Wet Weather Basin Improvements

Open
100022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Wet Weather Basin Improvements project, solicitation number 100022, is a construction effort managed by the Central Contra Costa Sanitary District in Martinez, California. The primary objective is to achieve 500-year flood protection by raising berms around Wet Weather Basins B, C, and D. The scope of work includes significant earthwork, levee raising, grading, backfill, and the demolition of existing utilities and structures. To enhance treatment plant resiliency, the project incorporates the installation of new mechanical screens, gates, and electrical systems for security, lighting, and sump pump controls, alongside the implementation of Process Control and Instrumentation Systems. The contract will be awarded to the lowest bidder and requires strict adherence to safety protocols, including confined space entry and hot work. Contractors must comply with California Labor Code prevailing wage requirements and ADA standards. Key deliverables include technical submittals, operation and maintenance manuals, and a baseline schedule due within 30 days of the Notice to Proceed. Project administration and payment will be managed through Procore. The project also includes specific requirements for piping identification, the use of stainless steel or plastic tags for valves, and compliance with NSF Standard 61 for materials in contact with process water. There is no set-aside status specified for this solicitation.

General Info

Construction project to improve flood protection and resiliency for Wet Weather Basins.

Documents

5
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · ifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF

Read all 5 documents

Due in 27 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 27 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more

Full Description

Show more
Bid #100022: The work involves raising berms around Wet Weather Basins B, C, and D to achieve 500-year flood protection. This includes various electrical, mechanical, and civil improvements aimed at increasing treatment plant resiliency and enhancing the function and safety of the wet weather basins infrastructure. Specific improvements encompass new mechanical screens, structures, gates, and electrical systems for sump pumps, lighting, controls, and security. The project also involves significant earthwork, including levee raising, grading, and backfill, along with demolition of existing structures and utilities. Construction activities will adhere to strict safety protocols, including confined space entry, hot work, and traffic control. The project also includes vegetative restoration of disturbed areas.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # 27032
The County of Greenville is seeking proposals from qualified general contractors for site improvements at Northside Park, located at 101 West Darby Road, Taylors, SC. The project is divided into three distinct phases: Phase 1 (East Side), Phase 2 (West Side), and an Alternate phase for the Waterpark Parking Lot. The scope of work includes demolition of existing concrete, asphalt, fencing, and benches; site work and grading; installation of heavy-duty concrete paving, concrete curb and gutter, and a 27'x40' pavilion shade structure; and landscaping including the installation of 26,627 square feet of sod. The County reserves the right to award these phases individually or in any combination. The anticipated notice to proceed is December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals were due by November 25, 2026. Contractors must comply with ADA Title II guidelines, the Occupational Safety and Health Act of 1970, and the Prison Rape Elimination Act of 2003. Key contractual requirements include the submission of a bid bond, a performance and payment bond for the total contract price, and the maintenance of all required insurance for the life of the contract. Liquidated damages of $250.00 per calendar day will be assessed if work is not completed within 90 calendar days from the notice to proceed. There is no set-aside status for this solicitation.
PARKS ADMINISTRATION

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
Barefoot Beach Restoration - Grant Funded
Solicitation # 25-8576
The Barefoot Beach Restoration project is a grant-funded, turn-key construction contract managed by the Collier County Facilities and Redevelopment agency in Florida. With an anticipated budget of $1,087,934.87, the project focuses on repairing and restoring park facilities and site improvements damaged by Hurricane Ian. The scope of work includes civil and site improvements such as pavement and curb restoration, ADA upgrades, and the installation of mobi mats and outdoor shower pads. Additionally, the contractor is responsible for restoring the concessions structure and chickee hut, replacing fencing and gates across multiple parking lots and the beach entrance, and installing new monument signage and lighting. A bid alternate is also included for the cleaning and maintenance of the butterfly garden and pond. Bids are due electronically by January 12, 2027, at 3:00 P.M. local time. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount and a 5 percent bid bond. The project timeline requires work to commence within five calendar days of the Notice to Proceed, with a general completion timeline of 150 calendar days. All work must adhere to the latest Florida Building Code, Florida Accessibility Code, and ADA requirements. The contractor is required to use the Procore project management platform for all RFIs and submittals and must comply with FEMA Public Assistance funding provisions, including non-discrimination and federal labor laws. There is no specific set-aside status for this solicitation.
Facilities & Redevelopment

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS