Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TPS COMPUTER ASSY,A

Closed
N0038326QPB94Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QYAJB
Solicitation N0010426QYAJB is a fixed-price request for quotations issued by the Navsup Weapon Systems Support Mech for the teardown, evaluation, repair, and modification of a circuit card assembly, NSN 5998-01-577-3864. The contractor is required to perform all work in accordance with original manufacturer specifications and drawings, adhering to strict quality standards including ANSI/ESD S20.20 for electrostatic discharge control and a total prohibition of metallic mercury to prevent contamination on submarines and surface ships. Delivery is required within 111 days on a FOB Destination basis, with all items physically identified and packaged according to MIL-STD-129, MIL-STD-130, and MIL-STD-2073. Due to the nature of the equipment, the contractor must possess a government security clearance and authorized access to Secret level classified documents as detailed in DD Form 254. Award evaluations will be based on Supplier Performance Risk System assessments regarding item, price, and supplier risk. The contractor must maintain inspection records for 365 days following final delivery and utilize the Wide Area Workflow system for electronic invoicing. Additional compliance is required for cybersecurity maturity model certification and the detection and avoidance of counterfeit electronic parts.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 3 months
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB
Solicitation # N0010426QYAF8
Solicitation N0010426QYAF8, issued by the Department of the Navy's NAVSUP Weapon Systems Support Mech, is a request for quotations for the manufacture and delivery of a Circuit Card Assembly (NSN 5998-01-616-3772). The procurement requires strict adherence to Technical Data Package version 002 and mandates that the supplier maintain a quality system compliant with ISO 9001 or MIL-I-45208. Key technical requirements include compliance with ANSI/ESD S20.20 for electrostatic discharge control and a strict mercury-free mandate for use on submarines and surface ships. The contract includes an option for additional quantities up to 100 percent for 365 days after receipt of the order. The government will evaluate offers based on the Supplier Performance Risk System, focusing on item, price, and supplier risk, while prioritizing U.S.-made or qualifying country end products. Award consideration is limited to original equipment manufacturers or authorized distributors who can provide a signed letter of authorization. Deliverables must be marked per MIL-STD-129 and packaged according to MIL-STD-2073-1, with specific packing levels based on the destination. Inspection and acceptance will occur at the origin, and all payment requests must be processed electronically through the Wide Area Workflow system. Following two amendments, the final response deadline for offers is October 28, 2026.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 3 months
NAICS: 334412
New
Federal
59--CIRCUIT CARD ASSEMB
Solicitation # N0010426QYAES
Solicitation NO0104-26-Q-YAES is a small business set-aside request for quotations issued by the Department of the Navy, NAVSUP Weapon Systems Support Mech, for the manufacture and delivery of circuit card assemblies (NSN 5998-01-577-3862). The required items must conform to the design represented by Cage Code 03538 and reference number 77C733426G1, utilizing TDP Version 002. Key technical requirements include strict adherence to ANSI/ESD S20.20 for electrostatic discharge control and a total prohibition of metallic mercury to prevent corrosion and toxicity on submarines and surface ships. The contract specifies a delivery timeline of 180 days with FOB Destination terms and requires a one-year warranty from the date of delivery. The procurement process includes several critical compliance and quality standards. Items must be physically identified per MIL-STD-130 and packaged according to MIL-STD-2073, with specific labeling requirements for Depot Level Repairable items. Inspection and acceptance will occur at the origin, with the contractor holding primary responsibility for quality assurance. Offerors who are not the original equipment manufacturer must provide a signed letter of authorization on OEM letterhead. Evaluation of quotes will be based on Supplier Performance Risk System assessments, focusing on item, price, and supplier risk. All invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in 3 months
NAICS: 334412
New
Federal
CCA,COMPUTER
Solicitation # N0010427QLA02
Solicitation NO00104-27-Q-LA02 is a Request for Quotations issued by the NAVSUP Weapon Systems Support Mech for the teardown, evaluation, repair, and potential modification of a Computer CCA (NSN 5998-01-600-9910). The contractor is required to ensure the repaired item meets all operational and functional requirements using approved repair standards and manuals. Key performance metrics include a required Repair Turnaround Time (RTAT) of 170 days, measured from the physical receipt of the asset to final government acceptance. The contract mandates Government Source Inspection (GSI) and requires the contractor to maintain inspection records for 365 days following final delivery. Compliance requirements include strict adherence to MIL-STD-130 for physical identification and MIL-STD-129 and MIL-STD-2073-1 for packaging and marking. All shipments are FOB Origin, and electronic invoicing must be processed through the Wide Area Workflow system. Award consideration is limited to authorized distributors of the original manufacturer, with evaluations based on price and past performance as tracked via the DoD Supplier Performance Risk System. Additionally, offerors must provide CMMC unique identifiers and comply with various DFARS and FAR clauses regarding cybersecurity, the Buy American Act, and the safeguarding of covered defense information.
Navsup Weapon Systems Support Mech

POSTED

about 19 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract solicits bids for the repair of three TPS Computer Assemblies, identified by part number 3654AS226-1 and NSN 015884486, under the solicitation number N0038326QPB94 issued by NAVSUP Weapon Systems Support. Proposals must be submitted via email to [email hidden] by the deadline of August 14, 2026, and are subject to government source approval, requiring compliance with the NAVSUP WSS Source Approval Brochure. The contractor must adhere to a strict Repair Turnaround Time of 170 days from physical receipt of the asset, as recorded in the Commercial Asset Visibility system, and must meet a monthly throughput capacity to be specified by the offeror. An induction expiration date of 365 days post-award applies, with any assets received after this date requiring bilateral approval for repair. The repair work must conform to the latest technical drawings and publications, with all deviations requiring formal approval from the Basic Design Engineer and submission through approved government forms. The contractor must maintain a quality management system compliant with ISO 9001 and SAE AS9100, ensure all parts and materials are new unless otherwise authorized, and enforce strict configuration control over drawings, specifications, and manufacturing sources. All repairs must return the assembly to a Ready for Issue condition, with specific procedures outlined for handling Beyond Economical Repair, Missing on Induction, and Over and Above Repair scenarios, each requiring documented concurrence from DCMA and direction from the Procuring Contracting Officer before proceeding. The contractor is responsible for providing all necessary tools, test equipment, and facilities, as no Government Furnished Property is specified except where individually noted. Replacements for missing Shop Replaceable Assemblies require formal verification and approval and are not included in the base contract price. Calibration systems must meet ANSI/NCSL Z540.3 or equivalent standards, and purchased materials must undergo strict receiving inspection with detailed documentation retained for government review. The contract includes compliance with Buy American and Equal Opportunity regulations, prohibits cannibalization without written authorization, and mandates proper storage conditions to prevent asset degradation. Reconciliation of contract pricing will occur after final inspection and acceptance, with potential financial consideration if the contractor fails to meet the mandated RTAT or throughput requirements.

General Info

Repair three TPS Computer Assemblies by August 14, 2026, within 170 days, compliant with ISO 9001, SAE AS9100, and Buy American regulations.

NAICS

334412 - Bare Printed Circuit Board Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

1

RFQ NO0383-26-Q-PB94 - TPS Computer Assy Repair

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N762.46|TCJ|+1 (555) 000-0000|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo type |N/A|TBD|N00383|TBD|TBD|See schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 170 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. THIS SOLICITATION IS FOR THE REPAIR OF: TPS COMPUTER ASSY,A NIIN: 015884486 PN: 3654AS226-1 QUANTITY: 3 PLEASE SUBMIT QUOTE VIA EMAIL TO contact@example.gov BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10. IF A FIRM FIXED. PRICE (FFP) CANNOT BE DETERMINED, PLEASE INFORM THE PCO. THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT CESSED IN TIME https://www.navsup.navy.mil/public/navsup/wss/business_opps/ SUBJECT UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. EARLY AND INCREMENTAL DELIVERIES ARE ACCEPTED AND PREFERRED. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: TPS COMPUTER ASSY,A ;5998 015884486; NSN , ;3654AS226-1; Part Number, Shall be performed IAW: TPS COMPUTER ASSY,A ;Latest Drawings; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS Potential sources must ensure they are able to repair or procure all parts listed on the NAVAIR spec controlled drawing to be in consideration as an approved source of repair for this item. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: TPS COMPUTER ASSY,A ;3654AS226-1; P/N, ;5998 015884486; NSN, ;Latest Drawings; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. TPS COMPUTER ASSY,A ;TBD; Company Name , ;TBD; Address , ;TBD; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 336413
New
Federal
Repair, NIIN 016891302, QTY 4
Solicitation # N0038326QFB12
Solicitation N0038326QFB12, issued by Navsup Weapon Systems Support in Philadelphia, is a small business set-aside for the repair and modification of four electromechanical actuators, identified by NSN 7R-1680-016891302 and TDP Version 001. The scope of work requires the contractor to disassemble, clean, inspect, and repair the units to a Ready For Issue condition using approved repair manuals and specified drawings. Key technical requirements include the mandatory use of SAE-AS22759 series wire instead of MIL-W-81381 and adherence to MIL-STD-454 where applicable. The contractor must provide a laboratory facility for comprehensive functional testing and maintain a quality system conforming to ISO 9001 or SAE AS9100, with calibration systems meeting ANSI/NCSL Z540.3 or ISO-10012-1 standards. The contract specifies a delivery timeline of 90 days with FOB Destination terms, although inspection and acceptance are conducted at the origin. Packaging must comply with MIL-STD-2073, and electronic invoicing is required through the Wide Area Workflow system. Administrative oversight involves several DoDAACs, including HQ0339 for payment and S0707A for administration and inspection. Despite these detailed requirements, the solicitation was canceled in its entirety via Amendment 0001, effective October 21, 2026.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS