Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Two 1.5 MG Tanks Replacement (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the replacement and operation of two aboveground welded steel 1.5-million-gallon potable water storage reservoirs and an associated pump house in Ridgecrest, Kern County, California, located north of Highway 178 between Snort Bypass Rd. and North Brady Street. The work is being carried out by the China Lake Naval Air Weapons Station under the oversight of the California State Water Resources Control Board’s Division of Drinking Water, which has verified compliance with California Waterworks Standards (Cal. Code Regs., Tit. 22, § 64585) and approved the design as ministerial under Cal. Code Regs., § 15268, exempting the project from environmental review under CEQA. Inspection and acceptance authority rests with the State Water Board, with the official record of approval maintained at their Bakersfield office, and the physical performance location is designated at the specified site in Ridgecrest. All components must meet state regulatory requirements for potable water storage and distribution, with no alternative standards or additional specifications cited beyond the California Waterworks Standards. No contract type, pricing, value, or payment details are provided, and no solicitation or contract number exists in the documentation. There is no identified period of performance, delivery schedule, FOB terms, invoicing method, or accounting data such as TAS or ACRN. The Federal Acquisition Regulation (FAR) and Defense FAR Supplement (DFARS) clause structures are not applicable or referenced, and no contract clauses, representations, certifications, or socioeconomic qualifications are included. There are no listed attachments, packaging or marking requirements, evaluation factors, source selection criteria, or instructions for proposal submission. Key personnel include Jesse Dhaliwal as District Engineer and Michael Bizon as Administrative Contact, but formal roles as COR, COTR, or PCO are not assigned. The project operates within a state regulatory framework with federal ownership of the site, but lacks typical federal procurement documentation such as CLINs, UEI or CAGE codes, or formal contracting mechanisms typically governed by FAR.

General Info

Replacement of two 1.5-million-gallon water reservoirs and pump house in Ridgecrest, CA, under state regulatory oversight.

Agency

California → SWRCB, Division of Drinking Water

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

North of Highway 178 between Snort Bypass Rd. and North Brady Street, Ridgecrest, CA

Set-Aside

NONE

Documents

(1)

NOE for Two 1.5 MG Tanks Replacement at China Lake NAWS

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Drinking Water
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Drinking Water
Office AddressN/A
Contacts
Jesse DhaliwalDistrict Engineer
Michael BizonAdministrative Contact

Full Description

Show more
The Applicant proposes to replace and operate two water storage reservoirs and a pump house. The reservoirs will be aboveground welded steel 1.5-million-gallon reservoirs designed for potable water storage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details