Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Thriving Vineyards LLC (2110 Penny Lane) Track I Vineyard Compliance and Restoration Erosion Control Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to earthmoving activities for the development and maintenance of a 2.8 acre vineyard site, with 2.6 acres designated for planting, along with associated trellis and irrigation infrastructure. It also includes the restoration of 2.1 acres of riparian vegetation through the planting of native grasses, shrubs, and trees, as well as earthmoving work necessary for installing and maintaining erosion control measures. The work will occur on gently sloping terrain with gradients ranging from 1% to 15%, averaging 6%. The project is situated in Napa, California, within the 94559 ZIP code, and is governed by the Napa County agency under the track I vineyard compliance and restoration erosion control plan. Key contacts include Daniel Zador as the primary planner, James Bushey as the plan preparer, and Leo Flores as the property owner, all reachable through provided phone numbers and emails. The contract opportunity was posted on July 9, 2026, and is categorized as a forecast with no set-aside type designated.

General Info

Earthmoving and restoration for 2.8-acre Napa vineyard with riparian planting and erosion control.

Agency

California → Napa County

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Penny Lane and Imola Avenue, Napa, CA, 94559

Set-Aside

NONE

Documents

(1)

NOE P25-00162 Thriving Vineyard ECP and Restoration Plan

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts

Full Description

Show more
Earthmoving associated with development and maintenance of 2.8 gross acres (2.6 net planted acres) of vineyard, trellis and irrigation systems, infrastructure, and the restoration of 2.1 acres of riparian vegetation including planting of native grasses, shrubs and trees, and the earthmoving activities associated with the installation and maintenance of erosion control measures. The project area is located on gently sloping land (slopes ranging from 1 % to 15% with an average of 6%).

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
939 San Rafael Avenue Demolition, Project 23-47
Solicitation # 20260823001
The City of Mountain View is soliciting bids for Project 23-47, which involves the complete demolition of structures located at 939 San Rafael Avenue in Mountain View, California. The scope of work includes the removal and off-site disposal of all debris, the destruction of wells, hazardous materials abatement, and the installation of erosion controls and fencing. The project is estimated to cost between $300,000 and $360,000 and must be completed within 80 working days from the start date. Key deliverables include the submission of a Critical Path Method schedule, daily maintenance of as-built record drawings, and a final demolition closeout package containing air clearance results and disposal manifests. The contractor must adhere to strict environmental and safety regulations, including Cal/OSHA, EPA NESHAP, and DTSC Title 22 standards for the handling and packaging of asbestos, lead-based materials, and PCB-contaminated waste. Project oversight is managed by the Public Works Department, with Tsan Liu, Ashraf Shah, and David O. Printy serving as the primary points of contact. Bids must be submitted electronically by September 17, 2026, and must include certifications regarding noncollusion, workers' compensation, and safety compliance. Final payment is subject to a 5% retention and is contingent upon the successful verification of work by the City Engineer and the delivery of all required closeout documentation.
City of Mountain View

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details
NAICS: 238910
New
SLED
NEUF Perimeter Fence, Irrigation, and Landscaping
Solicitation # 26-8702
Collier County is soliciting sealed bids for solicitation number 26-8702 for the construction of the NEUF Perimeter Fence, Irrigation, and Landscaping project. The anticipated project budget is 3,400,000.00 dollars, which includes a 30,000.00 dollar owner's allowance for unforeseen conditions. The scope of work involves site preparation, including the removal of existing trees and shrubs and planting soil preparation, the installation of over 12,000 linear feet of vinyl-coated chain link fencing with barbed wire and double swing gates, and the installation of extensive landscaping featuring various native and non-native trees, palms, and shrubs. Additionally, the contractor must install a comprehensive irrigation system including lateral lines, Hunter decoders, and adjustable flow bubblers, as well as fiber optic and electric conduits. Bids must be submitted electronically via the county's online bidding system by October 8, 2026, at 3:00 PM EST. The contract will be awarded to the lowest responsive and responsible bidder. Required submission documents include unaltered bid forms, a bid bond equal to 5 percent of the cost proposal, evidence of E-Verify enrollment, a certificate of authority to conduct business in Florida, and a valid Certified General Contractors or Underground Utility and Excavation Contractor license. Upon award, the contractor must provide performance and payment bonds for 100 percent of the contract amount. The project is subject to strict environmental, health, and safety standards, and final acceptance is contingent upon the project manager's verification of all contract provisions and the completion of a final punch list.
Public Utilities Engineering & Project Management

POSTED

3 days ago

DEADLINE

in about 1 month
View Details