Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Homeland Security was posted on January 10, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Transitional Shelter Units

Closed
HSFEHQ-11-R-0210Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 624230
New
Federal
R706--FCC Medical Cache Maintenance
Solicitation # 36C25927Q0030
Solicitation 36C25927Q0030 is a firm-fixed price request for quotes for the maintenance and storage of the Federal Coordination Center medical cache for the Eastern Colorado Healthcare System. This procurement is 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 624230. The scope of work includes the storage and maintenance of medical cache items, transportation and staffing for the setup of the cache at Patient Reception Sites during exercises, and general training and meeting support. The contract consists of a base year running from December 1, 2026, to November 30, 2027, with four subsequent one-year option periods extending the total potential duration to five years. The government will evaluate offers based on a comparative analysis of technical capability, price, and past performance. To be considered responsive, offerors must submit four distinct volumes: technical capability, pricing for all base and option years, up to three recent and relevant past performance references, and a certificate of compliance regarding subcontracting limitations. Personnel must meet specific experience and certification requirements, including a two-year minimum experience level and ICS 100, 200, 700, and 800 certifications. Quotes must be submitted via email to the designated contracting officer by 10:00am MT on November 4, 2026, and all SDVOSB status must be verified through the SBA Small Business Certification system.
Network Contract Office 19 (36C259)

POSTED

about 23 hours ago

DEADLINE

in 14 days
NAICS: 624230
Grant
2026 RIDEM Disaster Relief Program
Solicitation # 56yg0vaut6h5
The 2026 RIDEM Disaster Relief Program is a reimbursement initiative managed by the Rhode Island Department of Environmental Management, Bureau of Natural Resources. It provides financial assistance to eligible Rhode Island farmers, foresters, and aquaculture producers who suffered qualifying weather-related losses during 2023 and 2024. Eligible losses include damage to farm infrastructure, timber, perennial crops, poultry production, market losses, and land restoration, provided these losses were not already covered by existing USDA Farm Service Agency programs. The program is funded through a Rhode Island 220 Block Grant Agreement between the USDA Farm Service Agency and RIDEM, with a total available funding pool of 15,644,632.43. Applications must be submitted electronically via the state's grant management website by December 31, 2026. Awards are not based on competitive scoring but on program eligibility, verified losses, and available funding. RIDEM will reimburse eligible producers for up to 80 percent of approved losses, though a uniform reduction factor may be applied if total claims exceed available funding. Applicants are required to use a specific Applicant Calculator workbook to estimate losses and must provide supporting documentation and site access for verification. Awardees must execute all required contracts within 30 calendar days of notification and are responsible for any tax obligations resulting from the funds, which may be reported via Form 1099-G.
DEM - Bureau of Natural Resources

POSTED

16 days ago

DEADLINE

in 2 months

General Info

NAICS

624230 - Emergency and Other Relief Services

Place of Performance

Various, DC, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Community Survivor Assistance SEC
Contacts1 person available
OfficeWASHINGTON, DC, 20472, USA
Office AddressWASHINGTON, DC, 20472, USA
Contacts
Sean G. WilliamsContracting Officer

Full Description

Show more
Request for Information Transitional Shelter Units INTRODUCTION The Federal Emergency Management Agency (FEMA) is interested in expanding its temporary sheltering operational capability to improve assistance to disaster survivors during major and catastrophic events. The purpose of this Request for Information (RFI) is to seek industry input regarding innovative, temporarily placed congregate and non-congregate shelter units. Units could provide separate sleeping quarters for individual households with common services or contain multiple households in a single facility. We are considering all types of materials and designs but primarily those that can be connected to an HVAC system and can resist inclement weather conditions. Structures must be able to be assembled quickly by unskilled labor. BACKGROUND During an initial disaster response, when requested by an affected State, FEMA provides mass care support to disaster survivors in congregate and non-congregate shelters. When Federal and State programs are not capable of identifying sufficient or alternate accommodations (such as hotels/motels, rental assistance and travel trailers/manufactured housing), FEMA may be asked to provide an alternative solution. Currently, FEMA does not have a mechanism to support States with this type of request. The agency is committed to improve its sheltering capability by identifying innovative options for assisting survivors with temporary solutions for sheltering/housing shortfalls. Solutions should include a range of alternatives, such as erecting small, easily transported and affordable units that can be located in cluster sites and/or on a survivor's private property. ASSUMPTIONS Units will be easily transportable by standard tractor trailers or smaller vehicles Units will sleep a minimum of two adults Units can be secured by a locking mechanism on all ingress/egress routes Units will be made of fire-resistant material Units will be suitable for occupancy for up to six months but are not intended for permanent use Units will require minimal set-up: - o Can be erected/installed by unskilled labor - o If energized, units should be "plug and play" - o If wet, potable water should be provided by standard water hose REQUIRED INFORMATION Provide detail on unit's ability to withstand winds Provide R value for the shell, indicating shelter insulation capabilities Provide roof snow load Provide fire rating for materials used in construction Cite use of any recognized building codes (HUD, IRC, IBC) Provide detailed foundation requirements, including type of material Provide both inventory volume and weekly manufacturing capability Provide pictures of completely installed units, for reference Provide specifics on when and if the unit has been used previously in a disaster response Provide the number of untrained crew required to set up the unit Provide the total time for an untrained crew to set up the unit Specify whether the unit - in its "As Is" condition - can accommodate individuals with functional support needs Provide information as to whether or not the unit will meet ADA requirements Provide information on the interior air quality when used Provide information as to whether or not the materials are recyclable and reusable Provide information as to whether the materials and construction meet Buy American Act requirements Provide information as to whether or not the unit can be retrofitted, modified or expanded to meet the requirements of the RFI INNOVATION The use of innovative technologies in the manufacturing, delivery, set up, occupancy and deactivation of shelter units should be taken into account when submitting proposals. The following list provides examples of innovation that FEMA would consider, and is not meant to be comprehensive. Use of solar cells to provide power Green technology Self contained Folding/collapsible for delivery and storage Easy-to-install foundations Recyclable/reusable materials POTENTIAL SHELTERING SCENARIOS - 1) A Presidential declaration leads to an affected State requesting sheltering support from FEMA. Existing congregate shelters are not sufficient and additional, innovative sheltering solutions are required, as traditional temporary housing has a potentially significant ramp-up time. Cluster sites are established to provide survivor households with units that provide more privacy and stability than a traditional congregate setting, but with lower set-up and space requirements than temporary housing. Wrap-around services to sustain survivors may be provided at cluster sites until temporary or permanent housing can be established. - 2) The disaster survivor's home sustains damage during the disaster event. While the home was not destroyed, it requires repairs lasting up to six months before it is habitable. Rather than remaining in a congregate shelter or hotel room, the survivor is provided with a shelter unit on their property, adjacent to their damaged dwelling. This shelter unit allows the homeowner to remain near their home to safeguard their property and oversee repairs. Having this option available will potentially eliminate the need for more expensive traditional temporary housing options that require extensive set-up time. After catastrophic events (depending on various situational factors), wrap around services may be provided on private sites, serviced by volunteer agencies or the local, state, or federal government, to support the needs of disaster survivors. RESPONSE REQUIREMENT FEMA requests that the industry provides suggested solutions to the transitional sheltering requirements expressed in this Request for Information. Please submit your responses to: Sean Williams @ Sean.g.williams@dhs.gov by Feb 25, 2011. This request is for information gathering only. No contract will result from this RFI. No discussions are being held.

More opportunities from Department Of Homeland Security → Community Survivor Assistance SEC

Same awarding agency

NAICS: 541611
Federal
Request for Information - FEMA Public-Assistance Technical Assistance (PA-TAC) VI Contract
Solicitation # FEMA-RFI(PA-TAC-VI)
FEMA is conducting market research through a Request for Information for the Public Assistance Technical Assistance Contract VI (PA-TAC VI) to procure advisory and assistance services. The objective is to secure qualified personnel to support the Public Assistance program in disaster response and recovery across five zones, with tasks including site inspections, field technical support, and program delivery management. The agency intends to solicit this requirement as an unrestricted competition via the GSA OASIS+ vehicle under the Management and Advisory Services domain, using NAICS code 541611. A formal solicitation is anticipated to be released on or about September 1, 2026, with a projected contract start date of October 1, 2026. The anticipated contract will be a hybrid IDIQ utilizing Firm Fixed Price, Labor Hour, and Time and Materials CLINs. It will feature a base year and four option years, extending the period of performance through September 30, 2031. Pricing will include fixed hourly rates for labor, a Project Management Office rate not to exceed 4 percent of labor costs, and reimbursable travel and other direct costs. Contractors must maintain a roster of qualified personnel and are required to submit 50 percent of required labor category names within 30 days of award and the remainder within 90 days. Security requirements include moderate risk background investigations for all staff and strict adherence to safeguarding Controlled Unclassified Information.
Administrative Management and General Management Consulting Services

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS