Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Utility Connection and Site Preparation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Coachella Valley Water DistrictView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Indio, CA, 92203, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-30.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Office Trailer For Water Reclamation Plant 7

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and commissions utility connections for a new mobile office for prime contractors on Coachella Valley Water District projects. Performs design, installation, and testing of electrical, plumbing, and water links to existing plant utilities using trenching equipment and conduit. Ensures compliance with local building codes and utility standards. Delivers fully operational power, water, and sewage connections.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → Coachella Valley Water District

Same awarding agency

NAICS: 236220
SLED
Office Trailer For Water Reclamation Plant 7
Solicitation # 2026-30
The Coachella Valley Water District has issued Invitation for Bids 2026-30 for the removal and replacement of a mobile office trailer at Water Reclamation Plant No. 7 in Indio, California. The project requires a qualified contractor to dispose of an existing dilapidated 36-foot by 60-foot trailer and design, furnish, deliver, install, and commission a new replacement unit of the same size. The new facility must include private office spaces, a locker room, showers, and restrooms, while maintaining ADA compliance for entrances and adhering to California Building Code, Title 24 Energy Code, and National Electric Code standards. The contractor is also responsible for providing a complete HVAC system and all necessary utility connections. The contract will be awarded to the lowest responsive and responsible bidder. Qualified bidders must hold a B General Building Contractor License, be registered with the California Department of Industrial Relations, and possess at least five years of experience with three similar projects completed. The project is classified as public works, requiring the payment of prevailing wages. The term of the contract is approximately six months, with all work to be completed within 150 calendar days. Bids are due by September 23, 2026, via the PlanetBids portal and must include a bid bond for 10% of the total price. Upon award, the contractor must provide performance and payment bonds equal to 100% of the contract price and a minimum ten-year warranty on materials and workmanship. Payment is processed monthly with a five percent retention released 35 days after final acceptance, which follows a two-walkthrough verification process.
Commercial and Institutional Building Construction

POSTED

17 days ago

DEADLINE

in 11 days
View Details
NAICS: 237110
SLED
Leon Housing Water Consolidation Project
Solicitation # 2026-27
The Leon Housing Water Consolidation Project, managed by the Coachella Valley Water District, aims to consolidate four subsumed water systems—Leon Housing, Duran's Farms, Villa de Josue, and Oscar Cruz—into the district's receiving system. The scope of work includes the installation of approximately 7,400 linear feet of 12-inch potable water mains, 220 linear feet of 24-inch steel casing for jack and bore operations, and 2,210 linear feet of 2-inch pipelines equipped with meters and backflow devices. Additionally, the project requires 6-inch diameter piping to connect water mains to 15 fire hydrants or backflow preventors, along with the installation of various appurtenances such as blow-off assemblies and valves. The total estimated contract value is 6,634,954 dollars, which includes a 10 percent change order contingency. Technical specifications mandate the use of ductile iron and PVC piping, resilient-seated gate and butterfly valves, and specific concrete and masonry standards for thrust blocks and manholes. The contractor is responsible for comprehensive site activities, including dewatering, trenching, hydrostatic testing, and disinfection of piping. Environmental compliance is critical, requiring adherence to the Mitigation Monitoring and Reporting Program and the federal Endangered Species Act. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a construction completion deadline of December 31, 2028. Required security includes performance and payment bonds equal to 100 percent of the contract price, and bidders must comply with prevailing wage laws and California Air Resources Board certifications.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS