This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on January 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

USCGC Stone AC Condenser Renewal

Closed
70Z08526Q0002181Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project involves a six-phase process including the decommissioning and removal of two existing Honda BF250A outboard engines, a structural assessment of the transom, and the installation of two new Honda BF250D Drive-by-Wire outboards. Key technical requirements include the installation of new-generation Honda iST electronic control heads at primary and secondary helm stations, integration with the existing NMEA 2000 backbone and SeaStar PA1315-2 Power Assist Steering system, and a comprehensive fuel system upgrade using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two-hour sea trial to validate performance and safety protocols. The Tribe will deliver the vessel to the contractor's facility, which must provide a secure, fenced yard or indoor shop. Proposals are due by November 13, 2026, and must be submitted in PDF format. Evaluation is based on a 100-point scale with significant preference given to Colville Business Enterprises and other Indian-owned businesses. Award criteria prioritize reliability and effectiveness over the lowest cost. Selected contractors must provide proof of Honda Marine Authorized Dealer status, maintain appropriate liability insurance, and agree to either a 25 percent retainage or a performance bond, with a bond being mandatory for contracts exceeding 100,000 dollars. All payments are subject to the Tribes appropriation process and availability of funds.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in 17 days
NAICS: 336611
New
Federal
TSV4 NARR MESSING AND MODERNIZATION
Solicitation # N0018927QL008
NAVSUP FLT LOG CTR Norfolk is soliciting a firm-fixed-price contract for the development of a drawing package and Bill of Materials (BOM) to support habitability upgrades for the TSV4 Narragansett. The scope of work focuses on the vessel's messing, berthing, stateroom, and sanitary spaces at Joint Expeditionary Base Little Creek-Fort Story in Virginia Beach, Virginia. This effort is strictly limited to assessment and documentation; it specifically excludes any procurement, fabrication, removal, or installation of shipboard components. The project is a total set-aside for small businesses, including service-disabled veteran-owned small businesses, under NAICS code 336611. Key deliverables include a draft drawing package and BOM due 40 calendar days after award, with the final delivery of two electronic files and two full-size paper copies in NAVSEA format due within 61 calendar days. Contractors must adhere to several technical standards, including MIL-STD-2003 for electric plants, MIL-STD-777 for piping, and General Specifications for Overhaul of Surface Ships. A mandatory ship check at Colonna's Shipyard in Norfolk is required for eligibility, and failure to attend will result in disqualification. Award will be based on the best value, evaluating the mandatory ship check on a pass/fail basis and the technical approach on an acceptable/unacceptable basis, with the final selection going to the lowest total evaluated price.
Navsup Flt Logistics Ctr Norfolk

POSTED

about 21 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract involves the complete renewal and repair of the air conditioning condenser system for the #1B refrigerant circuit aboard the USCG Cutter Stone, located in Charleston, South Carolina. The contractor is responsible for flushing the refrigerant side, overhauling or renewing various components such as compressors, oil separators, transducers, solenoid valves, and thermal expansion valves, and restoring the equipment to full operational status in the Air Conditioning Equipment Room. The scope includes strict adherence to multiple Coast Guard and Surface Forces Logistics Center specifications covering general repair requirements, welding, fire prevention, and system preservation. The contractor must provide qualified personnel with specific expertise in the York 130-ton HFC-134A air conditioning plant for onsite technical support, ensure environmental and safety protections, and comply with rigorous refrigerant handling and disposal regulations. Key tasks include detailed inspections like borescope examination of piping and evaporators, leak testing, component replacement with government-furnished equipment when applicable, system flushing using compatible materials, and pressure tests under Coast Guard supervision. Post-repair efforts must include operational tests with precise data collection and oil sampling to verify system reliability. Additional responsibilities cover rigging with appropriate testing and labeling of lifting equipment, maintaining at least one other AC plant operational during repairs, and full surface preservation and touch-up painting of affected areas. The contract is set as a firm-fixed price, total small business set-aside, with a performance period from late January to mid-February 2026 at the USCGC Stone’s location. Award consideration emphasizes past performance, personnel qualifications, management plans, and cost realism and reasonableness. Access to the facility requires valid REAL ID and prior background checks coordinated through the Port Engineer.

General Info

Complete renewal and repair of USCGC Stone AC condenser system; compliance, testing, qualified personnel required.

NAICS

336611 - Ship Building and Repairing

Place of Performance

North Charleston, SC, 29405, USA

Set-Aside

SBA

Documents

1

SOW S23_NNN_BJA_1025_418 ACCndnsr Repair Medium Stone

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more

PLease see full SOW in attached documents



General Requirements


1. SCOPE


1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.


2. REFERENCES


COAST GUARD DRAWINGS


None


COAST GUARD PUBLICATIONS


Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements


Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes


Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response


OTHER REFERENCES


None


3. REQUIREMENTS


3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.


3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.


3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.


3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550




SN23_NNNN_51400_ BJA_1225_418


  1. ITEM 1: Air Conditioning Plant, Repair

1. SCOPE


1.1 Intent. This work item describes the requirements for the Contractor to renew the AC condenser for the #1B circuit, flush the refrigerant side of the #1B circuit, renew or overhaul various components on the refrigerant side of the #1B circuit and restore the plants back to service on the USCG Cutter Stone in Charleston, SC. Location of work is Air Conditioning Equipment Room, Compartment 3-22-0-Q. The USCG has determined that the #1B refrigerant circuit was exposed to seawater.


1.2 Government-furnished property. 


MTI


ITEM DESCRIPTION


NSN/PN




QTY


ESTIMATED COST
($/UNIT)


Y


Condenser, 130 Ton Chill Water


NSN: 4130-01-549-7737 


1 ea.


54,287


Y


York Semi-hermetic screw compressor


PN: YCWS


1 ea


69,474.00


N


Indicator, Moisture


NSN: 01-670-3068


1 ea


21.89


N


Valve, Thermal Expansion, Economizer


NSN: 01-583-7241


1 ea


1037.89


*Government-loaned property, which must be returned to the vessel upon completion of the availability.


2. REFERENCES


Coast Guard Drawings


Coast Guard Drawing 750 WMSL 508-001, Rev C, Piping and Machinery Insulation Schedule and L/M


Coast Guard Drawing 750 WMSL 516-001, Rev E, A/C & Refrigeration Piping Diagram


Coast Guard Drawing 750-WMSL_520_001, Rev H, Seawater Cooling System Diagram (ASC520001)


Coast Guard Drawing 750-WMSL-520-004, Rev E, Salt Water Cooling Unit 1320 (ASC520132-SW)


Coast Guard Drawing 750-WMSL_520_506, Rev E, Auxiliary Seawater Piping Mods FWD of FR 52.


Coast Guard Drawing FL-1204-3, Rev A, Fleet Welded Padeyes and Links




Coast Guard Publications



Coast Guard Technical Publication (TP) 7608, SWBS 514, February 2012, York/Thermaflo Oz Saver Portable Refrigerant Recovery Unit, Model 4000 (418 WMSL)


Coast Guard Technical Publication (TP) S9514-F1-MMA-010, SWBS 514, Jan 2012, Air Cond Plant HFC-134A 130 Ton Capacity Description, Operation and Maintenance Manual


Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements


Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes


Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems


Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures


Other References


Ketema LP, Sep 2002, DXT Direct Expansion Evaporator Installation, Operation, and Maintenance Instructions.


3. REQUIREMENTS


3.1 General.


3.1.1 CIR.


None.


3.1.2 AC Tech Rep. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the York 130-Ton capacity, HFC-134A Air Conditioning plants to accomplish the following on site:


  • Advise on manufacturer’s system information.
  • Assist with disassembly, inspection, repair, modification, calibration, testing and reassembly of the equipment/system.
  • Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, and reassembly as applicable.

3.1.2.1. Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.


3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000.


3.1.3.1 Protective measures - environmental. The Contractor must abide by all applicable environmental protection tasks as specified in paragraph in SFLC Std Spec 0000, Appendix A (Requirements for Environmental Protection).


3.1.3.2 Protective measures – refrigerant. The Contractor must take all necessary precautions to prevent introduction of contaminants and moisture into refrigeration system piping and components by sealing all openings.


3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:


  • Plant piping & fittings
  • Refrigerant (134a)
  • Lagging
  • Work benches

3.1.5 Refrigerant handling.


3.1.5.1 Personnel qualification. The Contractor must provide the Port Engineer documentation that ensure all prime and sub contractors servicing refrigerant-based Air Conditioning and Refrigeration (AC&R) equipment hold a current Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification), and meet all State and local regulations and licensing requirements.


3.1.5.2 Refrigerant draining and disposal. The Contractor must ensure all vessels’ Air Conditioning Plant refrigerant is drained, recovered and disposed of in accordance with all Federal, state and local environmental regulations.


3.1.6 Repair plan. The Contractor must supply a written plan of work to the Port Engineer at least 24 hours in advance of beginning work. Plan must include sequencing of work, flushing procedures, source of supply for the renewal and overhaul parts and any planned deviations from this work item.


3.1.7 Guidance. The Contractor must refer to CG Drawing 750 WMSL 516-001 for requirements, location and shipboard arrangement. The Contractor must refer to CG TP S9514-F1-MMA-010, for general & safety information, parts, operation and maintenance procedures.


3.1.8 Safety. The Contractor must familiarize themselves with and comply with applicable Warning, Caution and Attention notes invoked in CG TP S9514-F1-MMA-010, SWBS 514, Jan 2012, Air Conditioning Plant HFC-134A 130 Ton Capacity Description, Operation and Maintenance Manual.


3.1.9 Rigging. The Contractor is responsible for all rigging with the following considerations:


3.1.9.1 All existing padeyes that will be used for a lift must be pull tested to 1.5 times their Working Load Limit in accordance with SFLC Standard Spec 5000 Paragraph 3.2.7. All testing must occur in the presence of a Coast Guard Inspector.


3.1.9.2. If new padeyes are required, fabricate them in accordance with Coast Guard Drawing FL-1204-3 and SFLC Standard Spec 0740. Newly fabricated padeys must be pull tested to 2 times their Working Load Limit in accordance with SFLC Standard Spec 5000 Paragraph 3.2.7. All testing must occur in the presence of a Coast Guard Inspector.


3.1.9.3. Upon completion of testing, install a label plate in accordance with SFLC Standard Spec 5000 Paragraph B2.9.


3.1.10 Vital Loop. Contractor must keep one AC compressor from the #2 AC Plant or #3 AC Plant operating at all times. This will require installing blank flanges in the condenser supply and discharge piping for various plants throughout the work. The Contractor may bring down the AC plant for no more than an hour at a time to install the necessary blanks.


3.2 Operational test - initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.


3.2.1 The Contractor must submit an operational report following startup utilizing figure 2-16 of TP S9514-F1-MMA-010.


3.2.2 Initial operational test of the Air Conditioners can be waived if operating the AC plant will risk personnel safety and/or further damage to the system. Submit a CFR for this request for Port Engineer review.


3.3 Refrigerant evacuation. The contractor must pump down each plant in accordance with Paragraph 6-1.2.1 of TP S9514-F1-MMA-010. Deviation from this procedure must be consulted with the Port Engineer. Submit a CFR reporting the amount of refrigerant removed.


3.3.1 Prior to disposal, the Contractor must test the oil for acid and check for Air/Non-Condensable in the recovery bottle. CG Inspector must be present to verify Pressure/Temperature Relationship on recovery cylinders after recovery cylinders have settled for a minimum of 24 hours. Submit a CFR.


3.3.2 Dispose of recovered refrigerant in accordance with Federal, state, and local regulations and SFLC Std Spec 0000.


3.3.3. The Contractor must drain the lube oil from Compressor and the Oil Separator/Reservoir and dispose of it in accordance with the local, state and Federal regulations. The Contractor must also inspect the oil removed for any evidence of contamination such as water and any solid particles. Submit a CFR to the Port Engineer.


3.4 Condenser renewal. The Contractor must renew the condenser using GFP on the 1B refrigerant circuit. Model information for the condensers is shown in Table 1.


3.4.1 The Contractor must renew all gaskets and seals disturbed during the condenser renewal condenser end bells, piping and components disturbed in accomplishing this work item using new gaskets and seals.


3.4.2. Vent the air from the condenser in accordance with Paragraph 4-5.1 of TP S9514-F1-MMA-010.


3.4.3. The Contractor must install the necessary mounting brackets for the condensers in accordance with Figure 8-10 of TP S9514-F1-MMA-010. Conduct welds and NDE in accordance with SFLC Standard Spec 0740


3.4.4  In the presence of the Coast Guard inspector, the Contractor must pressure test the condenser in accordance with Paragraph 6-7.2. upon completion of the installation. The Contractor is only required to correct leaks in joints that they disturb.  Submit a CFR to the Port Engineer.





Table 1


Fuctional Service


Manufacturer


Model number


notes


Air Conditioning Unit Condenser


KETEMA


MHX-1208A-2P


Each condenser contains 84 tubes


3.5 Borescope Inspection. The Contractor must provide a borescope inspection for the #1B refrigeration circuits that includes the following components:


  • Piping leading to and from the condenser barrel, oil separator and compressor.
  • Refrigerant side of evaporator

3.6 A/C plants flush. The Contractor must plan and execute a flush of the refrigerant circuit for the #1B AC circuit. This plan must be approved by the Port Engineer prior to execution. Components that are being renewed or overhauled do not need to be flushed. The flush must accomplish the following tasks:


  • Remove particulate contamination
  • Remove rust
  • Remove saltwater residue and growth
  • Uses techniques and materials that are compatible with the AC system.
  • Include a 10-micron filter somewhere in the flushing circuit
  • Remove contamination in the evaporator tubes mechanically

3.7 Component Renewal. The Contractor must renew the following components in Table 2 of refrigeration circuit #1B in accordance with TPS9514-F1-MMA-010. The Contractor must provide any materials that are not furnished as GFE Any brazing on the A/C unit requires the AC Tech Rep on site to oversee the nitrogen purge during brazing. Comply with all requirements of SFLC Standard Spec 0740 EXCEPT do not flush with water.


Table 2


Component


Dwg 077-18317-001 Item Number


Quantity


York Part Number


Manufacturer/Model


Compressor, Screw Semi-Hermetic


2


2


364-49094-215


York DXS45LA-A46/50


Separator, Oil, Right Hand


3


2


075-56077-001


Westermeyer OS6-I5R


Separator, Oil, Left Hand


4


2


075-56077-002


Westermeyer OS6-I5L


Control, High Refrigerant Pressure


9


2


025-35948-000


Alco PS3-XF5HNB297


Transducer, Suction Pressure


15


2


025-29583-000


Danfoss 060G2154


Transducer, Discharge Pressure


16


2


025-29139-001


Danfoss 060G2153


Transducer, Oil Pressure


17


2


025-29139-001


Danfoss 060G2153


Valve, Solenoid, Liquid Refrigerant Injection


26


2


025-00245-000


Danfoss 032F4023


Valve, Solenoid, Capacity Control


27


2


025-33205-000


NA


Core, Dehydrator*


30


6


026-37540-000


Emerson HX-48



Indicator, Moisture, Cartridge


42


4


026-32800-000


Sporlan AC-20



Economizer Theral Expansion Valve.**


24


1


075-56077-002


Emerson


*The Contractor must remove all rust from the steel components of the STAS retainer assembly. See figure 2.


**Contractor must supply the packing nut wrench


3.8 Component Overhaul. The Contractor must overhaul the following components in refrigeration circuit #1B in accordance with TPS9514-F1-MMA-010:


3.8.1 Evaporator Thermal Expansion Valve (PC 23, Dwg 077-18317-001) – renew the cage assembly (PN: X9144B13B), the power head assembly (PN: XC-726MC2B) and the superheat plug (PC: X28124-1), the gasket (PN: X13455-1). The Contractor must also supply the packing nut wrench (PN: E642).


3.8.3 Main Liquid Line Solenoid Valve (PC 25, DWG 077-18317-001) – renew internal components using the Solenoid Valve Repair Kit (PN: KS30325)


3.8.4 Air Compressor Discharge Valve (PC 80, DWG 077-18317-001) – Disassemble valve and mechanically remove all internal rust.


3.9 Post-work Leak Test. The Contractor must perform a leak test of each AC circuit in accordance with Paragraph 6-2.1 of TP S9514-F1-MMA-010 upon completion of all work. The Contractor is responsible for repairing any leaks from equipment that they disturbed over the course of the work. Report results via a CFR.


3.10 A/C plants. The Contractor must restore the affected system to original configuration. Renew the refrigerant, oil, oil filter cartridge, and all liquid line filter/drier core.


3.10.1 Charging Refrigerant. Upon completion of a successful leak test, the Contractor must charge refrigerant to the unit in accordance with Paragraph 6-2.3 of TP S9514-F1-MMA-010 in the presence of a CG Inspector.


3.10.2 Prior to charging the refrigerant, the system must be pulled down to a vacuum below 500 microns for at least 5 minutes. This may be done separately or simultaneously with the vacuum requirements in TP S9514-F1-MMA-010


3.11 Operational test – post repairs. After completion of work, in the presence of the Coast Guard Inspector, the Contractor must thoroughly test and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR to the Port Engineer.


3.11.1 During final testing of the AC units, run each individual compressor by itself (no other compressors operating) for an hour, record the following data shown in Table 1-1 of TP S9514-F1-MMA-010 every five minutes and submit a CFR .


  • Compressor Speed
  • Saturation Suction Temperature
  • Saturation Discharge Temperature
  • Chilled Water Circulation flow (in GPM)
    • Chill Water Temperature Entering
    • Chill Water Temperature Leaving
  • Condenser Water Flow (in GPM)
    • Condenser Water Temperature Entering
  • Condenser Water Temperature Exiting

3.11.2 The Contractor must install additional drier cores as needed after the initial start to ensure the system is dry and free of acids and moisture.


3.11.3 The Contractor must collect two oil samples from the compressor oil after startup. One sample must be tested per C2.1.3.1 of SFLC Std Spec 5000 and one must be provided to the Port Engineer. Submit a CFR to the Port Engineer.


3.12 Touch-up preservation, general. The Contractor must prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)


3.13  FLETC Base Access Requirements: Contractors must have a valid REAL ID. Form 121 will be provided via email by the Port Engineer and must be submitted for a background check 5 business days prior to the start of the period of performance.


4. Selection Process


4.1  Best value criteria - Award of this requirement shall be made to the vendor whose proposal offers the greatest value to the government. Technical factors, past performance are more important than price.


  • Factor 1 – Past Performance

Sub-Factor 1: Quality of Performance


Sub-Factor 2: Schedule Performance


Sub-Factor 3: Management Performance


Sub-Factor 4: Cost Control


  • Factor 2 – Personnel Qualification

Sub-Factor 1: Key Personnel


Sub-Factor 2: Subcontractors


  • Factor 3 – Management Plan

Sub-Factor 1: Management Sub-Factor 2: Initial Staffing Sub-Factor 3: Phase-in Transition


Sub-Factor 4: Subcontracting Plan


  • Factor 4 – Cost

Sub-Factor 1: Realism Sub-Factor 2: Reasonableness


Sub-Factor 3: Completeness


4.2  Prior to contract issuance the prospective contractor MUST HAVE completed and/or current enrollment into System Award Management (SAM), enrollment information for which can be found at: https://sam.gov/content/entity-registration, failure to do so WILL result in disqualification and reissuance of the contract. All bids submitted by contractor shall include break down of cost for labor, materials, transportation, O/P, G/A, etc… For any further enrollment assistance and/or questions, please contact CWO3 Jason Garris +1 (555) 000-0000


4.3   Type of Contract Contemplated: This will be a firm-fixed priced purchase order.


Period of performance: January 26th, 2026- February 13th, 2026.


Address:


CGC Stone


1050 Register St


North Charleston, SC 29405




5. NOTES



FIGURE 1. Air conditioning plant configuration







 



Figure 2. Filter Assembly

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS