This Solicitation opportunity from Department Of Transportation was posted on March 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first326 pages · ifb
HighAI Summary for 69056726B000002 - Mt. Baker Forest Road 11 MP 23.9 Repair: Invitation for Bids (IFB) issued by the Federal Highway Administration for the Mt. Baker Forest Road 11 MP 23.9 Repair project in Whatcom County, WA. This Total Small Business Set-aside solicitation includes a bid schedule, SF 1442, and specific requirements for bid bonds and authority to sign. The project involves road repair over 0.038 miles.
PDF
PDF, High priority: read this firstbid-tabulation
HighAI Summary for 69056726B000002 - Mt. Baker Forest Road 11 MP 23.9 Repair Bid Tabulation: Bid tabulation report for Project No. WA ERFO FS MTBKR605 2022-1(3), solicitation 69056726B000002, regarding repairs to Mt. Baker Forest Road 11 MP 23.9. The document lists bids from Ironwood Commercial Builders, Inc., Highline Construction LLC, and Ecogrind Site Solutions, LLC, alongside the Engineer's Estimate. It includes detailed line-item pricing for mobilization, survey, quality control, and earthwork. Bid opening date was 03/18/2026.
XLSX
XLSX, High priority: read this first4 pages · specifications
HighAI Summary for MAIN 11 Clearing Limits - Design IntlFt: Technical data report created on September 15, 2025, for project 'Design IntlFt'. The document provides precise station offsets, northing, and easting coordinates for the 'MAIN 11' baseline alignment to define clearing limits.
XLSX
XLSX, High priority: read this first14 pages · specifications
HighAI Summary for MAIN 11 Construction Stake Notes: Cross Section Gradebook with Northing/Easting Report for alignment 'MAIN 11', created September 15, 2025. The document provides detailed technical staking data, including offsets, elevations, northings, and eastings for various features (Slope Stakes, EOG, ETW, and Centerline) across multiple stations (80000 to 80100).
XLSX
XLSX, High priority: read this first6 pages · specifications
HighAI Summary for MAIN 11 Cross Section Gradebook Report: Technical gradebook report for alignment 'MAIN 11', created November 21, 2025. The document provides detailed engineering data including stationing (800+00 to 802+00), elevations, northing/easting coordinates, and slope measurements for various surface features (EOG and ETW layers).
XLSX
XLSX, High priority: read this first11 pages · specifications
HighAI Summary for MAIN 11 Cross Section Gradebook Report: Technical gradebook report for alignment MAIN 11, created September 15, 2025. The document provides detailed engineering data including stationing, offsets, elevations, northings, and eastings for subgrade features (e.g., CL_Layer1_Btm, ETW_Layer1_Btm) and slope stakes.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for MAIN 11 Horizontal and Vertical Alignment Review Report: Technical reports dated September 15, 2025, providing horizontal and vertical alignment data for project 'Design IntlFt'. Includes stationing, northing, easting, and elevation coordinates for alignment MAIN 11, specifying a linear element from station 80000.000 to 80200.000.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for MAIN 11 Station Offset Northing Easting Report: Technical report dated September 15, 2025, for project Design IntlFt, alignment MAIN 11. The document provides precise coordinate data, including stationing, offsets, northing, and easting values for baseline alignment points.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Memo 4024 R1 - Mt. Baker Forest Road 11 MP 23.9 Repair: Geotechnical Memorandum (Revision 1) dated May 27, 2025, providing recommendations for the repair of Forest Road 11 MP 23.9 in the Mount Baker-Snoqualmie National Forest. The document details a failure site caused by scouring of the Shannon Creek drainage and proposes a repair strategy involving a root wad and riprap revetment structure combined with a deep patch composite roadway (geogrid and aggregate layers). It includes construction considerations regarding excavation, soil types, and OSHA compliance.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for wa-ef-mtbkr2022-1-3 Construction Stake Notes: Technical construction staking report containing precise coordinate data (Northing, Easting), elevations, and offsets for various road features including slope stakes, edge of grade (EOG), and centerlines (CL). The document provides specific geometric data for construction layout and implementation.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for wa-ef-mtbkr2022-1-3 Cross Section Gradebook: A Cross Section Gradebook with Northing/Easting Report created on November 21, 2025. The document provides detailed technical engineering data, including elevations, offsets, northing, easting, and existing ground slopes for various stations (e.g., 800+20 to 802+00) and features such as CL_Layer1_Top.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for wa-ef-mtbkr2022-1-3 Earthwork Quantities Report: Quantities Report by Named Boundary created on July 17, 2025. The document provides detailed earthwork measurements, including volumes and areas for cut, fill, pavement layers, shoulder layers, and turf establishment across various stations.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for wa-ef-mtbkr2022-1-3_XYZ_subgrade_MAIN+11 Cross Section Gradebook: A Cross Section Gradebook with Northing/Easting Report created on September 15, 2025. The document contains detailed technical survey data, including offsets, elevations, northings, and eastings for various stations (e.g., 800+00.000 to 802+00.000) and features such as subgrade layers and slope stakes for the MAIN 11 alignment.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for WA ERFO FS MTBKR605 2022-1(3) - Main 11 Cross Sections: Technical cross-section drawings for project WA ERFO FS MTBKR605 2022-1(3), specifically for 'MAIN 11' FSR 11 MP 23.9. The document contains detailed engineering data including design grades, original ground elevations, construction limits, and stationing (from 800+00.00 to 802+00.00) produced by the FHWA Office of Federal Lands Highway.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for WA ERFO FS MTBKR605 2022-1(3) - Mt. Baker Forest Road 11 Repair Plans: Technical construction plans for the repair of Mt. Baker Forest Road 11 MP 23.9 in Whatcom County, Washington. The project involves grading, subexcavation, reinforced soil slopes, riprap, and environmental mitigation over 0.04 miles. The document includes a sheet index covering quantities, typical sections, plan-profiles, and soil erosion and sediment control, referencing FP-24 Standard Specifications. Approved January 12, 2026.
PDF
PDF, High priority: read this first3 pages · presolicitation
HighAI Summary for WA ERFO FS MTBKR605 2022-1(3) Mt. Baker Forest Road 11 Repair Project Description: This document describes the emergency repair project for Forest Road 11 at MP 23.9 in Mt. Baker-Snoqualmie National Forest, Whatcom County, Washington. The work includes roadway failure repair with subexcavation, aggregate surfacing, and root-wad/riprap embankment. The project length is 0.038 miles, with an estimated price range between $700,000 and $2,000,000. Tentative solicitation is planned for Winter/Spring 2025 with a fixed completion date in Fall 2026. The document details construction divisions, quantities, and equipment requirements using FP-24 specifications.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for WA ERFO FS MTBKR605 2022-1(3) Site 11-23.9 Hydraulics Report: Amended hydraulic report dated November 20, 2025, for bank stabilization at Mount Baker FS Road 11 MP 23.9. The document provides peak flow estimates, 2D hydraulic modeling results using SRH-2D, and specific engineering recommendations for embankment erosion protection, including the use of Class 5 riprap and the removal of obstructing woody debris to restore roadway integrity following 2021 atmospheric river damage.
XLSX
XLSX, High priority: read this first4 pages · specifications
HighAI Summary for WA ERFO FS MTBKR605 2022-1(3) Survey Control Points: Technical survey control point data for the Mt. Baker-Snoqualmie Erfo Repairs 2022-1(3) project (FR11-MP 23.9). The document specifies coordinate systems (Washington North SPCS NAD83 2011), vertical datums (NAVD88 GEOID18), and provides specific state plane and geographic coordinates for control points. Field work was conducted in July 2023 with final adjustment in August 2023; revised September 20, 2023.
PDF
PDF, Low prioritybid-opening-summary
LowAI Summary for Solicitation 69056726B000002 - Bid Opening Summary: Bid opening summary for Solicitation No. 69056726B000002, Project WA ERFO FS MTBKR605 2022-1(3) (Mt. Baker - Forest Road 11 MP 23.9 Repair), dated 03/18/2026. The document lists three bids received from Ironwood Commercial Builders, Inc., Ecogrind Site Solutions LLC, and Highline Construction, alongside the Engineer's Estimate of $1,264,330.00.
PDF
PDF, Low priority1 page · other
LowAI Summary for USDA Forest Service Bridge Use Application and Permit: A standard application and permit form from the U.S. Department of Agriculture Forest Service used to request and authorize the use of designated bridges. The document collects vehicle specifications, including gross weight, dimensions, and axle configurations, and requires signatures from a Professional Engineer and Forest Service officials for approval.
PDF
PDF, Low priority13 pages · other
LowAI Summary for WA EF MTBKR2022-1-3 Preliminary Plans: This document contains preliminary plans for the Mt. Baker-Snoqualmie ERFO Repairs 2022-1(3) project, including survey control data, plan symbols, abbreviations, and construction notes. It is marked 'Preliminary Not For Construction' and includes coordinate systems, project units, and detailed descriptions of check dam installation and fiber roll placement. The document is dated June 10, 2024, and includes references to field work from July 2023 and final adjustments in August 2023. It serves as a technical reference for project planning and design but is not a solicitation or contract document.
PDF
PDF, Low priority1 page · q-and-a
LowAI Summary for WA ERFO FS MTBKR605 2022-1(3) - General Technical Q&A: Technical question and answer document dated March 6, 2026, for the Mt. Baker Forest Road 11 MP 23.9 Repair project. It clarifies that government-furnished stockpile areas are for rootwad and log deflector retrieval only and cannot be used for disposal of unsuitable materials or equipment staging.
PDF
PDF, Low priority1 page · q-and-a
LowAI Summary for WA ERFO FS MTBKR605 2022-1(3) - General Technical Q&A: A technical question and answer document dated March 16, 2026, for the Mt. Baker Forest Road 11 MP 23.9 Repair project. It clarifies that government-furnished stockpile areas are for material retrieval only and cannot be used for disposal or staging, and confirms that no amendments have been issued for the solicitation.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for WA ERFO FS MTBKR605 2022-1(3) Mt. Baker Forest Road 11 MP 23.9 Repair Preliminary Notice: This special notice dated October 28, 2025, from the Western Federal Lands Highway Division provides preliminary plans and information for the Mt. Baker Forest Road 11 MP 23.9 Repair project (Solicitation No. 69056726B000002) in Whatcom County, Washington. It informs prospective bidders about project location, type of work, and restrictions on material sources. The notice advises that solicitation documents will be available in winter 2025/2026 and encourages monitoring the SAM.gov site for release updates.
LowAI Summary for WFLHD Construction Contract Administration FY 23 V2: This document outlines the Federal Highway Administration’s (FHWA) procedures and historical performance data regarding the definitization of equitable adjustments for change orders under construction contracts, as required by FAR 36.211. It includes a data table showing the time required to definitize change order proposals for FY 2021, 2022, and 2023.