Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on January 10, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

U.S. Coast Guard Offshore Patrol Cutter (OPC) Request for Information

Closed
RFI-USCG-OPC-2020-1Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by the Navsup Flc Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from 12 November 2026 to 18 November 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, rust and corrosion removal, replacement of lagging and insulation, cleaning and inspection of air conditioning and refrigeration plant condensers, furniture upholstery replacement, and the provision of rigging and scaffolding services. All work must adhere to NAVSEA Standard Items and specification package NAPL-009-27. Award will be made to the lowest priced technically acceptable offeror, with technical capability evaluated on an acceptable or unacceptable basis. Offerors must submit a completed J-1 price breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Quality assurance requirements include providing a quality management system supporting documents and certifications for welding and coatings. Contract administration requires electronic invoicing via Wide Area WorkFlow, and the contractor must comply with specific overseas insurance requirements, including the Defense Base Act and war-hazard insurance.
Navsup Flc Sigonella Naples Office

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
Misty Barge Dry Dock Services
Solicitation # 1240BF27Q0002
Solicitation 1240BF27Q0002 is a total small business set-aside issued by the USDA-FS CSA Northwest 4 for dry dock services for the Misty Barge, currently located at Shelter Cove on Revillagigedo Island, Alaska. The scope of work includes hauling out the vessel, performing exterior hull sandblasting and painting, repairing the exterior deck and appurtenances, painting the interior hull, and cleaning bilge tanks. All painting must adhere to Preparation and Painting Specification 00300 and manufacturer recommendations, specifically utilizing PPG products. The period of performance extends from the date of award through April 1, 2027, with specific deliverables including a work schedule, coating products list, and interior bilge painting plan due shortly after the start date. Offers are due by November 6, 2026, following an extension granted by Amendment 0001. Proposals must be submitted via email as three separate attachments covering technical capability, past performance, and price. Award will be based on the most advantageous quote, with price serving as the primary evaluation factor. Technical evaluations will focus on the provided draft work schedule and proposed haul-out dates, while past performance will be assessed based on recency and relevancy within the last three years. The contractor is responsible for implementing a Quality Control Plan managed by a designated Quality Control Representative, while the government will maintain Quality Assurance through performance requirements measures.
Csa Northwest 4 Usda-Fs

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

1 day ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

DC

Set-Aside

NONE

Documents

4

Draft+Request+for+Proposal+%28RFP%29_OPC+Industry+Studies_version+2.0.pdf

PDF

DRAFT+Request+for+Proposal+%28RFP%29_OPC+Industry+Studies+version+3.0.pdf

PDF

DRAFT+Request+for+Proposal+%28RFP%29_OPC+Industry+Studies+version+4.0.pdf

PDF

OPC+Industry+Studies+SOW_Draft.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseClosed
Posted

special-notice

Deadline changed

Response deadline changed from Nov 6, 2019 to Dec 9, 2019.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Dec 9, 2019 to Dec 6, 2019.

Notice updated

Response deadline changed from Dec 6, 2019 to Dec 13, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Dec 13, 2019 to Jan 3, 2020. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Hq Contract Operations (CG-912)(000
Contacts1 person available
OfficeWASHINGTON, DC, 20593, USA
Office AddressWASHINGTON, DC, 20593, USA
Contacts
Offshore Patrol Cutter Program

Full Description

Show more
Amendment 0006 to this RFI is issued to provide a consolidated list of answers to all questions received during the OPC Industry Day as well as all questions received in respose to this RFI. ____________________________________________________________ Amendment 005 to this RFI is issued to provide an updated DRAFT Industry Studies Request for Proposal (RFP). The updated document is titled, "Draft Request for Proposal (RFP)_OPC Industry Studies version 4.0.pdf." The updated RFP incorporates changes to the following: 1. Section C, Statement of Work (SOW); 2. Section L.8, Export Control Technical Drawings; 3. Section L.9, Proposal Volume Instructions (Price); 4. Section M.2, Basis for Award; and 5. Section M.5, Evaluation Approach (Price). The anticipated RFP release date is 10 January 2020. Please direct any questions regarding the posting of this RFI to the attention of the Offshore Patrol Cutter (OPC) Program at contact@example.gov . To assist the Government with tracking responses, please reference - Offshore Patrol Cutter (OPC) and company's name in the subject line. ____________________________________________________________________ Amendment 0004 to this RFI is issued to provide an updated DRAFT Industry Studies (RFP) to include sections L&M. The updated document is titled "Draft Request for Proposal (RFP)_OPC Industry Studies_version 3.0.pdf". This amendment also extends the due date for all responses related to this RFI posting to 1200 PM EST, FRIDAY, 13 DECEMBER 2019. Please direct any questions regarding the posting of this RFI to the attention of the Offshore Patrol Cutter (OPC) Program at contact@example.gov . To assist the Government with tracking responses, please reference - Offshore Patrol Cutter (OPC) and company's name in the subject line. _________________________________________________________ Amendment 0003 to this RFI is issued to incorporate a data rights table into Attachment J-2 of the RFP, Table 1-Technical Data. The "Draft Request for Proposal (RFP)_OPC Industry Studies_vesrion 2.0.pdf should be used in lieu of the Draft Request for Proposal (RFP)_OPC Industry Studies.pdf. ___________________________________________________________________ Amendment 0002 to this RFI is issued to provide a Draft Request for Proposal (RFP) (without sections L&M) to include an updated draft Statement of Work (SOW). This RFI will once again be amended on Friday, 06 December 2019 to provide a complete IS RFP package to include sections L&M. Please direct any questions regarding the posting of this RFI to the attention of the Offshore Patrol Cutter (OPC) Program at contact@example.gov . To assist the Government with tracking responses, please reference - Offshore Patrol Cutter (OPC) and company's name in the subject line. ____________________________________________________________________ An amendment is to this RFI is issued to provide a draft copy of the Offshore Patrol Cutter (OPC) Industry Studies Satement of Work (SOW). All potential offerors are encouraged to provide comments and feedback to the draft SOW. Comments and feedback should be provided NLT 12:00 PM EST on 06 December 2019. Questions, comments, and all feedback should be directed to contact@example.gov. To assist the Government with tracking responses, please reference - Offshore Patrol Cutter (OPC) and company's name in the subject line. Thank you. __________________________________________________________________ This Request for Information (RFI) issued by the United States Coast Guard (USCG) is for information and planning purposes only. It does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. No contract award will be made based on any responses to this notice. The Government is not responsible for any costs associated with providing information in response to this RFI and no reimbursement will be made for any cost associated with effort expended in responding to this notice. Submission of proprietary information is not requested, and respondents shall refrain to the maximum extent practical from providing proprietary information in response to this RFI. If respondents volunteer to provide proprietary information, clearly mark such proprietary information appropriately and separate it from the unrestricted information as an appendix. Responses to this RFI must be received no later than 11:00 a.m. eastern time (ET) November 6, 2019. Respondents shall email responses to the following email address: contact@example.gov. Please direct any questions regarding the posting of this RFI to the attention of the Offshore Patrol Cutter (OPC) Program at contact@example.gov. To assist the Government with tracking responses, please reference "Offshore Patrol Cutter (OPC)" and company's name in the subject line. Telephonic responses will not be accepted. Follow-up discussions may be conducted with respondents. Purpose On October 10, 2019, the U.S. Department of Homeland Security approved and granted extraordinary relief to Eastern Shipbuilding Group, Inc., on its OPC contract, for up to four hulls as a result of the impact of Hurricane Michael (DHS & USCG press releases are available at the following links: https://www.dcms.uscg.mil/Our-Organization/Assistant-Commandant-for-Acquisitions-CG-9/Newsroom/Latest-Acquisition-News/Article/1987279/department-of-homeland-security-approves-limited-extraordinary-relief-for-offsh/ and https://www.dhs.gov/news/2019/10/11/dhs-extends-contract-relief-offshore-patrol-cutter). The USCG is now working to further develop and finalize its acquisition strategy for completing the OPC Program of Record of 25 hulls. The purpose of this RFI is to obtain feedback on a notional OPC acquisition approach and schedule for completing the OPC Program of Record as soon as possible. Notional Approach & Schedule Attachment 1 is a notional schedule that outlines a high-level acquisition approach where multiple Government-funded Industry Studies contracts may be awarded to assist in the refinement and completion of the existing OPC Detail Design and the development of a Detail Design and Construction (DD&C) solicitation to facilitate delivery of affordable OPCs to the fleet as quickly as possible, while reducing program risk over the course of the Program of Record. Under this approach, it is anticipated that upon completion of Industry Studies, the USCG would award one or more competitive contract(s) for completing the Detail Design and Construction (DD&C) of OPCs in a continued effort to fulfill the USCG's Program of Record requirements for 25 OPCs. In order to meet the OPC Program's operational fleet needs, it is assumed that Shipbuilders would utilize the mature parts of the existing OPC functional design - to the maximum extent possible - and mature any incomplete aspects of the detail design. The existing functional design, including selected 2D design drawings, calculations, and diagrams, will be made available for Industry Studies contract awardees and will not be warranted by the Government. While schedule is a major driver, program affordability must remain a constant consideration. Industry Studies Contracts: In early FY20, the USCG intends to release a solicitation for multiple-award, Government-funded Industry Studies to prospective prime Shipbuilders for an OPC Detail Design and Construction (DD&C) contract. It is anticipated that the Government will award Industry Studies contracts to Shipbuilders able to build (i.e., with a certified launch facility), design (i.e., Shipbuilders with in-house design capability or a designer as a team member), and have the capacity to deliver (i.e., within the shipyard's current build schedule) OPCs featuring Command and Control, Navigation, Aviation, and Navy-furnished Combat systems no later than the dates included in the notional schedule below. As part of the Industry Studies solicitation, the Government may provide a draft OPC System Specification, technical data package, and draft DD&C Statement of Work. This data describes a basic OPC functional design, which has completed a Critical Design Review. Shipbuilders may be required to use this non-warranted data as the basis for completing an affordable Detail Design of the OPC on an accelerated delivery timeline. An overview (placemat) of this functional design will also be provided to Industry Study awardees. As part of Industry Studies, the Government is interested in understanding how the 2D functional design will be transitioned and incorporated into a final 3D production design for OPC construction at each Shipbuilder's facility. It is anticipated that each Shipbuilder will conduct several cost, schedule, capability and technical studies to support validation and refinement of its proposed OPC Detail Design and transition to a production design. The results of the Industry Studies will further inform a Government RFP for an OPC DD&C contract. Detail Design and Construction (DD&C) Contract(s): The Program intends to release an RFP, through separate full and open competition, leading to award of Long Lead Time Material (LLTM) and DD&C for OPCs in an effort to complete the OPC Program of Record of 25 hulls. The OPC Program seeks industry feedback on the notional program schedule (Attachment 1) as well as industry feedback on how construction of OPCs could be further accelerated and how acceleration would affect program risk and cost. Requested Information from Industry Acquisition Strategy Feedback 1. Given the publicly-available information and description provided above on the status of the OPC program, please provide a recommended contracting approach for the USCG to obtain Long Lead Time Material (LLTM), Detail Design, and Construction of OPCs in an effort to complete its Program of Record of 25 hulls. Describe perceived risks, impediments to competition, and opportunities available to the USCG to incentivize robust industry interest and competition and maintain program affordability. Examples of other input being sought includes, but is not limited to, contract type, Industry Studies scope of work, performance incentives, evaluation criteria, source selection approach, etc. 2. Identify risks with the notional approach described in this RFI, suggest measures to mitigate risk, and identify potential opportunities to accelerate the notional schedule, while maintaining program affordability. 3. Provide a notional plan of action and milestones for how your company would meet or accelerate the delivery dates depicted in the notional schedule provided in this RFI, while maintaining program affordability. 4. Identify how your company would approach using a Government-provided, non-warranted functional design to construct one or more OPCs. Discuss any potential technical risks associated with refining/completing an existing design from industry's perspective. Describe your company's preferred approach to completing an OPC production design, based on the notional schedule outlined in this request, and how your company views a requirement to utilize a non-warranted functional design data package. 5. Provide input on the potential use of a block buy contracting approach during the course of the program and recommendations for incorporation of such an approach if your company deems that block buy contracting is feasible. Also, if your company deems that block buy contracting is not feasible, explain the rationale against using this approach. 6. Indicate if constructing two hulls per year is feasible and provide your company's expected shipbuilding capacity with respect to constructing multiple hulls per year. Any recommendations or input on the overall production schedule are encouraged. Respondent Company Information 7. Please provide the current status of the DFARS-based certifications or approvals of your company's: 1) Accounting System (DFARS 252.244-7006); 2) Earned Value Management System (DFARS 252.234-7002); 3) Purchasing System (DFARS 252.244-7001); and 4) Estimating System (DFARS 252.215-7002). 8. Aspects of this program will require access to Secret material. Please address your company's ability to meet personnel and facility security requirements. 9. Provide one recent example of your company's experience in delivering ships featuring C5ISR, Navigation, Aviation, and Combat Systems, and identify major subcontractors used to manage development, construction, and/or integration of those systems. 10. Provide a yard-loading schedule that demonstrates your company's expected shipbuilding capacity to support the OPC program and its planned serial, multiple-hull build approach. 11. Indicate your company's interest in participating in the potential future Industry Studies and DD&C contracts.

