Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Connecticut was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

VCT Flooring Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
Roswell JCC - Dorm Flooring Replacement (Carpet Squares)
Solicitation # roswell-jcc-dorm-flooring-replacement-carpet-squares
The Career Systems Development Corporation is soliciting proposals for the removal and replacement of deteriorated flooring in the male and female dorm buildings (Building 533/558) at the Roswell Job Corps Center in New Mexico. The project involves the demolition and off-site disposal of roll carpet that is over 20 years old, followed by subfloor preparation and the installation of new carpet squares and approved cove base in up to 22 rooms per floor. All work must be coordinated through the Facilities Department and performed between 7:00 am and 4:00 pm, Monday through Friday, following a written Purchase Order from the Purchasing Department. This solicitation is set aside for small businesses and various disadvantaged business categories under NAICS code 238330. The project is subject to the Davis Bacon Act Wage Determination NM20260014, Revision 1, requiring the submission and approval of weekly certified payroll reports as a prerequisite for payment. Contractors must adhere to NFPA 101, NFPA 70, and standard building codes, maintain strict safety protocols, and ensure no unnecessary interaction with students. Proposals due by September 18, 2026, must include a detailed breakdown of material and labor costs, the total project cost, a safety compliance plan, specified exclusions, and comprehensive warranty information. Final deliverables include the completed installation and the provision of operation manuals to the Facility Manager.
Career Systems Development Corporation

POSTED

about 11 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract calls for the installation of new vinyl composite tile flooring from approved manufacturers—Armstrong, Mohawk, or Shaw—ensuring the new flooring matches the existing aesthetic in appearance, texture, and finish. All materials must comply with domestic sourcing requirements, and only approved adhesives are permitted to ensure durability, safety, and conformance to performance standards. The work is classified as a subcontract under NAICS code 238330, indicating it falls within the specialty trade contracting sector for flooring installation. The solicitation was posted on June 24, 2026, with a response deadline of July 15, 2026, and is administered by the Connecticut Department of Administrative Services Procurement unit through the CTSource Bid Board portal. The place of performance and precise location details are not specified, but the project is tied to state facility requirements under Connecticut’s procurement authority.

General Info

Install vinyl composite tile flooring per Connecticut state specs using approved materials and adhesives by July 15, 2026.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

238330 - Flooring ContractorsView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

This scope was carved out of B027-08.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Edison Middle School Floor Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new VCT flooring from Armstrong, Mohawk, or Shaw to match existing aesthetics, using approved adhesives and in compliance with domestic material requirements.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238220
New
SLED
Westside Classroom Building Boiler Replacement Project - Westside Campus
Solicitation # 2027-WCSU-ITB-002
Western Connecticut State University is soliciting bids for the replacement of a non-functioning boiler and associated equipment at the Westside Classroom Building on its Westside Campus in Danbury, Connecticut. The project requires the contractor to provide all labor and materials for the installation of a new in-kind boiler while ensuring a second existing boiler remains operational throughout the process. The contract is reserved for vendors holding a current SBE/MBE set-aside certificate from the State of Connecticut Department of Administrative Services. Award will be granted to the apparent lowest qualified bidder who meets all technical and qualification requirements. The project is supported by 350,000 dollars in state funding and is subject to strict state contract compliance, including the CT Department of Labor’s Prevailing Wage Rates. Specific spending allocation goals have been established, with an SBE goal of 10.45 percent (36,567 dollars) and an MBE sub-goal of 3.26 percent (11,398 dollars). Key requirements include a 10 percent bid bond at the time of proposal and performance and material bonds upon award. The installation must comply with ASME Boiler and Pressure Vessel Code, NFPA 31, BOCA, and NFPA 54 standards. Deliverables include a complete, code-compliant system with an 18-month warranty on general components and a 5-year warranty on the heat exchanger and burner. Bids must be submitted by October 13, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS