Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 1, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

W--Light Sets

Awarded
10-06-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 532490
New
Federal
W065--NTX Bed Rentals, new (VA-27-00010946)
Solicitation # 36C25727Q0063
The Department of Veterans Affairs, through the Network Contracting Office VA South Texas, is conducting market research to establish a procurement strategy for the lease and maintenance of Rotoprone Therapy System beds for the VA North Texas Health Care System in Dallas, Texas. These specialized beds are critical for treating patients with acute pulmonary complications, such as acute respiratory distress syndrome, by providing automated prone therapy to improve oxygenation and reduce mortality. Additionally, the equipment provides air-fluidized therapy for advanced pressure redistribution to treat complex skin wounds, burns, and pressure ulcers. The scope of work includes the provision of all labor, equipment, supervision, and expertise required for the short-term lease and maintenance of these systems, which must be performed by qualified personnel using approved tools and replacement parts. This sources-sought notice, under NAICS code 532490, aims to determine if the requirement should be a sole source, unrestricted, or a set-aside for small businesses, with a particular interest in Service Disabled Veteran Owned Small Businesses and Veteran Owned Small Businesses. Interested vendors must provide their business details, SAM UID, and estimated market research pricing by November 2, 2026. A critical requirement for all respondents is the provision of documentation proving they are an authorized dealer, distributor, or reseller of the Original Equipment Manufacturer, as the VA will not accept gray market items. This action is currently for informational and planning purposes and does not constitute a formal solicitation for offers.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 15 hours ago

DEADLINE

in 6 days
NAICS: 532490
New
Federal
W038--Wheeled Rental Loader - Winter FY27
Solicitation # 36C24126Q0815
The VA Maine Healthcare System Togus is seeking a qualified vendor under a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) to provide month-to-month rental and support services for two wheeled loaders and snow removal attachments. The equipment, specified as CAT 926 or CAT 930 models weighing between 27,972 and 31,124 lbs, will be used for snow removal at the Togus VAMC campus in Augusta, Maine. Requirements include a 3-yard bucket with a Fusion coupler, 160 to 170 hp Tier 4 Final engines, ROPS/FOPS certified cabs, and liquid-filled tires. The contractor must provide 24/7 service and support, with repairs initiated within 24 hours of notification or the provision of a replacement loader at no additional cost. All preventive maintenance, repairs, and delivery/pickup charges must be included in the firm fixed price quote. The procurement is governed by NAICS code 532490 and follows FAR subpart 12.6 streamlined procedures. Award will be based on a comparative evaluation of technical capability, past performance, and price, with the contract awarded to the responsible vendor who is technically acceptable and offers the lowest evaluated price. Vendors must submit a firm fixed price quote, a technical capability statement, and a signed Limitation of Subcontracting certificate. Strict security and health protocols apply, including mandatory security badging, adherence to VA non-smoking policies, and proof of vaccinations for influenza, COVID-19, and tuberculosis testing for all personnel accessing the station. All quotes must be submitted to the designated contact by November 2, 2026, at 5:00 PM EST.
241-NETWORK Contract Office 01 (36C241)

POSTED

about 15 hours ago

DEADLINE

in 6 days
NAICS: 532490
New
Federal
W065--Karl Storz Brand Name or Equal Equipment Lease
Solicitation # 36C24127Q0039
The VA Boston Healthcare System is soliciting quotes for a 36-month Fair Market Value lease of endoscopy video systems, insufflators, wireless systems, and related components for the VA Maine Healthcare System in Togus. This unrestricted procurement, under NAICS code 532490, seeks Karl Storz brand name or equal equipment to support clinical workflows across general surgery, urology, gynecology, ENT, and arthroscopy. The comprehensive solution must include the equipment, OEM installation, configuration, on-site training for clinical and SPS staff, and full-service maintenance. Key technical requirements include high-resolution 2D, 3D, and NIR/ICG fluorescence imaging, as well as a diverse portfolio of rigid and flexible optics. The contract consists of a base year and two option years, with a requirement that all new equipment be delivered within 45 days of award. Award will be based on a comparative evaluation of technical quality, past performance, price, speed of delivery, and veterans involvement, with specific evaluation credit given to SDVOSB and VOSB entities. Offerors proposing equal products must provide detailed documentation of compliance with all salient characteristics. All quotes must be submitted via email to the contracting officer by November 1, 2026, and must include a formal statement of acceptance regarding the solicitation terms and conditions.
241-NETWORK Contract Office 01 (36C241)

POSTED

about 15 hours ago

DEADLINE

in 5 days
NAICS: 532490
New
Federal
10-Miler Fencing
Solicitation # FA252126QB112
Solicitation FA252126QB112 is a request for quote for a firm-fixed price contract to provide turnkey temporary fencing and barricade services for the Space Force T-Minus 10-Miler event at Cape Canaveral Space Force Station, Florida. The contractor is required to provide 4,500 linear feet of fence panel hard barricades, approximately 4 by 10 feet in size, to restrict access to the finish line and prevent unauthorized vehicle entry. The scope of work includes the delivery, setup, and teardown of the fencing, with specific performance windows requiring setup to be completed by 1600 on the Friday prior to the event and all personnel off-installation by 1700. The contract structure consists of a base year with four optional one-year extensions, with the government evaluating total pricing for all five potential years of performance. This acquisition is a 100 percent small business set-aside under NAICS 532490. The prime contractor must perform at least 50 percent of the payable service portion of the effort and provide direct supervision via a W-2 employee. Award selection is based on best value, considering price, technical performance, delivery timeline, and past performance, though the lowest priced offer may not necessarily be selected. Security is a critical requirement, as all personnel must undergo background checks and mandatory security and safety training to obtain installation access credentials. Payments will be processed via Wide Area WorkFlow with standard Net 30 terms.
FA2521 45 Cons Pk

POSTED

about 15 hours ago

DEADLINE

in 3 days
NAICS: 532490
New
SLED
Emergency Rental, Delivery, Installation, Maintenance, and Removal of Tents, Canopies, and Related Temporary Shelter Equipment
Solicitation # ITB27-004
The City of Pompano Beach is soliciting bids under ITB27-004 for the emergency rental, delivery, installation, maintenance, and removal of tents, canopies, and related temporary shelter equipment. This as-needed contract seeks qualified firms capable of rapid mobilization to support emergency operations, public safety staging, and temporary shelters within Broward County, Florida. Awarded contractors must be available 24/7 and are required to acknowledge activation requests within two hours and complete full installation generally within 48 hours. The scope of work encompasses the provision of all labor and materials, including sidewalls, anchoring systems, lighting, flooring, ramps, AC units, generators, and fire extinguishers, while ensuring all equipment is clean, safe, and operational. The City intends to make multiple awards to the lowest responsive and responsible bidders based on a Total Evaluated Bid Price, potentially ranking contractors as primary, secondary, or additional. Bidders must demonstrate at least three years of relevant experience and provide three references, including at least one for emergency or disaster response. Mandatory insurance requirements include General Liability, Automobile Liability, and Excess Liability, with the City named as an additional insured. Invoicing must be highly detailed to support audits and potential reimbursement from FEMA or other state and federal funding sources. Bids must be submitted electronically via the OpenGov eBid system by December 3, 2026, at 2:00 PM ET.
Procurement & Contracts

POSTED

4 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The USA ACC MICC Fort Irwin is soliciting bids for the lease of new light towers to be deployed across multiple locations, including various FOBs and JSS sites. This small business set-aside requirement specifies that the light towers must be equipped with towing pintles compatible with military HMMWVs, run on JP-8 fuel, and feature at least four 1,000-watt bulbs with a minimum total power output of 4kW and a generator output of at least 7kW. The period of performance varies by location throughout April and May 2010. The selected contractor must provide 24-hour emergency services, with onsite repairs required within 8 hours of a call and general replacements within 24 hours. All equipment must be delivered with full fuel tanks and necessary parts, with backup units provided at no additional cost. Bids are conducted via a competitive reverse auction on FedBid.com, and the award will be based on best value, considering price and availability. Delivery is required within three days of receiving the order.

General Info

Contract Value

$32,493.11

NAICS

532490 - Other Commercial and Industrial Machinery and Equipment Rental and Leasing

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

8 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 25, 2010 to Mar 31, 2010. The notice description changed.

Notice updated

Response deadline changed from Mar 31, 2010 to Mar 30, 2010. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Irwin
ContactsNo contacts available
OfficeFORT IRWIN, CA, 92310-5095, USA
Office AddressFORT IRWIN, CA, 92310-5095, USA
ContactsNo contact information available

Full Description

Show more
AMENDMENT NOTICE: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, in conjunction with FAR 13.5, as applicable, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; bids are being requested and a written solicitation will not be issued. The solicitation number is 10-06-0009 and is issued as an invitation for bids (IFB), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-34. The associated North American Industrial Classification System (NAICS) code for this procurement is 335110 with a small business size standard of 1,000.00 employees. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids. The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2010-03-25 15:00:00.0 Eastern Time or as otherwise displayed at www.FedBid.com. FOB Destination shall be Multiple shipping information. The USA ACC MICC Fort Irwin requires the following items, Meet or Exceed, to the following: LI 001, YERMOPeriod of Performance. 4 APR-15 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 5, EA; LI 002, YERMOPeriod of Performance. 1-5 MAY 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 5, EA; LI 003, FOB KINGPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 20, EA; LI 004, FOB SEATTLEPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 30, EA; LI 005, FOB DENVERPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 25, EA; LI 006, FOB DALLASPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 28, EA; LI 007, FOB MIAMIPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 30, EA; LI 008, JSS ABAR LAYLAPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 3, EA; LI 009, FOB RENOPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 5, EA; LI 010, JSS AL JAFFPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 3, EA; LI 011, JSS AL SHARQPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 012, JSS MMAPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 013, JSS MEDINA WASALPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 014, JSS MEDINA JABALPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 015, AKDARPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 016, FASPPeriod of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW.The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call.The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 10, EA; For this solicitation, USA ACC MICC Fort Irwin intends to conduct an online competitive reverse auction to be facilitated by the third-party reverse auction provider, FedBid, Inc. FedBid has developed an online, anonymous, browser based application to conduct the reverse auction. An Offeror may submit a series of pricing bids, which descend in price during the specified period of time for the aforementioned reverse auction. USA ACC MICC Fort Irwin is taking this action in an effort to improve both vendor access and awareness of requests and the agency's ability to gather multiple, competed, real-time bids. All responsible Offerors that respond to this solicitation MUST submit the pricing portion of their bid using the online exchange located at www.FedBid.com. There is no cost to register, review procurement data or make a bid on www.FedBid.com. Offerors that are not currently registered to use www.FedBid.com should proceed to www.FedBid.com to complete their free registration. Offerors that require special considerations or assistance may contact the FedBid Helpdesk at 877-9FEDBID (+1 (555) 000-0000) or via email at contact@example.gov. Offerors may not artificially manipulate the price of a transaction on www.FedBid.com by any means. It is unacceptable to place bad faith bids, to use decoys in the www.FedBid.com process or to collude with the intent or effect of hampering the competitive www.FedBid.com process. Should offerors require additional clarification, notify the point of contact or FedBid at 877-9FEDBID (+1 (555) 000-0000) or contact@example.gov. Use of FedBid: Buyers and Sellers agree to conduct this transaction through FedBid in compliance with the FedBid Terms of Use. Failure to comply with the below terms and conditions may result in offer being determined as non-responsive. New Equipment ONLY; NO remanufactured or "gray market" items. All items must be covered by the manufacturer's warranty. Bid MUST be good for 30 calendar days after close of Buy. Shipping must be free on board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. Offeror must be registered in the Central Contractor Registration (CCR) database before an award can be made to them. If the offeror is not registered in the CCR, it may do so through the CCR website at http://www.ccr.gov. Delivery must be made within 3 days or less after receipt of order (ARO). The offeror must provide within its offer the number of days - not to exceed 3 - required to make delivery after it receives a purchase order from the buyer. The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the following clauses in paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at http://www.acqnet.gov/far. In accordance with DFARS 252.232-7003, "Electronic Submission of Payment Requests and Receiving Reports", the contractor shall submit their payment request electronically using the WAWF. The WAWF website is located at https://wawf.eb.mil. There is no charge to use WAWF. Contractors must register to use WAWF at this website and ensure an electronic business point of contact (POC) is designated in the Central Contractor Registration (CCR) site at http://www.ccr.gov within ten (10) calendar days after award of this contract. Contractor training is available at the website home page under "about WAWF". Contractors may contact the WAWF Customer Support for assistance toll free at +1 (555) 000-0000; commercial: +1 (555) 000-0000; Fax commercial: +1 (555) 000-0000 or CSCASSIG@CSD,DISA.MIL. The Government reserves the right to vary quantities by +/- 30% due to operational requirements and to make multiple awards to meet said requirements. Sellers must present their representations and certifications, upon request, through the Online Respresentatives and Certifications Application (ORCA) at http://orca.bpn.gov The Government intends to award to the responsible offerors whose offers conforming to the solicitation that will be the most advantageous to the Government based upon Best value. Offerors will be avaluated based on price and availability with all factors being equal. The government incurrs no additional charges for early return of leased equipment. The government maintains the right to award to multiple vendors.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS