Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Utility Enclosure and Box Components Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 326199
New
Federal
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication
Solicitation # W912EK27RA001
The U.S. Army Corps of Engineers, Rock Island District, is soliciting proposals for the design, testing, fabrication, and delivery of ten Fiber Reinforced Polymer (FRP) composite structures for the Brandon Road Lock and Dam in Joliet, Illinois. The required deliverables include two 16 x 16 ft dam headgates, two 14 x 14 ft filling valves, two 14 x 14 ft filling downstream bulkheads, two 8 x 8 ft flushing valves, and two 8 x 8 ft flushing valve bulkheads. The project follows Allowable Stress Design procedures and requires the use of the vacuum infusion process for fabrication. Delivery is expected to begin within 365 calendar days of the notice to proceed, with full performance completion within 730 calendar days. This is a 100% Small Business Set-Aside procurement using a Lowest Price Technically Acceptable (LPTA) source selection process. To be deemed technically acceptable, offerors must provide three fact sheets demonstrating the fabrication of FRP structures weighing over 10,000 pounds, along with resumes for a Professional Engineer and a fabrication supervisor with similar experience. Proposals must be submitted in four separate PDF volumes via the PIEE Solicitation Module by November 30, 2026. Award requirements include a bid guarantee and the provision of performance and payment bonds equal to 100 percent of the contract price within ten days of award.
W07V Endist Rock Island

POSTED

about 10 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This subcontract focuses on the supply of lids and extension components for non-concrete electrical utility boxes to support prime contractors working on inventory projects for the City of Palo Alto Electric Operations Department. The scope specifically requires the provision of Quazite PG1730HH00PN and PG2436 RA08 components, or approved equivalents that meet the same technical specifications. Managed under the Utilities agency in California, the contract is categorized under NAICS code 326199. Interested parties must submit their responses by the deadline of October 14, 2026, to ensure the timely delivery of essential materials for utility box enclosures.

General Info

Supply of electrical utility box lids and extensions for City of Palo Alto.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ199307.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Purchase and Delivery of Electric Parts for Inventory

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Ultra-High Temperature Composite (UHTC) ManufacturingOpen now, due in 15 days
  • Manufacture of High-Durability Composite Railroad TiesOpen now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies lids and extension components for non-concrete electrical utility boxes for prime contractors on City of Palo Alto Electric Operations Department inventory projects. Supplies Quazite PG1730HH00PN and PG2436 RA08 components. Materials must meet Quazite or approved equivalent specifications. Delivers lids and extensions for utility boxes.

More opportunities from California → Utilities

Same awarding agency

NAICS: 238220
New
SLED
Skywest Pump Station AC Unit Replacement
Solicitation # 27-013
The City of Hayward is soliciting quotes for the replacement and installation of the HVAC system at the Skywest Pump Station, a critical facility within a regional emergency water intertie. The project involves the removal and legal disposal of aging HVAC equipment and the installation of a new 20-ton split-system HVAC system, preferably from York or an approved equal, utilizing R-454B refrigerant. The scope of work includes field verification of site conditions, installation of galvanized sheet-metal transitions and ACR copper piping, and all necessary electrical work between the existing disconnect and the new equipment. Key technical requirements include the provision of refrigerant detection, safety features, and phase-monitoring protection for the condensing unit. The contract will be awarded to the bidder providing the lowest proposed cost who also demonstrates the required experience and capacity to perform the work. Applicants must possess a current C-20 license and EPA Section 608 Technician Certification. Bids must be submitted electronically via the OpenGov portal by November 24, 2026, and must include a cover letter, three references from the past five years, proof of insurance, and completed mandatory forms, including a Noncollusion Affidavit and an affirmation of non-involvement in nuclear weapons production. The project is subject to California prevailing wage requirements and requires a labor and materials or performance bond upon contract execution. Payment will be administered through progress payments based on an approved schedule of values.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS