Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Well 25 Rehabilitation and Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Eastern Municipal Water District (EMWD) is undertaking the rehabilitation and repair of Well 25 in San Jacinto, California, which has been offline since 2022 due to the production of sand and filter/gravel pack material indicating possible casing failure. The project aims to restore the well’s historical production capacity of 1,400 gallons per minute through a series of targeted actions including removal of the existing pump, mechanical cleaning of the well casing, a structural integrity inspection, and targeted zone sampling to determine whether the well screen or another factor is responsible for the intrusion of sediment. The work is part of routine maintenance under a California Code of Regulations Title 14 Categorical Exemption, and its primary beneficiary is EMWD’s ratepayers through the restoration of reliable water supply. The place of performance is clearly identified as East Esplanade Avenue in San Jacinto, and the district’s administrative office in Perris, California, serves as the central point of contact for project oversight. While the project is publicly posted as a forecast with a posted date of September 9, 2025, no contract value, pricing details, payment terms, accounting codes, invoicing protocols, or formal contract type have been disclosed. There are no specified delivery schedules, FOB terms, packaging requirements, inspection standards, or contractual clauses under FAR, and no designated contracting officer, technical representative, or contracting officer’s representative has been formally named. No solicitation number, submission instructions, proposal formats, deadlines, or evaluation criteria have been provided in the available documentation, indicating the information released is preliminary. Contact for inquiries is Martha Vilchis, Water Resources Specialist Assistant I, with additional support from Joe Broadhead and Anthony Budicin within EMWD’s organization.

General Info

EMWD to rehabilitate Well 25 in San Jacinto to restore 1,400 GPM production after 2022 shutdown.

Agency

California → Eastern Municipal Water District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

East Esplanade Avenue, adjacent to the southwest corner of Rancho Park, San Jacinto, CA, 92583

Set-Aside

NONE

Documents

(1)

NOE - Well 25 Rehabilitation and Repair

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Eastern Municipal Water District
Office AddressN/A
Contacts
Martha VilchisWater Resources Specialist Assistant I

Full Description

Show more
Eastern Municipal Water District’s (EMWD) Well 25 has been offline since 2022 due to the production of sand and filter/gravel pack material, which signaled a potential failure of the well casing. To return Well 25 to its historical production of 1,400 gallons per minute, targeted zone sampling is required to identify if the water well’s screen is the source of sand and gravel or if there is another cause. This would aid in identification of the proper repair method for the well. This testing is part of the Well 25 rehabilitation, which included the removal of the well pump, mechanical cleaning of the casing, and integrity inspection. Beneficiaries of the project are EMWD ratepayers.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details