Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Three Creeks Riparian Resilience Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Three Creeks Riparian Resilience Project, managed by the California Department of Forestry and Fire Protection, focuses on reducing wildfire risk for the community located at the confluence of Birch and Tinnemaha Creeks. The project involves treating strategic riparian habitats and adjacent uplands on LADWP and Owens Valley Indian Water Commission properties. Work includes manual vegetation removal, potential herbicide application, and mechanical treatments in upland areas. Efforts will prioritize the removal of non-native and invasive species, as well as hazardous or dead native trees, while ensuring no material is removed from wetted channels. Operational guidelines require that retained trees be limbed to six feet and that low ground pressure equipment be used whenever feasible to minimize environmental impact. All activities will be restricted to existing permanent roads and watercourse crossings. Depending on site conditions, cut materials will be managed through lopping and scattering, chipping, pile burning, curtain burning, or hauling. This initiative is aligned with the 2025 CAL FIRE San Bernardino-Inyo-Mono Unit Fire Plan and the Inyo County Community Wildfire Protection Plan.

General Info

CAL FIRE project reducing wildfire risk via vegetation removal in Three Creeks riparian areas.

Agency

California Forestry and Fire Protection, Department of

NAICS

115310 - Support Activities for ForestryView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE Three Creeks Riparian Resilience Project EPP BDU

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts

Full Description

Show more
Identified in the 2025 CAL FIRE San Bernardino-Inyo-Mono Unit Fire Plan and Inyo County Community Wildfire Protection Plan, this project aims to reduce wildfire risk to the community situated at the confluence of Birch and Tinnemaha Creeks by treating strategic areas of riparian habitat and adjacent uplands on LADWP and Owens Valley Indian Water Commission property. Riparian treatments will include manual vegetation removal and subsequent herbicide application if necessary. Adjacent upland areas will also be treated to increase effectiveness and may include mechanical treatment. Work will occur in dry channels and next to wetted channels, with no removal of material from wetted areas. Large, downed material will be retained where feasible but may be redistributed to reduce fuel densities. Fuels will be modified via prioritized removal of non-native/invasive species including trees, dead and/or downed material including dead material from live individuals, and dead/dying/diseased/otherwise hazardous native trees of all sizes. Removal of non-listed native understory and upland species, and healthy native trees <12” DBH, may occur to meet above retention objectives. Retained trees will be limbed 6 ft. except where roads require additional clearance. Ground-based equipment may include skid steers, chippers, curtain burners, and hauling trucks/trailers, for treatment of manually cut material, as well as vehicles and fire apparatus to support crews and burning operations. Low ground pressure equipment (<10 PSI) will be utilized to the extent feasible. Only existing permanent roads and watercourse crossings will be used. Depending on site conditions and timing, cut material will be lopped and scattered, chipped, burned in piles or a curtain burner, or hauled away.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
Federal
Z--Canals Clearing, Sabine NWR, Hackberry, LA
Solicitation # 140FS326R0011
The U.S. Fish and Wildlife Service is soliciting quotes for canal clearing services at the Sabine National Wildlife Refuge in Hackberry, Louisiana, under solicitation 140FS326R0011, issued as a full Small Business Set Aside under FAR Parts 12 and 13, with a NAICS code of 115310 and a small business size standard of $34 million. The contract requires the reestablishment and maintenance of up to 20.71 miles of canals with specific dimensions: 40 to 50 feet in width and a final depth of 5 feet. Work is prioritized across three segments: 13 miles for the Central and Willow Bayou Canals (Priority 1), 5 miles for the Southline West Canal (Priority 2), and 2.71 miles for the Southline East Canal (Priority 3). All spoil material must be spread uniformly along the banks at local marsh height, with no spoil piles permitted. The period of performance runs from September 15, 2026, to September 15, 2027, with site-specific performance activities scheduled from April 15, 2027, through September 15, 2027, under FOB Destination terms. Contractors must provide all labor, equipment—including an amphibious marsh buggy with a 50-foot reach—and materials, obtain necessary permits, coordinate with utilities, and implement a documented Quality Control System that ensures compliance with depth, width, and grading standards, with updates submitted throughout the contract term. The Government will conduct three weekly site inspections, using an 8-foot measurement stick at 100- to 300-yard intervals to verify conformity. Offerors must submit a complete quote package in two parts: Part I for price data on the attached Quote Schedule, and Part II containing a Technical/Management Approach (max 10 pages), Key Personnel and Subcontractor qualifications (max 10 pages), and Past Performance information (max 5 pages total including additional documentation), all adhering to strict page limits. Proposals must include completed attachments: Performance Work Statement, Quote Schedule, SCA Wage Determination, and Past Performance Questionnaire, along with a signed Addendum to FAR 52.212-1 and representations in SAM, including a Unique Entity ID and certification of non-use of prohibited telecommunications or software. Contractors must register
Fws Sat Team 3

POSTED

about 21 hours ago

DEADLINE

in 16 days
View Details
NAICS: 115310
New
Federal
F--WEW RCOVERY PROJECT - WEW HERBICIDE
Solicitation # 140L4326Q0106
The West Eugene Wetlands Recovery Project is a firm-fixed-price solicitation issued by the Department of the Interior, Bureau of Land Management, for broadcast herbicide treatment services in Eugene, Oregon. This total small business set-aside contract aims to support habitat restoration and recovery goals by reducing non-native and native invasive plants across various habitats, including upland prairies, oak savannas, and vernal pools. The scope of work includes an estimated 64 acres of broadcast spraying with Glyphosate and 90 acres of spot spraying using Glyphosate or Triclopyr, utilizing backpack or vehicle-mounted sprayers. The period of performance is scheduled from October 1, 2026, through January 1, 2028. Contractors must possess current Oregon certified applicator licenses or state-licensed trainee status and adhere strictly to herbicide product labels, EPA Worker Protection Standards, and established herbicide-free buffer zones. Evaluation of offers will be based on relevant experience—requiring at least three similar projects completed as a prime contractor within the last five years—technical approach, price reasonableness, and past performance. Key deliverables include Pesticide Activity Reports submitted within 24 hours of application and a final summary report. Administrative requirements include electronic invoicing through the IPP system and compliance with various federal regulations, including the Buy American Act and the Migrant and Seasonal Agricultural Worker Protection Act. The government reserves the right to issue work suspensions due to weather or fire danger without additional compensation.
Oregon State Office

POSTED

about 21 hours ago

DEADLINE

in 10 days
View Details
NAICS: 115310
New
SLED
Upper Butte Creek Forest Health ProjectThe Upper Butte Creek Forest Health Project is a large-scale restoration initiative covering nearly 20,000 acres in the Butte County communities of Jonesville and Butte Meadows, California, aimed at restoring natural forest and watershed processes to enhance ecological resilience. Activities include manual and mechanical thinning, prescribed burning, post-wildfire reforestation with site preparation using herbicides, and comprehensive restoration of meadows, riparian zones, and streams to improve hydrological and aquatic function through process-based methods. Invasive plant management and the establishment of strategic fuel breaks are integral to reducing wildfire risk and supporting ecosystem recovery, while road realignment and access route maintenance enhance emergency response capabilities and public safety. The project seeks to reestablish a natural range of variation in forest structure, biodiversity, and meadow health while improving transportation infrastructure in a historically fire-prone region. This initiative is managed by the Butte County Resource Conservation District, with planning and coordination overseen by the Planning and Watershed Program Manager, Wolfgang Rougle, who can be reached at wolfy@bcrcd.org or 530-721-0164. The project is forecasted for future contracting with a posted date of July 6, 2026, and is centered in the 95942 ZIP code area of California. Although specific contract details such as solicitation numbers, NAICS codes, or set-aside classifications are not yet provided, the project represents a long-term, multi-faceted effort to integrate ecological restoration with community resilience objectives in a sensitive and ecologically significant landscape.
Butte County Resource Conservation

POSTED

1 day ago

DEADLINE

N/A
View Details