More opportunities from Department Of Homeland Security → Hq Contract Operations (CG-912)(000

Same awarding agency

NAICS: 336612
Federal
USCG - Response Boat, Small Third Generation (RB-S III)
Solicitation # USCG-RB-S-III-2026
The United States Coast Guard is seeking a contractor to design, build, test, and deliver the Response Boat, Small Third Generation (RB-S III) to replace the aging 29-foot RB-S II fleet. This small business set-aside acquisition involves the procurement of up to 400 boats for the USCG and 100 modified variants for other federal agencies. The contractor will be responsible for providing the vessels, trailers, full logistics and supply support, technical documentation, and configuration management. The RB-S III is intended for diverse missions, including search and rescue, migrant interdiction, and law enforcement. The government intends to award up to four Indefinite Delivery, Indefinite Quantity (IDIQ) contracts with a ten-year ordering period, consisting of a five-year base and a five-year option. The acquisition follows a two-phase methodology: Phase I involves the award of the IDIQ contracts based on technical and conceptual designs, and Phase II requires each awardee to build a demonstration vessel for an in-water evaluation. Ultimately, one contractor will be selected for the remaining production orders. The contracts will utilize Firm-Fixed-Price and Fixed-Price with Economic Price Adjustment line items. Solicitation is expected by the end of Fiscal Year 2026, with awards anticipated in the second quarter of Fiscal Year 2027.
Boat Building

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS