To add rumble strip for class II bike lane, grind AC, and install vehicle speed feedback sign

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project in Newport Beach, California, on State Route 1 at Balboa Boulevard, aims to improve road safety by installing shoulder rumble strips adjacent to a Class II bike lane, grinding down the existing asphalt surface to remove hazardous lips, and deploying a vehicle speed feedback sign. All work will be confined within the State Right-of-Way, with no additional staging or storage areas required, and execution will occur exclusively during nighttime hours to minimize traffic disruption. No vegetation will be removed in designated habitat areas, and no night work will be scheduled during wildlife breeding seasons to protect local ecosystems. The disturbance to soil is projected to remain under one acre, keeping the environmental impact minimal. Funding for the project will be sourced entirely from state resources, and no local or federal funding is planned. Work is forecasted to begin after September 30, 2025, with primary coordination handled by Caltrans District 12 – Orange, and inquiries should be directed to Iffat Qamar, Associate Environmental Planner.

General Info

Install rumble strips, grind asphalt, deploy speed sign in Newport Beach at night, no habitat disturbance, state-funded, post-Sept 30, 2025.

Agency

California → Caltrans, District 12 - Orange

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

AT BALBOA BOULEVARS FROM NORTH OF SUPERIOR AVE TO SOUTH OF PROSPECT ST, Newport Beach, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
Contacts
Iffat QamarAssociate Environmental Planner

Full Description

Show more
The project proposes to add new shoulder rumble strip for class II bike lane, grind existing AC surface to eliminate lip, and install vehicle speed feedback sign in the city of Newport Beach, on State Route 1 at Balboa Boulevard. The purpose of the project is to enhance safety to address run off the road and speed related collisions. No staging or storage areas have been identified. All work will occur within State Right-of-Way. Project work will occur at night-time. No vegetation removal will occur in the designated habitat area. No night work will occur during the breeding season. Project will need state funding only. The Disturbed Soil Area (DSA) for the project is anticipated to be less than 1.0 acre.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 13 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS