Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Torrance Refinery Water Recycling Plant Sulfuric Acid Day Tank Area Rehabilitation and Replacement Project

Closed
RFB-TH-0140State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Torrance Refinery Water Recycling Plant Sulfuric Acid Day Tank Area Rehabilitation and Replacement Project aims to upgrade critical infrastructure at the facility to enhance safety, compliance, and operational efficiency. The work involves installing a temporary bypass system to maintain continuity during construction, followed by the removal of outdated pumps, piping, and the existing sulfuric acid day tank. The concrete containment structure will be rehabilitated to meet current standards, and all new and replacement equipment will be installed in accordance with best management practices for chemical storage. These improvements are designed to support regulatory requirements, minimize environmental risks, and provide a safer working environment for personnel handling hazardous materials. The solicitation, numbered RFB-TH-0140, was posted on July 6, 2026, with responses due by July 30, 2026. The project is managed by the California Engineering agency and will be performed at the Torrance Refinery Water Recycling Plant. Interested parties should direct inquiries to Orlando Rodriguez, Senior Engineer, or Tikneshea Hicks, Contracts Administrator II, at the specified contact information. The place of performance is in Carson, California, with all work expected to align with local and federal safety and environmental regulations governing chemical handling and storage.

General Info

Upgrade sulfuric acid tank system at Torrance Refinery to enhance safety, compliance, and operational efficiency.

Documents

4

RFB-TH-0139 TRWRP Sulfuric Acid Day Tank Area Rehabilitation and Replacement Project

PDF, High priority: read this firstrfb
High

RFB-TH-0140 Torrance Refinery Water Recycling Plant Sulfuric Acid Day Tank Area Rehabilitation and Replacement Project

PDF, High priority: read this firstrfb
High

TRWRP Sulfuric Acid Day Tank Area Rehabilitation and Replacement Project Drawings

PDF, High priority: read this firstdrawings
High

Vendor Information Request Form - West Basin Municipal Water District

PDF, Low priorityvendor-information-request
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering
Contacts2 people available
OfficeCarson, CA, 90746, USA
Organization / AgencyCalifornia → Engineering
Office AddressCarson, CA, 90746, USA
Contacts
Orlando RodriguezSenior Engineer
Tikneshea HicksContracts Administrator II

Interested Companies (20)

EntramPORT CHARLOTTE, FL
Tri-County SandblastingWestminster, CA

See All 20 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This project focuses on improvements to the sulfuric acid day tank area at the Torrance Refinery Water Recycling Plant (TRWRP). The scope includes installing a temporary bypass system, removing existing equipment in the day tank area (including pumps, piping, and the tank), rehabilitating the concrete containment structure, and installing all required equipment—both existing components and new replacements as needed. These improvements support regulatory compliance, best management practices for chemical storage and operational efficiency, enhance safety for operators and other personnel, and strengthen overall environmental protection.

More opportunities from California → Engineering

Same awarding agency

NAICS: 236220
New
SLED
Public Safety Center - Market Sounding Survey
Solicitation # 27-007
The City of Hayward is conducting a Market Sounding Survey via Request for Information 27-007 to gather industry feedback on the feasibility and delivery structure of a proposed Public Safety Center. This project aims to replace the obsolete Hayward Police Headquarters with a new facility featuring a police headquarters, an indoor shooting range, and expanded services for the Youth and Family Services Bureau. Conceptual designs suggest a total building size of 98,712 square feet, with the CANG site recommended over the City Center site due to budget and parking advantages. Estimated project costs range from 247 million dollars for the CANG site to 352 million dollars for the City Center site. The City is specifically exploring a public-private partnership delivery method and requires responses from interested firms by November 13, 2026. Submissions must be made electronically through the OpenGov portal and should include a firm profile, risk assessments, and key personnel resumes. Compliance requirements include adherence to ADA upgrades, DIR registration for prevailing wage projects, and certifications regarding nondiscriminatory affirmative action and non-involvement in nuclear weapons development. This RFI is for informational purposes and does not constitute a formal solicitation or a guarantee of a future contract award.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS