USACE SPK Design Build (DB) Construction, NSA-U Consolidation Mission Facility, Utah - Notice of Intent

Closed
W9123826S0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from Sep 29, 2025 to Jan 6, 2026. The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts2 people available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA

Full Description

Show more

Notice of Intent to Limit Sources Under portion of an acquisition that uses a brand-name description 



Subject: Notice of Intent to Limit Sources of Brand Name Items – Design Build (DB) NSA-U Consolidation Mission Facility, Utah



1. Purpose: 



The U.S. Army Corps of Engineers (USACE), Sacramento District, is issuing this notice of intent to inform industry of its intent to include specific brand-name materials and equipment in an upcoming solicitation for the Design-Build NSA-U Consolidation Mission Facility in Utah.



The primary purposes of this notice are:


  • To announce the Government's intent to specify the brand-name items listed in Section 4, pursuant to Federal Acquisition Regulation (FAR) 6.302-1(c)(1), only one responsible source and no other supplies or services will satisfy agency requirements.
  • To solicit capability statements from responsible sources that can provide the specified brand-name items or can demonstrate that their alternative products are technically equivalent in all essential characteristics.
  • To gather information regarding potential sources and their capabilities in order to conduct market research and determine the availability of technically acceptable alternatives.

If no technically equivalent products are identified through this market research, the Government will proceed with a formal Justification and Approval (J&A) to incorporate the brand-name items into the competitive construction solicitation. Only the components justified as brand-name will be limited-source; the overall project will be competed.



2. Project Background:



This project requires the design and construction of the NSA-U Consolidation Mission Facility.  The scope encompasses an administrative facility, unclassified commons facility, parking structure, and vehicle control point (VCP). The objective is to construct a modern, secure, and fully integrated facility to consolidate mission-critical functions, enhance operational efficiency, and ensures seamless compatibility with existing secure infrastructure at the installation.  The SCADA system will control critical infrastructure systems such as power distribution and HVAC and must integrate seamlessly with the existing OSI-based system. The Energy Management Control Systems will monitor and control building energy usage and must be compatible with the existing building automation network. The Door Hardware/Access Control and Locksets are vital for securing sensitive areas and must integrate with the installation's existing access control protocols. Reliable network infrastructure, provided by the Network Switches/Routers, is essential for all communication and data transfer within the facility. The Raised Access Floor will provide flexible cable management, ensuring reliable power and data distribution throughout the facility. The Fire Alarm System must integrate with the existing campus-wide system, and the Locking Manhole Covers/Bolts are essential for security of underground infrastructure.



3. Justification for Brand Name Requirement:



To meet the technical and security requirements of this project, certain systems must be compatible and interoperable with the existing installation infrastructure. The use of the following brand-name components is considered essential to ensure operational continuity, cybersecurity, and physical security without introducing unacceptable risks or costs associated with integrating non-standard equipment.


The use of the specified brand-name items reduces risk and avoids potential compatibility issues, cost overruns, and schedule delays.


  • Supervisory Control and Data Acquisition (SCADA) by Open Systems International (OSI): The existing SCADA system is OSI-based, and switching to a different system would require extensive re-programming, data migration, and operator retraining, significantly increasing costs and the risk of vulnerabilities due to unknown compatibility issues.
  • Electrical Relays/Devices by Schweitzer Engineering Laboratories (SEL): SEL relays are preferred due to their proven reliability, advanced protection features, and seamless integration with the existing power management system, which also relies on SEL equipment. Using different relays would require extensive re-configuration of the protection scheme and could compromise system reliability.
  • Energy Management Control Systems (EMCS) by Automated Logic Corporation (ALC): The existing building automation network utilizes ALC, and integrating a different EMCS vendor would require extensive interface development and potentially disrupt existing energy management strategies.
  • Door Hardware-Access Control, 2C Series by Securitech, Door 2980B Lockset: Sargent & Greenleaf Co or Lockmasters, Medeco M3 ARX Cylinders, Door Hardware Trilogy locksets, Door Hardware Schlage locksets: These specific access control components (e.g., Trilogy T2/DL2700 Series, Schlage L-Series) are selected to maintain a consistent security posture and compatibility with existing keying systems and access control protocols at the installation. This ensures seamless integration and avoids vulnerabilities associated with disparate security systems. Specific locksets must also adhere to very strict UL ratings; both Sargent & Greenleaf and Lockmasters models of the 2980B lockset have been tested and are approved to meet these specific UL rating requirements and integration protocols. Two key access control by Securitech Control C2 Series facilitates NSA access control policy that requires grade 1 mortise locks with one-handed, single-motion egress. The system must also be compatible with 12V access control, have a deadbolt that will lock out the access control, and has the capability of accepting Abloy, Primus, and Medeco cylinders with separate cylinders to operate the deadbolt and access control bypass. Currently, no other manufacturer, other than Securitech, is known to produce a product with these functions.
  • Fire Alarm System by Edwards: The existing campus is currently outfitted with Edwards fire alarm systems and is integrated within the existing Central Fire Monitoring Station. The existing Central Fire Monitoring Station has been modified to incorporate monitoring and control using a matching protocol over redundant fiber optic media of the new electrical equipment. This modification will continue to be successful only if all new components are compatible with the existing Edwards system.
  • Locking Manhole Covers by Neenah Foundry, Manhole Lock Bolts by McGard: These are specified for their proven durability, tamper-resistance, and secure locking mechanisms, ensuring the protection of underground utilities from unauthorized access. The Neenah Foundry Company manhole Model R-1751C locking lid is the only available product with a two-layer locking lid system. Furthermore,  all construction projects at NSA facilities are using the Neenah Foundry Co. manhole Model, and consistency in this type of hardware helps maintain security protocols across the facility. Likewise, all construction projects at NSA facilities are using the McGard manhole lock bolts, manufactured by McGard, 3875 California Road, Orchard Park, NY 14127-4198. The NSA has an exclusive design for manhole lock bolts. The NSA uses these lock bolts at all of its facilities.
  • Network Switches/Routers by Cisco: The existing network infrastructure is primarily Cisco-based. NSA’s existing cybersecurity software suite is dependent upon the use of approved Cisco hardware models and associated NSA approved network switch configurations which are transferred into the switches by NSA’s ICS IT team after physical site lockdown has occurred. Alternative network switch hardware models are not compatible with the existing NSA Cisco centralized software suite of centralized Cisco tools. Introducing equipment from a different vendor would introduce compatibility issues, significant retraining, and could create security vulnerabilities.
  • Air Aspirating Type Smoke Detection (VESDA) by Xtralis: VESDA systems provide early and reliable smoke detection in critical areas. This is a system currently utilized across the installation. The maintenance personnel are trained specifically for the VESDA system with spare parts on-hand to maintain the system for troubleshooting.  Mean-time-to-repair is significantly lowered with a single system of which continuous operability is imperative for campus safety. The VESDAnet software is not compatible with any other manufacturer.
  • Raised Access Floor (Tate SnapLock Bolted Stringers, Concore Cementitious Filled Tiles, PosiTile by Shaw Carpet): Stringer type floor allows for long rows of tiles to be removed without fear of floor shifting which facilitates the placement of telecom cabling in the floor plenum and allows for panels to be easily removed (when not screwed to the pedestals).  With the ever-changing mission requirements, the end-use is constantly reconfiguring, relocating and completely renovating spaces. It is not feasible to keep two different brand name flooring systems in attic stock in preparation for changes to be made at desirable moments. The Concore Cementitious panels are required to facilitate easy removal of panel with a suction type floor puller. Alternative panels allow for the retention of dirt, dust and debris which cause the floor tiles to not sick or stay in place and also concrete requires special tools/hooks to remove and takes longer to removing in turn increasing labor cost. The floor panel and carpet system MUST be stand alone and not rely on any other component to maintain alignment. The carpet system shall utilize the “button tab” type to maintain its alignment. The carpet must be cut to fit the panel, not free laid or glued in place. Tate snap lock is also selected for its ability to withstand heavy load when rolled across the floor panels.

4. Summary Of Requirement:  The construction project will include Brand Name only equipment as follows:



  1. Supervisory Control and Data Acquisition (SCADA) by Open Systems International (OSI)
  2. Electrical Relays/Devices by Schweitzer Engineering Laboratories (SEL)
  3. Energy Management Control Systems (EMCS) by Automated Logic Corporation (ALC)
  4. Door Hardware-Access Control, 2C Series by Securitech
  5. Fire Alarm System by Edwards
  6. Locking Manhole Covers by Neenah Foundry
  7. Manhole Lock Bolts by McGard
  8. Network Switches/Routers by Cisco
  9. Air Aspirating Type Smoke Detection (VESDA) by Xtralis
  10. Door 2980B Lockset:  Sargent & Greenleaf Co or Lockmasters
  11. Medeco M3 ARX Cylinders
  12. Raised Access Floor
    • Tate SnapLock Bolted Stringers
    • Concore Cementitious Filled Tiles
    • PosiTile by Shaw Carpet
  13. Door Hardware Trilogy locksets
  14. Door Hardware Schlage locksets

5. Submission Requirements and Instructions


Respondents to this Notice are to provide a capabilities statement which addresses at minimum: 


· Contractor name 


· Contractor address 


· Contractor point of contact, phone, and email address 


· Contractor Business Size (i.e., other than small business or small business) 


· Contractor Unique Entity Identifier (UEI) number 


· Capabilities statement: This section must clearly demonstrate the Contractor's ability to provide the listed brand name items or technically acceptable equivalents. For each brand name item listed in Section 4, the capabilities statement must address the following:


(a) If offering the brand name item, provide documentation demonstrating authorization to sell the item (e.g., authorized distributor letter).


(b) If offering an equivalent, provide detailed technical specifications, performance data, and any relevant certifications or testing reports that demonstrate how the proposed equivalent meets or exceeds the capabilities of the brand name item. Emphasis should be placed on demonstrating functional equivalence and compatibility with existing systems (if applicable).


· Estimated delivery timeframe 


· Authorized distributor letter (if applicable) 


· Small Business Classification (if applicable) 


· Service-Disabled Veteran Owned Small Business (SDVOSB), or Veteran Owned Small Business (VOSB) SBA Veteran Small Business Certification (VetCert) (if applicable) 


· FSS/GSA Contract number (if applicable) 


· Include any relevant past performance information demonstrating experience with similar projects and equipment.  


Please limit responses to a maximum of ten (10) pages. 


Not responding to this notice does not preclude a contractor from participating in any resulting competitive solicitation.


Interested vendors must show clear and convincing evidence that alternatives to the specified items exist. Interested vendors wishing to be considered by the Government as described above must provide a copy of its brochure and any other capability statements/ data no later than 6 January 2026, 8:00 AM Pacific Time, to Contract Specialist, Natalia Gomez, U.S. Army Corps of Engineers, Sacramento District, Contracting Division, via email to natalia.gomez@usace.army.mil.  


6. Disclaimer: 


This notice is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this notice that is marked as proprietary will be handled accordingly. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this notice of intent. The Government reserves the right to utilize any information received in response to this notice for market research purposes.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
Federal
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Solicitation # W9123826BA013
The USACE SPK is soliciting design-bid-build construction services for the renovation of three critical irrigation pumping stations—Elkhorn, Riverside, and Pritchard—located along the Garden Highway Levee in Sacramento, California. The project scope involves removing existing discharge piping that penetrates the levees and installing new piping that traverses over the levees to connect with landside irrigation canals. Additional requirements include levee excavation, backfilling, pavement restoration, and utility relocation. The estimated target price range for this effort is between $10,000,000 and $15,000,000, with a total period of performance of 1,095 calendar days from the date of the Notice to Proceed. This requirement is pursued through full and open competition without a set-aside, falling under NAICS code 237110. Eligible offerors must be registered in SAM and PIEE and provide a surety letter confirming bonding capability for a single action of at least $10,000,000. The contract is subject to the Davis-Bacon Act and EM 385-1-1 safety standards. Key administrative requirements include the use of the Resident Management System (RMS) for payment requests and the maintenance of a rigorous Quality Control program. Proposals must be submitted by November 3, 2026, and must include a completed SF 1442, bid guarantee, and a pre-award survey.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
Federal
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California
Solicitation # W9123827X1CQR
The United States Army Corps of Engineers Sacramento District is conducting market research via Sources Sought Notice W9123827X1CQR for a potential levee repair and remediation project known as the Sacramento River East Levee Contract 5 (SREL C5). Located in Sacramento, California, the project involves remediating approximately 0.4 miles of levee segments south of downtown. The scope of work includes the construction of seepage and stability berms and buried curb walls, utility relocation and protection, soil management, and site restoration. The government estimates the construction value between $6,000,000 and $9,000,000, with an anticipated performance period of 411 calendar days from the Notice to Proceed. The government anticipates issuing a firm-fixed-price solicitation in mid-November 2026, with an intended award date in mid-February 2027. The requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and Product Service Code Y1LC. Depending on the response from small business concerns, the acquisition may be set aside for small businesses under FAR 52.219-14 or competed full and open, in which case FAR 52.236-1 regarding self-performance would apply. Interested parties must submit a capability statement by 11:00 a.m. PT on October 23, 2026, detailing their experience with similar projects over the last six years and providing a surety letter to prove bonding capability.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 2 days
View Details
NAICS: 541620
Federal
USACE Sacramento District (SPK) $47.2M Planning, Environmental, and Cultural Services (PECS) MATOC
Solicitation # W9123826RA024
The USACE Sacramento District is soliciting for a 47.2 million dollar Multiple Award Task Order Contract (MATOC) under solicitation W9123826RA024 for Planning, Environmental, and Cultural Services (PECS). This contract, categorized under NAICS code 541620, provides comprehensive support for civil works and military actions throughout the feasibility, design, construction, and operations and maintenance phases. The scope of work encompasses environmental planning and compliance, including NEPA and CEQA tasks, species and habitat surveys, air and noise assessments, and construction monitoring. Additionally, the contract covers cultural resources services, focusing on Section 106 compliance, NHPA, NAGPRA, and ARPA support, tribal consultations, the development of Memoranda of Agreement and Programmatic Agreements, and specific archival and curation requirements. Interested vendors are encouraged to attend a virtual industry meeting on September 15, 2026, at 11:00 AM Pacific Daylight Time via Microsoft Teams. To participate, vendors must submit a capability statement not exceeding four pages to the designated contracting email address prior to the meeting. The primary point of contact for this opportunity is Sean Summer, and the contract is managed by the Department of Defense through the USACE Sacramento District office located in Sacramento, California.
Environmental Consulting Services

POSTED

29 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS