Wildcat Creek Bridge Geotechnical Site Investigation

Forecast
10-1N350State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 10 in Stockton is conducting a geotechnical site investigation for the replacement of the Wildcat Creek Bridge (Br. No. 38-0009) in Stanislaus County, California. The project aims to replace an existing double 14ft diameter steel pipe culvert with a single-span bridge to facilitate fish passage. The scope of work involves drilling geotechnical borings at two locations, specifically at the east and west abutment sites, to a maximum depth of 100 feet. These borings will be used to characterize subsurface conditions, collect rock samples, and provide design recommendations for the new bridge foundation. Deliverables include the Log of test Borings, and all boreholes must be backfilled with neat cement according to California Well Standards Bulletins 74-81 and 74-90, as well as Stanislaus County Department of Environmental Health standards. The project is categorized as exempt under CEQA Class 6 and is a NEPA Categorical Exclusion, with no significant environmental impacts anticipated. Compliance requirements include adherence to Caltrans Standard Specifications for air pollution and dust control and Government Code Section 11017. Additionally, if drilling occurs between February 1 and September 30, a biologist must perform a pre-activity survey for ground-nesting birds. The investigation is located at STA-120-PM 15.04 near Orange Blossom and Knights Ferry.

General Info

Geotechnical site investigation for Wildcat Creek Bridge replacement in Stanislaus County, California.

Agency

California → Caltrans, District 10 - Stockton

Place of Performance

CA, 95361

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A

Full Description

Show more
The project This project is a road improvement effort that proposes to remove the existing double 14ft diameter steel pipe culvert and replace it with a single-span bridge at Wildcat Creek to facilitate fish passage. The document is for drilling geotechnical borings at the proposed bridge site. This memo is for drilling geotechnical borings at the proposed bridge site. The Office of Geotechnical Design-North (OGDN) is proposing carrying out a geotechnical field investigation for the proposed replacement of the Wildcat Creek Bridge (Br. No. 38-0009). The subsurface investigation will include drilling geotechnical borings at the proposed bridge site in 2 locations- at the east and west abutment locations respectively. Factors such as utilities and other conflicts like, traffic, and other safety considerations may cause a borehole to be shifted by as much as 20 feet from the original planned location. The actual location will be placed as close to the existing bridge abutment location as feasible. The boreholes are proposed to be drilled to a maximum depth of 100 feet with the possibility of adjusting the depth based on field conditions, foundation materials encountered, and the foundation requirements of the new bridge. All borings will be backfilled to the ground surface with neat cement in accordance with the Stanislaus County Department of Environmental Health and California Well Standards Bulletin 74- 81 and 74-90. The purpose of the field work is to characterize the subsurface conditions for the proposed bridge replacement. ODGN proposes to drill and collect subsurface/rock samples for analyses and design recommendations of the foundation for the proposed replacement bridge, including Log of test Borings. Further details about the geotechnical work can be found in the Site Investigation Plan

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS