UPS Installation and Electrical Integration Services

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → Navsup Flt Logistics Ctr NorfolkView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Norfolk, VA, 23511, USA

Set-Aside

NONE

Documents

This scope was carved out of N0018926QW366.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Replacement UPS

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Flt Logistics Ctr Norfolk
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Navsup Flt Logistics Ctr Norfolk
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical installation and integration for prime contractors on NAVSUP Fleet Logistics Center Norfolk projects. Installs an Eaton 9155 UPS and performs electrical modifications to the power infrastructure at the ATC radio receiver site (NM74). Requires personnel compliance with Naval Station Norfolk base security procedures. Delivers a fully installed and operational UPS system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is soliciting proposals for a Firm-Fixed-Price task order under an 8(a) MACC IDIQ to replace two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures for protection against salt air and moisture. The scope includes integrating the generators with the existing fuel and electrical systems, installing two new NEMA 3R automatic transfer switches with rust-resistant enclosures, and securing the units to the existing concrete slab using Grade 5 or higher galvanized anchor bolts. A generator load bank test is required for both new units. The estimated project magnitude is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The award will be based solely on the lowest total evaluated price. Offerors must submit proposals by September 29, 2026, using a detailed pricing template broken down by CSI division. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and the provision of performance and payment bonds. Personnel must undergo security background checks, sign non-disclosure agreements, and obtain PIV cards for system access. The contractor is responsible for providing a project schedule within 15 days of the Notice to Proceed and must perform work during regular business hours, Monday through Friday, 7:30 am to 4:00 pm. Final acceptance is contingent upon preliminary and final inspections coordinated with the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
This project involves a firm-fixed-price task order under a MACC multiple-award IDIQ contract to upgrade the LED lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The scope of work includes providing all engineering, labor, supervision, equipment, and materials to replace existing fluorescent fixtures, lamps, and ballasts with energy-efficient LED lighting and occupancy sensors. The contractor is responsible for the removal and proper disposal or recycling of all replaced materials. The estimated magnitude of the project is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. Technical requirements include a minimum two-hour training session for facility maintenance personnel and a commissioning report verifying 100 percent fixture and control operation. The project must comply with the Davis-Bacon Act for prevailing wages and adhere to standards from OSHA, ADA, NFPA, the International Building Code, and the American Correctional Association. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40ft steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to provide high-security, environmentally controlled space for forensic science technicians. The scope of work includes the installation of two 42ft by 10ft reinforced concrete slabs, connection to the nearest electrical circuit via PVC conduit, and the equipping of each unit with split-system A/C, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each office must also include four security windows and a 5-pound ABC fire extinguisher. The project is governed by NFPA 70 and International Building Code standards, with a requirement that all materials comply with the Buy America Act. The contract is a Firm-Fixed-Price task order issued under a MACC multiple-award IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with work conducted during standard business hours from Monday to Friday. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. Contractors must adhere to Davis-Bacon prevailing wage rates and meet strict security requirements, including the signing of DHS Non-Disclosure Agreements and the acquisition of ICE-provisioned PIV cards for personnel. Payment requests are to be submitted electronically via the Invoice Processing Platform accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and disposal of seven existing electrical switchgear stations in Buildings 137 and 138 and the installation of new switchgear. This scope includes reworking existing conduits and conductors, reconnecting six stations to existing unit substation style transformers, and installing one new 480V dry type transformer to replace an existing 15kV switch and transformer. Additionally, a 5-way 15kV SF6 switch in Building 138 Vault 1 will be replaced with a new 6-way SF6 switch. The estimated cost for this work ranges from 1,000,000 to 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract is awarded based on the lowest price, with proposals due by 13:00 local time on September 10, 2026. Due to the critical nature of the electrical systems, power outages must be limited to 72 hours and scheduled over three-day holiday weekends. Technical requirements specify the use of factory-engineered switchboards with specific voltage ratings and a short-circuit current rating of 65,000 rms symmetrical amperes, adhering to NEMA PB 2 and UL 891 standards. Safety compliance is mandatory under EM 385-1-1 (2024), and specific restrictions apply to hazardous areas in Building 137. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Final acceptance is contingent upon a series of punch-out and pre-final inspections, with the contractor providing a certified QC Manager to oversee the project.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in about 9 hours
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work involves removing six existing fire alarm bells and replacing them with six Cooper Wheelock HSW horn/strobe notification appliances, ensuring all new devices are integrated into the existing fire alarm system according to code and field conditions. Bids are due by September 16, 2026, and will be evaluated based on overall best value. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. The project is subject to Construction Wage Rate Requirements for federal facilities, requiring compliance with California prevailing wage determinations for San Bernardino County and weekly certified payroll submissions. For bids of $25,000 or more, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Required submission documents include the MTC Supplier Packet (W-9, Supplier Self-Certification, and Acceptance of Terms & Conditions), a detailed cost breakout covering materials, labor, and equipment, and a Unique Entity ID (UEI) for first-tier subcontractor reporting. Contract administration includes a two-stage inspection process consisting of a substantial completion inspection to develop a punch list, followed by a final inspection upon completion of all remaining items. Payment is processed via pay applications using ALA G702 G703 forms, supported by a previously submitted Schedule of Values. The contractor must begin work within five business days of the agreed-upon start date following the issuance of a Notice to Proceed. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and SDVOSB certifications.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Defense → Navsup Flt Logistics Ctr Norfolk

Same awarding agency

NAICS: 337214
New
Federal
NOB Weather - Furniture
Solicitation # N0018926QL401
Solicitation N0018926QL401 is a firm-fixed-price requirement issued by NAVSUP FLT LOG CTR Norfolk for the purchase, delivery, installation, and disposal of office furniture for the Fleet Weather Center Norfolk (FWC-N) located in Norfolk, Virginia. The scope of work covers three specific areas: Rooms 124, 125, and 129 in Building U-117. Key deliverables include 38 motorized height-adjustable workstations for the watchfloor and sofas for the CPO Mess, with all items requiring strict adherence to ADA guidelines, ergonomic standards, and specific clearance requirements for personnel and wheelchairs. The period of performance is scheduled from September 30, 2026, to September 29, 2027. The government will award the contract to the responsible offeror providing the most advantageous quote, primarily ranking by price but reserving the right to conduct a price-past performance tradeoff. Technical submissions must include detailed part numbers, specifications, and delivery lead times, while price submissions must include a detailed breakdown of material and labor. The contractor is responsible for the complete removal of all packaging debris off-base and must ensure all furniture is perfectly leveled and cleaned prior to a joint post-installation walkthrough. Final acceptance is contingent upon the successful remediation of all punch list items and the signing of an Inspection/Acceptance Checklist. Invoicing and receiving reports must be processed electronically via the Wide Area WorkFlow (WAWF) system.
Office Furniture (except Wood) Manufacturing

POSTED

about 20 hours ago

DEADLINE

in about 6 hours
View Details
NAICS: 541330
New
Federal
JTS Curriculum Development and Support
Solicitation # N0018926QD121
Solicitation N0018926QD121 is a request for a Firm-Fixed-Price task order issued by NAVSUP Flt Logistics Ctr Norfolk under the SeaPort multiple award IDIQ program. The contract seeks curriculum developers, instructors, and programmatic support for the Joint Targeting School (JTS) located at the Dam Neck Annex of Naval Air Station Oceana in Virginia Beach, Virginia. The scope of work includes delivering in-person and online training, developing courseware such as lesson plans and student guides based on instructional systems design principles, and providing support for the Collateral Damage Estimation, Combat Assessment, and Weaponening Applications programs. The period of performance consists of a base year from September 25, 2026, to September 24, 2027, with two subsequent one-year option periods extending through September 24, 2029. The award process utilizes a two-step best-value tradeoff where the non-price quote, consisting of performance approach and past performance, is weighted more heavily than the price quote. Security requirements are stringent, requiring personnel to hold clearances ranging from Interim Secret to Top Secret with SCI access, verifiable via the Defense Information Security System. Performance is monitored through a Quality Assurance Surveillance Plan (QASP) focusing on contractor quality control, deliverable accuracy, and invoicing precision. This is not a small business set-aside. Following Amendment 0002, the deadline for receipt of quotes was extended to 0900 on September 14, 2026.
Engineering Services

POSTED

about 20 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS