Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Active
69056726R000011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is a presolicitation notice for a pavement preservation and minor guardrail installation project spanning multiple locations in Washington State, including areas within and adjacent to Olympic National Park and Stehekin in North Cascades National Park. The base scope covers 60.59 miles of roadway and associated parking areas, with three optional work schedules—Option X (1.92 miles), Option Y (12.07 miles), and Option Z (6.92 miles)—that may be exercised, bringing the total potential scope to approximately 81.58 miles. Work includes crack sealing, fog sealing, chip sealing, microsurfacing, asphalt patching, shoulder pavement extension, and installation or removal of MGS-Type 2, Class A steel guardrail systems, all to be performed in accordance with FP-24 standards and WSDOT specifications. The project is structured as a Firm-Fixed-Price task order under a Western Region Pavement Preservation Multiple Award Task Order Contract (MATOC) with an Indefinite-Delivery/Indefinite-Quantity (IDIQ) vehicle, with an estimated value between $10 million and $20 million. Tentative completion is scheduled for summer 2028, with solicitation expected to be issued in fall or winter 2026 through SAM.gov, where all plans, specifications, and updates will be posted. Interested parties must register and maintain an active SAM.gov account with appropriate roles to access vendor lists and receive notifications. Technical performance is governed by compliance with MUTCD for traffic control markings, and all work must meet federal construction and quality assurance standards. No formal contract clauses, evaluation factors, or solicitation-specific submission formats are detailed in the presolicitation, but adherence to FP-24 and project-specific design plans is required. Payment, invoicing, and contracting officer details are not yet defined, and offerors are directed to monitor SAM.gov closely for future release of the Request for Proposal.

General Info

Pavement preservation and guardrail work on 60.59–81.58 miles of Washington roads, FP-24 compliance, $10M–$20M IDIQ task order, SAM.gov solicitation fall/winter 2026.

Agency

Department Of Transportation → 690567 Western Federal Lands DivisionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Port Angeles, WA, USA

Set-Aside

NONE

Documents

(3)

WA NP OLYM PMS Pavement Preservation Project Description

PDFpresolicitation

WA OLYM NOCA Hoh Preliminary Plans for Pavement Preservation Project

PDFspecifications

Preliminary Plans Letter for WA NP OLYM PMS Pavement Preservation MATOC

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Organization / Agency
Department Of Transportation → 690567 Western Federal Lands Division
View Agency Profile
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

PROJECT: WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing


LOCATION:  This project is in Washington State in/adjacent to Olympic National Park and Stehekin in North Cascades National Park.


WORK: This project consists of pavement preservation and minor guardrail installation. See “Project Description” posted under Attachments for additional details.


LENGTH: BASE SCHEDULE: 60.59 miles and parking areas


OPTION X: 1.92 miles and parking areas


OPTION Y: 12.07 miles and parking areas


OPTION Z: 6.92 miles and parking areas


TENTATIVE COMPLETION DATE:  Summer 2028


CONTRACT TYPE: Firm-Fixed-Price Task Order


ESTIMATED PRICE RANGE: Between $10,000,000 and $ 20,000,000


INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.


NOTICE OF SUBCONTRACTING OPPORTUNITY


This project will be solicited to the Western Region Pavement Preservation MATOC. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region-pavement-pres


This project is anticipated to be solicited Fall/Winter 2026.          


PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.


To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.  When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 541990
New
Federal
Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge Replacement
Solicitation # 69056726Q000038
Solicitation 69056726Q000038 is a request for quotations for post-construction environmental compliance monitoring services to support the MT FLAP BOR 2980(1) Sun River Bridge Replacement project in Augusta, Montana. This acquisition is a total small business set-aside issued by the Federal Highway Administration's Western Federal Lands Division. The scope of work involves executing eight specific tasks to ensure environmental compliance, including the removal of temporary controls once final stabilization of 70 percent revegetation is achieved, all in accordance with the project's Stormwater Pollution Prevention Plan. The anticipated period of performance runs from the date of award through November 30, 2027, with monthly inspections expected from November 2026 through the end of the term. The contract will be awarded using the Lowest Priced Technically Acceptable process, evaluating offers based on price, technical capability, and relevant past performance. Technical evaluation focuses on compliance with solicitation requirements and the qualifications of key personnel. Offerors must submit a price schedule, key personnel resumes, and work experience documentation. Administrative requirements include electronic invoicing via the Delphi iSupplier portal and adherence to the Service Contract Act wage determinations. Final deliverables are subject to a structured review process by the FHWA, with specific timelines for draft comments and final acceptance by the Technical Point of Contact.
All Other Professional, Scientific, and Technical Services

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS