USCGC SPAR FUEL TANK CLEANING AND INSPECT

Awarded
70Z8526Q002360Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves the decommissioning and removal of two existing Honda BF250A outboard engines and legacy iST components, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work includes comprehensive digital rigging, the installation of new Honda iST electronic control heads at dual helm stations, integration with the existing NMEA 2000 backbone and SeaStar Power Assist steering system, and a full fuel system overhaul using USCG Type A1-15 lines. The project concludes with factory diagnostic checks and a minimum two hour sea trial to validate performance and safety protocols. To ensure quality and warranty coverage, the contractor must be an authorized Honda Marine Dealer or Service Center and employ technicians with at least five years of experience with commercial aluminum vessels and complex marine networks. Proposals must be submitted as a PDF by November 13, 2026, and must provide a firm-fixed price. Award selection is based on a 100 point evaluation criteria, with a preference for responsible Indian Offerors. The contract requires the contractor to maintain significant insurance coverages, including 1 million dollars per occurrence in general liability, and mandates a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars. All disputes are subject to the jurisdiction of the Colville Tribal Court and tribal law, and contractors must comply with the Colville Tribal Employment Rights Ordinance.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
Federal
Preserve, Passage In 4-10-6-1-L
Solicitation # N6264927Q0036
Solicitation N6264927Q0036 is a firm-fixed-price requirement issued by the Navsup Flt Logistics Ctr Yokosuka for the preservation of Passage 4-106-1-L on the USS RUSHMORE (LSD-47) in Sasebo, Japan. The scope of work is driven by corrosion identified during assessment and includes the replacement of 18 square feet of lightweight concrete deck covering, the preservation of 270 square feet of bulkheads and overhead surfaces, and the replacement of 35 square feet of insulation and lagging. All work must adhere to specific military standards for epoxy primers, fiberglass insulation, adhesives, and tape. The period of performance is scheduled from January 11, 2027, to July 31, 2027, with inspection and acceptance occurring at the destination. The government intends to make a single award to the responsible offeror who provides the lowest total priced proposal, provided they quote on all items and demonstrate compliance with DFARS 252.225-7042. Eligible offerors must possess or agree to execute a Master Ship Repair Agreement (MSRA) or ABR in the Japan Region. Proposals must be submitted electronically via email and include a breakdown sheet priced in Japanese Yen. Key administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing, compliance with 29 CFR 1915 safety standards, and strict adherence to the safeguarding of controlled unclassified information and cybersecurity protocols under DFARS 252.204-7012.
Navsup Flt Logistics Ctr Yokosuka

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves the cleaning and inspection of the diesel fuel storage tanks aboard the USCGC SPAR (225’ WLB 206), which has experienced issues with contaminated fuel causing clogging in its shipboard diesel generators. Specifically, the contractor is tasked with cleaning two tanks, 3-61-1-F and 3-62-2-F, with capacities of approximately 4,340 and 3,472 gallons respectively. The contractor must remove up to 250 gallons of existing diesel fuel, thoroughly clean the interior surfaces of the tanks to remove contaminants such as biofilm, sludge, and rust without damaging coatings, and dispose of all waste fluids according to federal, state, and local regulations. The work must be performed on-site in Duluth, Minnesota, with all necessary labor, materials, and tools provided by the contractor. Throughout the process, the contractor is required to follow Coast Guard specifications and standards, maintain detailed documentation including chain of custody for removed fluids, and support operational testing of tank equipment both before and after cleaning. The tanks must remain open for at least 24 hours after repairs, with closures conducted under Coast Guard supervision using approved gasket materials. The contractor will conduct ultrasonic thickness and pit-depth measurements of tank plating, and daily progress reports must be submitted to the Coast Guard’s Engineering Officer, along with a comprehensive trip report within 48 hours post-completion. The period of performance is limited to 21 calendar days from award, with work generally conducted during weekday business hours unless adjustments are coordinated. Travel expenses are the responsibility of the contractor.

General Info

Clean and inspect two diesel fuel tanks on USCGC SPAR; remove contaminants, ensure compliance.

Contract Value

$42,327.6

NAICS

336611 - Ship Building and Repairing

Place of Performance

Duluth, MN, 55802, USA

Set-Aside

SBA

Award Issued Date

Documents

1

USCGC SPAR Fuel Tank Cleaning Statement of Work

DOC, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

STATEMENT OF WORK (SOW)


FOR


USCGC SPAR Fuel Tank Cleaning and Inspect



USCGC SPAR has dirty/contaminated fuel tanks that supply their SSDG and require cleaning to ensure high quality fuel is provided to their diesel driven machinery and has an immediate need for contracted support for tasks outlined in this Statement of Work (SOW).




1.0 GENERAL



    1. Background 

The 225’ WLB asset, USCGC SPAR (225’ WLB 206), has an abnormally high rate of fuel filter consumption on their SSDGs. Ships force inspected fuel tanks and found biofilm buildup and other contaminants present in high volume in 3-61-1 and 3-62-2 fuel tanks. This foreign material is what is clogging the fuel filters.   



    1.  Scope 

The scope of this contract is defined by the efforts and tools required to support USCGC SPAR (225’ WLB 206). The Contractor shall provide all labor, materials, and tools necessary to clean the following tanks.





TYPE OF TANK


LOCATION


CAPACITY - 95%
(gallons)


LOW SUCTION (gallons)


Diesel Fuel Storage


3-61-1-F


4,340


<100


Diesel Fuel Storage


3-62-2-F


3,472


<100




    1. OBJECTIVE

The goal is to return CGC SPAR (225’ WLB 206) fuel tanks to designed system parameters.



    1. APPLICABLE DOCUMENTS


      1. Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:



           


Coast Guard Drawings


Coast Guard Drawing 225B WLB 541-001, Rev G; Fuel Oil System Diagram


Coast Guard Drawing 225B WLB  541-007, Rev D; Incinerator Fuel Oil Service Tank


Coast Guard Publications



Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements


Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes


Other References


Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections


Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets





  1. SPECIFIC REQUIREMENTS/TASKS

Unless otherwise stated, this contract applies to on-site support for USCGC SPAR (225’ WLB 206) in Duluth, MN.




2.1 Clean and Inspect Fuel Tanks



 2.1.1 Protective measures.  The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).


2.1.2 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:


  • Fuel
  • Piping
  • Tank access cover

2.1.3 Remove up to a total of 250 gallons of diesel fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the Engineering Officer (EO) upon completion of work.


2.1.4 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations.


2.1.5 Provide the following to support Coast Guard personnel to refuel equipment:


  • tagout crane way equipment
  • Oil transfer supervisor.

Vessel may come in with less tank fluid contents than specified above.


NOTE


Initial and post repair operational tests apply only to tanks that possess TLIs.


NOTE


Coast Guard personnel will operate all shipboard machinery and equipment.



2.1.5 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit CFR.


  • TLI for tanks

2.1.6 Plug log. The Contractor must keep a written record of all plugs put in any tank vents. A separate list must be kept for each tank being entered.


2.1.7 Ensure that all plugs are removed from each tank upon completion of work in the tank.


2.1.8 The plug log must be available to the Coast Guard Inspector/EO when the inspector is performing his close-out inspection on each tank.


2.1.9 Cleaning requirements.   The Contractor must refer to Coast Guard Drawings 225B WLB 541-001 and 225B WLB 541-007 for guidance. The Contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.


2.1.10 Tank content and waste disposal. The Contractor must dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the EO upon completion of work.


2.1.11 Inspection. The Contractor must visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Complete the “Tank and Void Assessment Form” (found in the Work Item titled “General Requirements”) and submit via CFR.  Include the following, as applicable:


  • Tank structural condition.
  • Inaccessible areas.
  • Condition of tank coating, including; measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).
  • Tank level indicator (TLI) and/or float switch condition, as applicable.
  • Sounding/vent tube and striker plate condition (including vent check valve and waster piece).
  • Suction and discharge piping condition.
  • Fastener material and condition (correct fastener material is stainless steel).

2.1.12 Tank closing. The Contractor must ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the EO at least 24 hours prior to closing the tank(s) and ensure tank closure is accomplished in the presence of the Coast Guard Inspector/EO. After satisfactory inspection by the Coast Guard Inspector/EO and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183. Chase threads on studs to ensure even installation of the access covers. Renew any damaged nuts.


2.1.13 Operational test, post repairs. After completion of work and in the presence of the Coast Guard Inspector/EO, the Contractor must thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition.


  • Designated tank TLIs
  • Vent check valves

NOTE


Coast Guard personnel will operate all shipboard machinery and equipment.


2.1.14 Ultrasonic thickness (UT) measurement. The Contractor must take a total of 50 UT measurements of tank plating in each tank in accordance with SFLC Std Spec 0740, Appendix C in locations designated by the Coast Guard Inspector. Submit a CFR.


2.1.15 In addition to the UT measurements, take up to 10 pit-depth measurements within each tank, using a suitable pit depth gauge.



2.2. NOTES


2.2.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.


2.2.2 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.


2.3.3 Tank content restoration. The Ship’s force will procure new fluids and refill all tanks at the appropriate time



2.3 Test Thoroughly and Document


The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Officer (EO) or the EO’s designated representative.



2.2.1    The Contractor shall provide a trip report documenting all findings no later             than 48 hours after returning to the home office.



  1. CONTRACTOR PERSONNEL 


3.1       The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.




  1. OTHER APPLICABLE CONDITIONS


4.1 PERIOD of Performance 


The period of performance for this contract shall not exceed 21 calendar days from the date of award.



4.2 PLACE OF PERFORMANCE 


The primary place of performance will be at CGC SPAR (225’ WLB 206) at 1201 MINNESOTA AVE, DULUTH MN 55802 USA unless an alternate location is approved by the Coast Guard.



4.3 HOURS OF OPERATION


Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays).  However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship’s operations. 



4.4 TRAVEL 


Contractor travel may be required to support this requirement.  All travel required by this task shall be provided by the Contractor at no expense to the Government.



4.5 Daily Progress Reports 


The Contractor shall hold a daily progress meeting with the Engineer Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work.



4.6 General Report Requirements 


The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).



5.0 GOVERNMENT FURNISHED RESOURCES


NA


6.0 CONTRACTOR FURNISHED PROPERTY 


The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.



  1. GOVERNMENT ACCEPTANCE PERIOD

The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.  If the deliverable is acceptable, the EO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.        



8.0 DELIVERABLES


The Contractor shall provide a trip report IAW 2.2 of this SOW.



9.0 Point of Contact


USCGC SPAR Engineering Officer


CWO2 Jason Wilson


P:+1 (555) 000-0000


More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS