Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Topographic Survey and As-Built Mapping

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Arizona → City Of YumaView Agency

NAICS

541370 - Surveying and Mapping (except Geophysical) ServicesView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-26-321.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-26-321 Jackrabbit Treatment Facility - Sewer Lift Station

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → City Of Yuma
ContactsNo contacts available
OfficeN/A
Organization / Agency
Arizona → City Of Yuma
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs surveying and mapping for prime contractors on City of Yuma sewer lift station projects. Conducts topographic surveying for demolition and grading plans, creates red-line construction record drawings, and prepares final As-Built plans. Delivers topographic survey maps and final As-Built plan sets.

Similar Contracts

Same NAICS industry code

NAICS: 541370
New
Federal
R--NM BITTER LAKE NWR AERIAL IMAGING
Solicitation # 140FC126R0018
Solicitation 140FC126R0018 is a Total Small Business Set-aside for a Firm Fixed Price contract to provide high-resolution digital orthophotography, topographic and bathymetric LiDAR acquisition, and processing services for the Bitter Lake National Wildlife Refuge and surrounding areas in Roswell, New Mexico. Covering approximately 40 square miles, the project aims to support habitat restoration and design efforts following the August 2022 flood. The scope of work includes field surveys for hydraulically significant infrastructure, the establishment of aerial survey control, and the delivery of a refined point cloud dataset and digital elevation model. All work must adhere to USGS 3DEP LiDAR Base Specifications 2022 rev. A and National Hydrography Dataset standards, with data validation following the National Standard for Spatial Data Accuracy. The U.S. Fish and Wildlife Service is requesting submissions via Standard Form 330 rather than a traditional proposal, with a deadline of September 10, 2026. Evaluation is based on professional qualifications, New Mexico state registration, and a proven track record with similar projects. A critical mandatory requirement is the completion of Task 3 LiDAR flights between November 2026 and February 2027, with flights occurring within two weeks of vegetation clearing. The project must be completed by May 28, 2027, with a general delivery window of 120 days after the notice to proceed. Qualified firms must be registered in the System for Award Management and provide a detailed methodology for LiDAR collection as part of their submission.
Construction A/e Team 1 Fws

POSTED

1 day ago

DEADLINE

in 19 days
View Details

More opportunities from Arizona → City Of Yuma

Same awarding agency

NAICS: 238160
SLED
Agua Viva Water Treatment Facility Reservoir No. 1 Roof Structure Replacement and Recoating
Solicitation # RFB-27-011
The City of Yuma is soliciting bids for the rehabilitation of Reservoir No. 1 at the Agua Viva Water Treatment Facility under solicitation RFB-27-011. This design-bid-build project involves the structural replacement of all rafters, girders, and roof plates, followed by the recoating of all interior and exterior surfaces. All work must conform to AWWA D standards, and detailed design calculations and drawings must be signed and sealed by a Registered Professional Engineer licensed in Arizona. The project requires an initial inspection blast of the tank interior equivalent to SSPC-SP10 NACE 2 Near White Metal Blast Cleaning. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and any selected alternates. Bids must be submitted via the City's Procurement Portal by September 10, 2026, at 11:00 AM AZ Time. The successful contractor must provide a performance bond equal to 100 percent of the contract sum from a surety rated B++ or better by A.M. Best. The project timeline specifies substantial completion within 240 calendar days and final completion within 270 days from the Notice to Proceed, with liquidated damages applicable for delays. While Davis-Bacon wages do not apply, the contractor must comply with federal and state non-discrimination laws and OSHA safety standards.
Roofing Contractors

POSTED

26 days ago

DEADLINE

in 5 days
View Details