Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

2025 BHPP Sump Repair

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2025 BHPP Sump Repair project, managed by the California Department of Water Resources San Joaquin Field Division, involves essential maintenance to support the California Aqueduct and water delivery within the State Water Project. The primary objective is to restore three sumps to their original condition by removing sediment and debris to enable water storage. This scope of work includes the use of a grader, loader, bulldozer, backhoe, and dump truck for sediment removal, while a water truck will be utilized for dust control and compaction. Additionally, the project requires the replacement of all damaged culverts, with excavated dirt being placed and compacted on the sump roads. All project activities will be performed within the DWR right-of-way in Avenal, California, with all staging taking place at the Badger Hill Pumping Plant. The project is classified under NAICS code 237990 and has been certified as exempt from environmental review under specified Public Resources Code sections. Elizabeth Maldonado, Senior Environmental Scientist, serves as the primary point of contact for this forecast.

General Info

Sediment removal from three sumps at Badger Hill Pumping Plant for functional restoration using heavy equipment under CEQA exemptions.

Agency

California Water Resources, Department of

Place of Performance

Avenal, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A

Full Description

Show more
San Joaquin Field Division plans to remove sediment and debris from three sumps to allow storage of water. To complete this work, a grader, loader, bulldozer, backhoe, and dump truck would be used to remove and move sediment. A water truck will be used to control dust and aid in compaction. Dirt excavated from inside the sump would be placed on the sump roads and compacted. All damaged culverts would be replaced. All staging will take place at the Badger Hill Pumping Plant. All work will take place within the DWR right-of-way. This work is necessary to maintain the sumps and to bring them back to their original condition.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS