Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

West Point Drought Water Supply

Forecast
2025080901State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The West Point Drought Water Supply project, managed by the Calaveras County Water District under solicitation SCH No. 2025080901, involves modifications to an existing 35-foot high, 500-foot-long dam and reservoir in Calaveras County, California. The primary objective is to enhance the West Point potable water system by increasing reservoir storage capacity from 50 acre-feet to approximately 150 acre-feet. This will be achieved by raising the dam embankment from elevation 2,991 to 3,003 using materials excavated from the reservoir basin, establishing a new high-water level at elevation 2,999. Technical specifications include upstream and downstream slopes of 3 horizontal to 1 vertical and the replacement of the existing concrete spillway with a reinforced concrete open channel spillway measuring 3 feet deep by 10 feet wide. The project is subject to the California Environmental Quality Act (CEQA), with a Mitigated Negative Declaration adopted to address potential environmental impacts. Regulatory coordination involves multiple agencies, including the California Department of Fish and Wildlife regarding fish barriers in Bear Creek, the Central Valley Regional Water Quality Control Board for water quality and permitting, and Caltrans for potential encroachment permits within their right of way. Additional oversight is provided by the State Water Resources Control Board's Division of Financial Assistance to ensure compliance with drinking water financing requirements. Comprehensive environmental assessments have been completed, covering air quality, biological resources, wetlands, cultural resources, and noise.

General Info

Calaveras County Water District project increasing West Point reservoir storage to 150 acre-feet.

Place of Performance

Winton Road/ Hidden Valley Road, CA, 95249

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County Water District
Contacts1 person available
OfficeN/A

Interested Companies (1)

BaseCamp EnvironmentalLodi, CA

Full Description

Show more
The West Point Drought Water Supply project will involve modifications to the existing 35-foot high, 500-foot-long dam and reservoir to increase water storage capacity and enhance performance of the West Point potable water system. The proposed improvements include raising and enlarging the earthen dam towards the upstream side of the existing dam using materials excavated from within the reservoir basin to increase capacity from 50 acre-feet (AF) to approximately 150 AF. The proposed new high-water level within the reservoir will be at elevation 2,999.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS