com/current-proje

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS