Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Wright Wetland Preserve, Wetland Restoration Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

State Hwy 175, CA, 95453

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
Contacts1 person available
OfficeN/A

Full Description

Show more
The Wright Wetland Reserve (Wright) was purchased by the Lake County Land Trust (LCLT) in 2020 as part of the Big Valley Wetlands Project (BVWP). Funding for Wright came from LCLT donor raised funds and a grant from the California Wildlife Conservation Board. The BVWP was developed between 2010 and 2014 to protect and restore approximately 710 acres of wetlands on the Big Valley shoreline between Clear Lake State Park and Lakeport and to protect and restore 43.5 miles of creeks in Big Valley that are, or potentially are, utilized by the Clear Lake hitch, a California threatened species, during spawning. Wright contains approximately 120 acres of functional wetland and 32 acres of hydraulically isolated historic wetland. This Plan is to reconnect the isolated wetland to Clear Lake and restore some of the natural hydrology to the property. A levee was constructed on the property between 1957 and 1974 (we believe in the mid to late 1960’s) for agricultural purposes which separated approximately 32 acres of wetland area from Clear Lake. Grazing and limited vegetable production occurred behind the berm. Approximately one half of the tules have grown back, however, they are not accessible to fish within Clear Lake nor do they provide water quality benefits (nutrient uptake) to Clear Lake. Approximately 120 acres of wetlands at the north end of the property are still connected to Clear Lake. Circa 1952, Manning Creek, which currently flows along the southwest property corner, was channelized onto the property to the west of Wright. Historical aerial photographs and topographic maps indicate that a portion of the natural delta of Manning Creek was on Wright. A remnant channel and creek mouth exist at the northern end of Wright. Other channels have been removed by leveling the Wright property for flood irrigation purposes. An old roadway across the southern edge of Wright has been elevated and currently blocks overland flow from passing through Wright. The old roadway provides access to the pole barn and corrals along the southern property line. To the southwest of the pole barn area, the road no longer serves a purpose. No culverts are evident in the roadway and flow is directed to the slough along the eastern edge of the property. Due to the low channel slope (<0.2% average), water backs up and overflows the roadway to the east of the pole barn and has created significant ruts which limits the usability of the roadway. The proposed project is to restore hydraulic connectivity of the isolated wetland area to Clear Lake and to restore some of the natural overland flow from the south through the property. Approximately 72 percent of the wetlands near Clear Lake have been lost due to development. Wetland loss has adversely impacted fish and wildlife and the water quality in Clear Lake. While this project involves only 0.36% of 9,000 acres of the historic wetlands, any wetland increases are beneficial to the Clear Lake ecosystem. 2 The project will benefit: • Native and introduced fish in Clear Lake: Wetlands provide shelter, spawning and rearing habitat for nearly all the fish in Clear Lake. • Birds: Both migratory and resident birds utilize wetland areas for foraging and nesting purposes. Islands will also be created by the levee breaches which provided birds shelter from some terrestrial predators. • Water quality: Wetlands are known to reduced phosphorus and nitrogen in water bodies. Project components include: • Breach levee to reconnect historic wetlands to Clear Lake: Three breaches are proposed in the eastern section of levee adjacent to the dredged channel. The ground elevationi at the proposed breach locations vary but are near 4 foot Rumsey or approximately half full on Clear Lake. This promotes hydraulic connectivity of the wetlands to Clear Lake for much of an average water yearii and connects the lowest portion of the isolated wetlands to Clear Lake. Another breach location was considered along the northern section of the levee, however, ground elevations were approximately 6 foot Rumsey and would only have water in it for short periods in all but the wetter years. Each breach is proposed to be 40 feet wide at the base with side slopes of 3:1. Each breach is estimated to remove 75 to 100 cubic yards (CY) of material from the levee. Material removed from the breaches is proposed to be disposed of by either: o Placement adjacent to the breach on the land side to increase the new “levee islands” to increase island size and potential nesting habitat. This would actually reduce the acreage of restored wetlands, although it would be balanced by the increased wetland area created by the breaches, or o Placement of the material in an upland location, such as near the pole barn. • Consider pilot plantings of tules in the reconnected historic wetlands: A large patch of tules grow in the isolated wetlands, although it could be larger. Grazing cattle have probably limited the growth of wetland plants. Isolated tule plants away from the main patch show the potential as can be expected from the ground elevation. Consideration should be given to placing plantings of tules and other native wetland vegetation in the restored wetland. • Relocate or remove fence lines within the Public Trust Easement (lakeward of 7.79 ft Rumsey, or 1329.0 ft NAVD88: Portions of three fence lines are within the Public Trust Easement and wetland restoration area. All fences do not function to keep cattle out of the wetland area as they do not connect to other fences and/or have sections that have failed and barb wire is lying on the ground. Fencing within the Public Trust Easement should be removed. If LCLT continues grazing on Wright, new fences need to be installed upland of the Public Trust Easement to exclude livestock from the wetland areas. • Breach the old roadbed southwest of the pole barn to facilitate movement of surface water northward through the property: A ten foot bottom width breach is proposed in the roadbed immediately southwest of the pole barn area. This would intercept overland flow from the area to the south and southwest and route it north west of the pole barn area. It would also intercept overflows from Manning Creek and allow them to proceed northward. This would reduce the amount of water currently flowing east approximately 1,000 feet to the slough, where the average channel slope is approximately 0.2% and reduce overflows of the access road. Excavated material 3 (estimated at less than 20 CY) would be disposed of in the immediate area, including building a berm to prevent vehicles from accidentally entering the breach. Culvert(s) may also be necessary in the access road where the overflows currently occur. • Remove two abandoned agricultural water pumps and (at least some of) the associated infrastructure: Two pumps exist in the southeast corner of the property. o One is located on a platform in the slough and was a supply pump for flood irrigating the property. The buried irrigation pipe extends westward early to the property line, including at least one standpipe. The pump, platform and the irrigation line should be removed. o The second pump is located on the landside of the levee on a collapsed wooden platform. It was used to dewater the area behind the levee in the spring. The pump, platform and discharge pipe should be removed. • Sediment and erosion control: Because of the need for excavation adjacent to Clear Lake, extra care must be taken to prevent sediment from entering the lake, both during and after construction. A SWPPP will be prepared addressing these issues. Silt fences and exclusion fencing will be required during construction to contain soil and reduce chance of damage to native vegetation. Disturbed area will be reseeded with the appropriate plants after construction is complete. Following are historical aerial photographs, historical topographic maps and the proposed wetland restoration plan.

More opportunities from California → Lake County

Same awarding agency

NAICS: 238910
SLED
Seigler Springs North
Solicitation # PL-26-115
The Seigler Springs North project, identified by Major Use Permit PL-26-115/UP 21-17, is an approved cannabis cultivation operation located at 11615 and 11625 Seigler Springs North Road in Kelseyville, California. Approved by the Lake County Board of Supervisors on August 4, 2026, the project includes three A-Type 3 outdoor cultivation licenses with a total canopy of 130,680 square feet and a total cultivation area of 196,020 square feet. The site infrastructure consists of twenty-two 40 by 100 foot temporary light deprivation hoop-houses secured by a six-foot fence, two 8 by 40 foot shipping containers, a 40 by 20 foot compost area, and a 5,000-gallon fire suppression system. Additional facilities include one ADA-compliant portable restroom, a 15 by 15 foot trash enclosure, and five parking spaces, one of which is dedicated to ADA access. The project also includes a Type 13 Distributor Transport Only license for self-distribution and a Complex Grading Permit. Environmental compliance is managed under CEQA, with a Mitigated Negative Declaration confirming no significant environmental effects. Key requirements include the removal of approximately 128,000 square feet of vegetation, strictly limited to dead, dying, or diseased trees as identified by a certified forester or arborist. To mitigate habitat disturbance, the project establishes a 20-acre No Development Zone and requires the planting and protection of over 327 black oak saplings for seven years. The operation must adhere to California Public Resources Code sections 4290 and 4291 for defensible space, California Building Code Chapter 7A, and Lake County Air Quality Management District regulations. Operational mandates include maintaining Material Safety Data Sheets for all hazardous materials, storing pesticides in original labeled containers, and submitting a Site Management Plan under Order No. WQ 2019-001-DWQ for water quality compliance.
Site Preparation Contractors

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Guenoc Valley Mixed-Use Planned Development Project
Solicitation # DA24-01
The Guenoc Valley Mixed-Use Planned Development Project, identified by solicitation number DA24-01, is a phased development in Middletown, Lake County, California, led by applicant Lotusland Investment Holdings Inc. The project encompasses the construction of resort facilities, including residential units, boutique hotels, neighborhood-serving retail, restaurants, open space, and off-site workforce housing. A key component of the development is the Anasu Farms Tentative Subdivision Map, which involves eight phases and the creation of 34 new parcels, including 30 resort residential, one commercial, and three facilities parcels, along with six peripheral parcels and a community clubhouse. Infrastructure work is a critical part of the project, specifically the Guenoc Ranch Tier 2 and 3 Roads, which involves widening and realigning existing roadways to meet safety standards, constructing new crossings, and repairing or installing 11 culverts. This work is governed by Lake and Streambed Alteration Agreement EPIMS Notification Number LAK-15321-R2 from the California Department of Fish and Wildlife. The project has undergone comprehensive environmental review under CEQA, with a certified Environmental Impact Report and adopted mitigation measures. Administrative approvals include a Development Agreement approved by the Lake County Board of Supervisors on October 21, 2025, and a Water Supply Assessment.
Land Subdivision

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 111419
SLED
East Side Farms Expansion
Solicitation # PL-25-243
East Side Farms, Inc. has obtained discretionary approval from the County of Lake for Major Use Permit PL-25-243 to operate a commercial cannabis cultivation project in Middletown, California. The project is located across multiple parcels on Jerusalem Grade and features a maximum outdoor canopy of 50,560 square feet along with a Type 13 self-transport only distribution license. The site infrastructure includes two groundwater wells for irrigation, a 2,100 square foot greenhouse for immature plants, a 3,000 square foot processing building, and existing facilities for drying and harvest storage. The project was approved on July 9, 2026, following a Negative Declaration under the California Environmental Quality Act, indicating no significant environmental impacts. Operational compliance is governed by several comprehensive plans, including a Property Management Plan, a Biological Resources Assessment, and a Hydrogeologic Assessment confirming sustainable groundwater use. A specialized Drought Management Plan mandates water conservation measures and a minimum 10 percent reduction in canopy area and water use during declared emergencies. Strict environmental and safety protocols are required, including the use of bear-proof waste containers, secondary containment for petroleum products, and the maintenance of Material Safety Data Sheets for all hazardous materials. Additionally, the project must adhere to an Air Quality Management Plan with a specific Odor Response Program and ensure ADA compliance through the installation of permeable paver parking.
Other Food Crops Grown Under Cover

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
South Main Street and Soda Bay Road Widening and Bike Lanes ProjectThe South Main Street and Soda Bay Road Widening and Bike Lanes Project in Lake County, California, involves the rehabilitation and expansion of a roadway corridor located just south of Lakeport. The scope of work covers a 0.5-mile segment of South Main Street and approximately 0.8 miles of Soda Bay Road. Key infrastructure improvements include the construction of two 12-foot wide travel lanes, a continuous 12-foot wide center turning lane, and 8-foot wide paved shoulders designed as Class II bicycle facilities. Additional deliverables include the undergrounding of overhead utility lines, surface drainage improvements, and a safety correction to a horizontal curve on Soda Bay Road to increase its radius from 230 to 550 feet. The project is governed by CEQA and NEPA environmental standards, with recent addendums approved in November 2025 to allow for nighttime construction to maintain vehicle and business access. Environmental compliance includes a Streambed Alteration Agreement with the California Department of Fish and Wildlife and adherence to the Statewide NPDES General Construction Activity Permit. Construction is expected to span two seasons and may be implemented in two phases depending on funding. Critical scheduling constraints require that all in-channel and culvert work be performed during the dry season and outside the Clear Lake Hitch spawning season. The project is managed by Lake County, with oversight from the Lake County Department of Public Works and the Community Development Department.
Highway, Street, and Bridge Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS