Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Test Pit and Soil Boring Advancement Phase II Environmental Site Assessment Royal Electric Yard, Sykesville, Maryland

Closed
6913G626Q300046Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Under an interagency agreement between the U.S. Department of Transportation’s John A. Volpe National Transportation Systems Center and the U.S. Environmental Protection Agency, a Phase II Environmental Site Assessment is being conducted at the Royal Electric Yard, a 4.1-acre parcel located at 7512 Main Street in Sykesville, Maryland, with the goal of investigating potential soil and groundwater contamination from historic automotive junking activities. A prior Phase I ESA identified likely presence of hazardous substances including used oils, brake and hydraulic fluids, gasoline, diesel fuels, mercury switches, asbestos, refrigerants, metals, batteries, and antifreeze, primarily in the northern wooded portion of the site, prompting the need for subsurface investigation. The scope includes advancing up to ten soil borings organized in a sitewide grid and up to six test pits near known debris piles, supported by geophysical surveys using electromagnetic conductivity, ground penetrating radar, and magnetometry to detect buried metallic and non-metallic objects. Sampling and analysis must adhere to ASTM E1903-19 standards, Maryland Department of the Environment residential soil cleanup criteria, and Volpe’s Generic Quality Assurance Project Plan and Standard Operating Procedures, with all samples requiring proper labeling, preservation, and shipping via approved containers, chain-of-custody documentation, and cooling to maintain integrity. The work is to be performed under a firm-fixed-price contract, fully funded at award for CLIN 00100, with a performance period from August 24 to December 1, 2026, and is set aside exclusively for small businesses. Contractors must possess valid certifications to execute the work, be registered in SAM with a current Unique Entity Identifier, and comply with extensive federal regulations including security prohibitions, data safeguarding requirements, service contract labor standards, Buy American provisions, and counter-trafficking policies. Proposal submission is required via email by August 11, 2026, and must include a completed SF-1449, a detailed firm-fixed-price breakdown covering labor, equipment, lab analysis, permits, and survey costs, and a two-page technical narrative demonstrating understanding of the work plan, site conditions, sampling methodology, and operational efficiencies. Deliverables include draft and final work plans, a call-before-you-dig notification, a geophysical survey report, and a final Phase II ESA report with analytical data, findings, and recommendations. All soil and debris deemed grossly contaminated must be segregated into metal drums or equivalent containers for offsite disposal

General Info

Phase II ESA at Royal Electric Yard, Sykesville, MD, to assess soil and groundwater contamination from historic automotive waste.

NAICS

541380 - Testing Laboratories and Services

Place of Performance

Sykesville, MD, 21784, USA

Set-Aside

SBA

Documents

7

6913G626Q300046 - Royal Electric Yard Phase II ESA

PDF, High priority: read this firstrfq
High

Attachment VIII - Standard Operating Procedures for Test Pit Exploration

PDF, High priority: read this firstsop
High

Field Sampling Plan, Royal Electric Yard, Sykesville, MD, Phase II ESA, May 2026

PDF, High priority: read this firstsampling-plan
High

RFQ 6913G626Q300046 EPA Targeted Brownfields Assessments Support

PDF, High priority: read this firstrfq
High

RFQ Attachments I-V (Rev 1) - Phase II Environmental Site Assessment SOW and Related Documents

PDF, High priority: read this firstrfq
High

Solicitation Questions & Responses 6913G626Q300046

PDF, High priority: read this firstq-and-a
High

Wage Determination 2015-4265 Revision 33 Maryland

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6913G6 Volpe National Transportation System Cntr
Contacts1 person available
OfficeCAMBRIDGE, MA, 02142, USA
Office AddressCAMBRIDGE, MA, 02142, USA
Contacts

Full Description

Show more

Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the U.S. Environmental Protection Agency (EPA) Targeted Brownfields Assessments (TBA) Program. As part of this effort, a Phase II Environmental Site Assessment (ESA) that includes a requirement for the advancement of soil borings and test pits will be conducted at the Royal Electric Yard (the Site) located at 7512 Main St, Sykesville, Maryland 21784.


A 2026 Phase I ESA conducted at the Site identified historic automotive junking activities and small, partially buried piles of automotive debris in the northern, wooded portion of the site. It was determined that there is a likely presence of hazardous substances or petroleum products associated with former automotive operations including used oils, brake and hydraulic fluids, gasoline and diesel fuels, mercury switches, asbestos brake parts, refrigerants, metals, batteries, and antifreezes. A Phase II ESA was recommended to determine if the historical activities at the Site or nearby properties have impacted the Site.


As part of this Phase II ESA, test pits and soil borings will be collected to assess any impacts from potential contaminants of concern.


The Site is an approximately 4.1-acre parcel (Maryland Tax Account Number #05- 072190) located adjacent to Sykesville’s historic main street district. Sykesville is located within Carroll County. Major features at the Site include a warehouse, adjacent woodworking shed, gravel parking lot, and access road in the southern portion, and an unmaintained wooded area in the northern portion. Due to a pending sale of the Site, the primary area of interest is limited to the northern half of the property. The Site generally slopes to the south, with the wooded area alternating between relatively flat terraces and steeper slopes. A review of the Natural Resources Conservation Service National Cooperative Soil Survey shows that the Site’s soil primarily consists of silt-loam, loam, and complexes. The area just south of the warehouse is underlain by Glenville-urban land-Udorthents complex, which indicates possible presence of fill.

More opportunities from Department Of Transportation → 6913G6 Volpe National Transportation System Cntr

Same awarding agency

NAICS: 332999
New
Federal
Dunnage Bar Manufacturing
Solicitation # 6913G627RFI100
The Department of Transportation, through the Volpe National Transportation System Center, has issued a sources-sought Request for Information (RFI) under solicitation number 6913G627RFI100 for the manufacturing of approximately 1,000 dunnage bars modeled after the EVANS DF-1 loader crossbar. This effort is intended for market research and budgetary planning to determine the availability of capable business sources before a formal Request for Proposal is issued. The project requires a comprehensive manufacturing process including 3D scanning of sample parts, casting, machining, welding, and the assembly of 8-gauge steel Z-bars and oak wood components. Finished castings must be zinc plated or treated with commercial-grade black oxide. The dunnage bars must meet specific performance standards, including a uniformly distributed vertical load of 4,000 lbs, a concentrated center span load of 2,000 lbs, and a horizontal longitudinal restraint load of 4,000 lbs. This opportunity is designated as a Total Small Business Set Aside. Interested vendors must submit a Statement of Capabilities not exceeding 10 pages in PDF format to Andrew Josephs by October 23, 2026. Submissions should detail technical strategies, production capacity, lead times, rough order of magnitude costs, and relevant certifications such as ISO 9001, AS9100, or NADCAP.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

6 days ago

DEADLINE

in about 20 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS