Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wastewater Treatment Plant Cost Specialist

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Lethbridge is seeking a Wastewater Treatment Plant Cost Specialist to provide independent cost estimating and validation services for prime contractors during plant expansions. The selected subcontractor will be responsible for preparing Class D, C, B, and A estimates utilizing AACE 5-tier systems, developing parametric cost models and unit rate libraries, and conducting benchmarking against other municipal wastewater projects. Key deliverables include class-specific cost estimates and comprehensive Basis of Estimate documentation. Qualified candidates must demonstrate proficiency in AACE International standards and possess experience with CCDC 5B and Construction Manager at Risk (CMAR) frameworks. This subcontract opportunity was posted on September 24, 2026, with a response deadline of October 22, 2026. The project falls under NAICS code 541330, focusing on engineering services to support the city's infrastructure expansion.

General Info

Lethbridge seeks a cost specialist for wastewater plant expansion estimating and validation services.

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of COL-26-165.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cost Estimating Consultant (WWTP Expansion)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Lethbridge
ContactsNo contacts available
OfficeN/A
Organization / AgencyCity of Lethbridge
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs independent cost estimating and validation for prime contractors on City of Lethbridge wastewater treatment plant expansions. Prepares Class D/C/B/A estimates using AACE 5-tier systems, develops parametric cost models and unit rate libraries, and performs benchmarking against municipal wastewater projects. Requires AACE International standards and CCDC 5B/CMAR experience. Delivers class-specific cost estimates and Basis of Estimate documentation.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer mainline and installing service laterals to facilitate the conversion of properties from private septic systems to public sewer. The scope includes decommissioning existing pump stations, specifically in the Romaine Village area, and may involve ancillary transportation improvements such as ADA curb ramp design and roadway reconstruction. The project is funded by the Clean Water State Revolving Fund through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The City of Bend will select a consultant based on the highest scoring proposal, evaluating project understanding, team qualifications, and firm experience. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, or local DBE certifications as part of a good faith effort to include diverse businesses. The response deadline for this solicitation is September 29, 2026.
Parametrix

POSTED

about 5 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601). The primary objective is to develop shovel-ready construction documents, including 60 percent, 90 percent, and 100 percent plans, specifications, and estimates, to mitigate chronic flooding and improve water quality in the College Park East neighborhood. A critical component of the scope involves a comparative evaluation of two pump station siting alternatives, Ironwood and Aster Park, alongside managing environmental reviews, permitting, and utility coordination. This procurement is funded in part by a U.S. EPA Community Project Funding award, requiring strict adherence to federal procurement standards under 2 CFR Part 200, EPA regulations, and Disadvantaged Business Enterprise (DBE) requirements. Selection is qualifications-based, following the Brooks Act and California Government Code Section 4526, with evaluation weighted toward scope understanding (40 percent), team qualifications (25 percent), and project approach (25 percent). Proposals were due by September 22, 2026, with an estimated contract award occurring six weeks later. The resulting agreement is a professional services contract on a time-and-materials basis with a not-to-exceed value of 1.3 million dollars. The selected consultant must provide monthly detailed invoicing, maintain comprehensive general liability insurance, and comply with California prevailing wage laws and federal non-discrimination mandates. The City Manager serves as the primary representative for the agreement, and the City retains the right to audit all financial and performance records for at least three years following the contract's conclusion.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing utility locating and potholing, geotechnical and geophysical investigations, LIDAR, and a wide array of engineering support including civil, structural, mechanical, electrical, and instrumentation and controls. Additional requirements include BIM/3D modeling, commissioning and startup planning, land surveying, CPM scheduling, and comprehensive environmental services such as hazardous materials surveys, permitting support, and compliance monitoring. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system. Responsive bidders are required to hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse the bond premiums. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and OBE firms. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to collective bargaining agreements with several trade unions. The bid deadline is September 11, 2026, and plans are available for review at Kiewit's Costa Mesa office.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 4 days
View Details
NAICS: 541330
New
Federal
SR Power Supplies Rack Detailed Design for ALS-U
Solicitation # AA-2027-01
Request for Proposal AA-2027-01, issued by the University of California on behalf of the Lawrence Berkeley National Laboratory, seeks a subcontractor for the detailed design of 76 power supply rack assemblies for the Advanced Light Source Upgrade Storage Ring. The scope of work involves creating 3D models and production drawings for 16 distinct layouts, categorized into Standard Sector, Hard Bend Sector, and Transfer Line racks. All designs must utilize Autodesk Inventor Professional 2025 and adhere to industrial 19-inch, 48U rack standards, with the Accumulator Ring rack packages serving as the primary reference. The project requires compliance with strict electrical safety standards, including UL 61010 or UL 60950-1, NFPA 70, and LBNL specific grounding and bonding requirements. The contract is structured as a firm fixed-price agreement for the design package, with an additional provision for up to 200 hours of on-call support and an option for assembly services. The period of performance for the design deliverables concludes on January 31, 2027, while the overall subcontract period extends through January 31, 2029. Proposals are evaluated based on best overall value, considering technical approach, schedule, personnel, past performance, and quality assurance. Submissions must include a cover letter, a business volume with pricing, a mandatory Representations and Certifications form, and a Supplier Quality Evaluation Survey. Design activities are primarily performed at the subcontractor's facility within the United States, with occasional on-site visits to Berkeley, California.
Berkeley National Labor - DOE Contractor

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

More opportunities from City of Lethbridge

Same awarding agency

NAICS: 541330
New
International
Cost Estimating Consultant (WWTP Expansion)
Solicitation # COL-26-165
The City of Lethbridge is issuing solicitation COL-26-165 to establish a pre-qualified roster of three high-ranking Cost Estimating Consultants. The primary objective is to provide independent, market-informed cost advice for the Wastewater Treatment Plant (WWTP) Train 2 20 ML/D Expansion, though the selected consultants may also support other municipal infrastructure portfolios including water, stormwater, transportation, electric, and waste management. This two-stage procurement process evaluates respondents based on their corporate overview, project team, and relevant experience, with a specific emphasis on Wastewater Treatment Plant expansions delivered under the CMAR approach and familiarity with CCDC 5B construction management contracts. The top three ranked respondents will enter into a Consulting Services Agreement, after which they will compete for discrete work assignments via individual Statements of Work. Key deliverables include cost estimating, validation, benchmarking, capital planning, and open-book cost reviews for GMP development. Mandatory requirements include professional errors and omissions insurance of 1 million dollars and commercial general liability insurance of 2 million dollars, with the City named as an additional insured. Consultants must maintain a confidential relationship with the City and disclose any potential conflicts of interest regarding designers or contractors. The submission deadline is October 22, 2026, with an anticipated agreement execution date of December 1, 2026. Payments are processed within 30 days of invoice receipt, with unpaid amounts accruing interest at 1 percent per month.
Engineering Services

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
International
Parking Lot Maintenance and Repairs
Solicitation # COL-26-099
The City of Lethbridge is seeking non-binding offers under solicitation COL-26-099 for a five-year service contract focused on parking lot maintenance, replacements, and new installations. The scope of work includes asphalt services such as crack sealing, pothole repairs, patching, and seal coating, as well as concrete repairs and line painting across multiple city sites. This is a unit price contract based on the CCDC 4-2023 standard, modified by supplementary conditions. Proponents are evaluated on their experience and qualifications (50 points) and their project approach and understanding (20 points), with a specific requirement to provide details on three similar past projects and a comprehensive work plan covering seasonal maintenance and quality control. Key operational requirements include strict adherence to the City of Lethbridge Temporary Traffic Control Manual and Tree Protection Guidelines, which mandate maintaining a 5-meter distance from tree trunks. The contractor must provide a performance bond and a labour and material payment bond, each equal to 50% of the contract price. Insurance requirements include Commercial General Liability and Automobile Liability of $2,000,000 each, with the City named as an additional insured. Additionally, the contract mandates compliance with the Alberta Worker's Compensation Act and the Prompt Payment and Construction Lien Act. A two-year warranty period is required for all work, and the contractor must provide statutory declarations for payment of wages and subcontractors before the release of holdbacks.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS