Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tyndall AFB, Florida - HVAC and MCC Replacement

Closed
GNFR-FC-TYN-26-26340Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 23
Federal
Industry Day: A Government-Industry Exchange on Construction Contracting - An Invitation for Industry Partners to Collaborate with the United States Space Force Operational Contracting Enterprise
Solicitation # AFICC_KS_Industry_Day_September_2026
The United States Space Force Operational Contracting Enterprise is hosting an Industry Day on September 14, 2026, in Colorado Springs and via Microsoft Teams to collaborate with general contractors on accelerating construction timelines. The event focuses on the implementation of new, flexible contracting authorities, specifically Other Transaction Authority (OTA) under 10 U.S.C. section 2808a. This initiative aims to bypass traditional FAR-based procurement bottlenecks through Commercial Solutions Openings (CSOs), allowing the government to integrate commercial best practices and innovative building methods to move from concept to capability faster. Budget projections for FY27 through FY31 indicate significant opportunities, with approximately 5.6 billion dollars for MILCON and 3.3 billion dollars for FSRM projects. Under the 2808a authority, awards must be structured as Fixed-Price Other Transactions, such as Fixed-Price Incentive or Fixed-Price Award Fee agreements. Because these OTs lack standard FAR-based protections, the government and industry partners will develop tailored articles to govern disputes, changes, and terminations. The award process is phased, beginning with a white paper evaluation based on relevance and rough order of magnitude pricing, followed by an oral pitch of constructability plans, and concluding with the joint development of a Statement of Work. Evaluation criteria emphasize industrial construction methods, schedule realism, financial health, and adherence to commercial building codes like IBC and NEC, as well as DoD Unified Facilities Criteria. While flexible, these agreements still require compliance with the Davis-Bacon Act, Service Contract Act, Miller Act, and the Buy American Act.
Air Force Space Command

POSTED

about 1 month ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The contract involves the replacement of all HVAC and MCC equipment at Tyndall Air Force Base in Florida with a newly configured, centralized system designed to meet the latest UFC standards, including the addition of dedicated space for new mechanical units and the consolidation of existing independent units. The project will install a new Siemens control system to manage all BX and mall area equipment, linking it via fiber to the Tyndall COMM building, and will require associated ceiling and interior repairs along with minor structural modifications to accommodate the new infrastructure. The construction is scheduled for a one-year period from 2026 to 2027, contingent on funding availability, with efforts made to maintain building operations throughout the work. The entire system will be tested and balanced in full compliance with the contract specifications. The solicitation, numbered GNFR-FC-TYN-26-26340, was posted on June 1, 2026, with proposals due by June 12, 2026, and is open to all eligible bidders without set-aside restrictions under NAICS code 23. All solicitation documents and amendments must be accessed through the official website, and proposals must acknowledge any updates. The contracting office is based in Dallas, Texas, with Nikisha Knowlton listed as the primary point of contact.

General Info

HVAC and MCC systems replacement at Tyndall AFB, Florida; construction 2026-2027; upgrades, testing included.

NAICS

23 - Construction

Place of Performance

Tyndall AFB, FL, 32403, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 5, 2026 to Jun 12, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Pz - K Ofc Of Dir-Procu 1018572
Contacts1 person available
OfficeDALLAS, TX, 75236-1598, USA
Office AddressDALLAS, TX, 75236-1598, USA
Contacts

Full Description

Show more

Solicitation Number: GNFR-FC-TYN-26-26340


Tyndall AFB, Florida - HVAC and MCC Replacement


Project Number: 3784-26-000002


This project includes replacement of all HVAC equipment with a newly configured system, adding new equipment space to enable housing of new mechanical equipment with sufficient space to comply with latest UFCs. Certain independent units will be consolidated into new centralized system capacity once new floor space is established. The control system of all BX and mall area replaced equipment will be via new Siemens Design (replacing the existing Siemens and older components) and report to the Tyndall COMM building via fiber link. The construction is anticipated to be a one-year contract, to be awarded in FY2026, and constructed in 2026-2027 (Subject to the availability of funds), and the building must remain in operation as much as practicable during the construction period. There is anticipated to be ceiling and interior repairs associated with the project, along with potential minor structural modifications needed to accommodate the new units, and those costs are covered in the estimate. The whole system will be tested and balanced per the contract documents.


In order to participate in this solicitation, please refer to the link provided below. All solicitation documents will be posted on our website. Any and all amendments will be posted on our website, and must be acknowledged, when submitting a proposal.


https://odin.aafes.com/ConstructionSolicitations/

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS