West Glendale ADA Curb Ramp Installation and Sidewalk Repair Program Phase 1, Specification No. 4006 and Plan No. 1-3134

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The West Glendale ADA Curb Ramp Installation and Sidewalk Repair Program Phase 1, identified by Specification No. 4006 and Plan No. 1-3134, is a public works project managed by the City of Glendale, California. The project focuses on infrastructure improvements along multiple right-of-way segments in the western area of the city, primarily bounded by Elm Avenue, San Fernando Road, Glenoaks Boulevard, Concord Street, and West Milford Street. The scope extends to include specific one-block segments on Linden, Allen, Thompson, Western, Hale, and Standard Avenues, as well as a four-block extension north of Glenoaks Boulevard on Winchester Avenue. The primary objective of the work is to enhance accessibility and repair damaged infrastructure. This includes the selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons, as well as the repair of asphalt and Portland cement concrete pavements. A critical component of the project is the installation of new ADA compliant curb ramps and the modification of existing ramps to meet current ADA standards. The project is classified as a Class 1 Existing Facilities project and is therefore exempt from California Environmental Quality Act review. Administrative oversight is provided by the City of Glendale Public Works Department, with Dennis Joe serving as the Principal Planner and primary point of contact.

General Info

Glendale to repair curbs, gutters, sidewalks, and install ADA-compliant ramps in western area per Spec 4006 and Plan 1-3134.

Agency

California → City of Glendale

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Glendale, CA

Set-Aside

NONE

Documents

(1)

West Glendale ADA Curb Ramp Installation and Sidewalk Repair Program Phase 1 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendale
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendale
Office AddressN/A
Contacts
Dennis JoePrincipal Planner

Full Description

Show more
The project consists of improvements along multiple right-of-way segments within the western area of the City of Glendale, bounded by Elm Avenue (west), San Fernando Road (southwest), Glenoaks Boulevard (north), Concord Street (east), and West Milford Street (south). Several right-of-way segments extend beyond these boundaries by approximately one block on Linden Avenue, Allen Avenue, Thompson Avenue, Western Avenue, Hale Street, and Standard Avenue, and by four blocks north of Glenoaks Boulevard on Winchester Avenue. The scope of work for improvements to these identified right-of-way corridors includes: 1) selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons; 2) selective removal, repair, and reconstruction of damaged asphalt and Portland cement concrete pavements; 3) installation of new ADA compliant curb ramps where none existed, and 4) modification and reconstruction of existing ramps to meet current ADA standards.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS