Mill Creek Habitat Connectivity Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mill Creek Habitat Connectivity Project aims to restore natural aquatic function by replacing five outdated culverts along Mill Creek, a tributary to Strongs Creek and the lower Eel River in Fortuna, California, to eliminate barriers to fish passage and enhance habitat connectivity for native species, particularly salmonids. Located in Humboldt County, the project is classified as a small-scale habitat restoration under California Environmental Quality Act Section 15333, qualifying for a categorical exemption due to its minimal environmental impact and lack of adverse effects on endangered or threatened species. The initiative is led by the North Coast Regional Water Quality Control Board in Santa Rosa, with the City of Fortuna serving as the project implementer, and key contacts include Jacob Shannon, Senior Environmental Scientist, and Mat Nyberg, Deputy City Engineer. While the project is posted as a forecast with a July 28, 2025, issuance date, no formal solicitation number, contract value, pricing details, or line-item costs are provided, indicating this is a planning notice rather than a finalized procurement. Performance is expected to occur on-site in Fortuna, with no specified period of performance, delivery terms, or invoicing method outlined. Although environmental compliance with the Clean Water Act and Endangered Species Act is implied, no formal specifications, inspection criteria, marking requirements, or federal contracting clauses from the FAR are included in the documentation. The project relies on a Notice of Exemption and certified exemption documentation as its primary regulatory submissions, with no requirement for contractor certifications, socioeconomic status disclosures, unique entity identifiers, or key personnel provisions. No contract type, options, subcontracting, or special requirements such as security clearances or organizational conflict of interest provisions are specified, reflecting a streamlined environmental restoration effort managed at the state and local level without federal acquisition formalities.

General Info

Replace five culverts in Fortuna to restore fish passage and habitat connectivity for salmonids under state environmental exemption.

Agency

California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Fortuna, CA

Set-Aside

NONE

Documents

(1)

Mill Creek Habitat Connectivity Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Office AddressN/A
Contacts
Jacob ShannonSr. Environmental (Scientist)
Mat NybergDeputy City Engineer

Full Description

Show more
This Project will improve the geomorphic function and instream habitat connectivity of Mill Creek, tributary to Strongs Creek and the lower Eel River, by upgrading and replacing five culverted stream crossings that present fish passage barriers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 14 hours ago

DEADLINE

in about 1 month