Y--NGWSP BLOCK 2-3 PIPELINE

Awarded
140R4026B0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline is a major federal construction initiative managed by the U.S. Bureau of Reclamation under the Department of the Interior, with the solicitation issued as a sealed bid (IFB) under number 140R4026B0001. The project entails approximately 11.9 miles of buried water transmission pipeline, including 6.0 miles of 42-inch diameter pipe and 5.9 miles of 48-inch diameter pipe, along with two 0.3-million-gallon ground-level storage tanks, access roads, wash and bored crossings, precast manholes, concrete thrust collars, miter bends, valves, air valves, blowoffs, road and utility crossings, erosion control systems, cathodic protection, and SCADA equipment. The work is to be performed in San Juan County, New Mexico, with all materials and equipment subject to stringent handling, storage, and transportation standards, including use of padded bolsters for steel pipe, protective tarps, and compliance with manufacturer and fabricator instructions. The contract requires full adherence to Buy American provisions, and small business participation goals are set at 5% for woman-owned small businesses and 3% for HubZone small businesses. The solicitation, posted on June 24, 2026, with a response deadline of June 30, 2026, mandates that bids be submitted as sealed originals and one copy, clearly marked with the offeror’s information, solicitation number, and due date, and must include a bid guarantee. Awards will be made to the lowest priced responsive and responsible bidder, with pricing evaluated for fairness, reasonableness, and balance. The total bid price excludes estimated Navajo Nation and New Mexico Gross Receipts Taxes, which will be reimbursed through invoices during performance. The contract’s period of performance requires commencement within 21 days of notice to proceed and full completion within 675 calendar days. Technical administration is governed by a designated Contracting Officer’s Representative (COR), who will inspect work, approve documentation, and verify as-built drawings monthly before progress payments are processed; payments follow FAR 52.232-27, are tied strictly to physical completion, and exclude advance payments. All offerors must have current representations and certifications submitted in SAM, including compliance with FAR clauses covering gratuities, contingent fees, anti-kickback procedures,

General Info

Construction of 11.9-mile water pipeline with infrastructure in New Mexico, valued $100-$150 million.

Contract Value

$72,863,604.42

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT, USA

Set-Aside

NONE

Award Issued Date

Documents

38

140R4026B0001 Questions and Answers Document

PDF, High priority: read this firstq-and-a
High

140R4026B0001 Updated Questions and Answers

PDF, High priority: read this firstq-and-a
High

140R4026B0001 Updated Questions and Answers 24JUNE26

PDF, High priority: read this firstq-and-a
High

Amendment 0001 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation 140R4026B0001

PDF, High priority: read this firstamendment
High

Attachment 2 Draft NGWSP Block 2-3 Drawings

PDF, High priority: read this firstdrawings
High

Attachment 4 - Small Business Subcontracting Plan

DOCX, High priority: read this firstsubcontracting-plan
High

Attachment 4 Small Business Subcontracting Plan Template

DOCX, High priority: read this firstsubcontracting-plan
High

Draft Geotechnical Drawings and Logs Attachment 3

PDF, High priority: read this firstspecifications
High

Draft Geotechnical Drawings and Logs for NGWSP Block 2-3

PDF, High priority: read this first131 pages · geotech-drawings
High

Geotechnical Weathering and Rock Properties Reference

PDF, High priority: read this firstspecifications
High

Navajo-Gallup Water Supply Project Block 2-3 Pipeline Pre-Bid Conference Presentation April 2026

PDF, High priority: read this firstindustry-day
High

Navajo-Gallup Water Supply Project Block 2-3 Price Schedules Draft

PDF, High priority: read this firstspecifications
High

Navajo-Gallup Water Supply Project San Juan Lateral Block 2-3 Line Pipe Drawings

PDF, High priority: read this first90 pages · drawings
High

Navajo-Gallup Water Supply Project San Juan Lateral Block 2-3 Specifications

PDF, High priority: read this firstspecifications
High

NGWSP BLK 2-3 Specifications 06092026

PDF, High priority: read this firstspecifications
High

NGWSP BLK 2-3 Specifications Section 01 56 15 and 01 57 60

PDF, High priority: read this firstspecifications
High

Pre-Solicitation Notice for Navajo-Gallup Water Supply Project Block 2-3 Pipeline

PDF, High priority: read this first2 pages · presolicitation
High

San Juan Lateral Block 2-3 Pipeline Price Schedule B Draft

PDF, High priority: read this first850 pages · specifications
High

Solicitation 140R4026B0001 Block 2-3 Pipeline Construction

PDF, High priority: read this firstifb
High

Solicitation 140R4026B0001 Navajo-Gallup Water Supply Project Block 2-3 Pipeline Draft IFB

PDF, High priority: read this firstifb
High

Solicitation 140R4026B0001 NGWSP Block 2-3 Pipeline

PDF, High priority: read this firstrfp
High

Solicitation Amendment 0003 for NGWSP Block 2-3 Pipeline 140R4026B0001

PDF, High priority: read this firstamendment
High

Solicitation Amendment 002 for NGWSP Block 2-3 Pipeline 140R4026B0001

PDF, High priority: read this firstamendment
High

Solicitation Amendment 140R4026B0002 for NGWSP Block 2-3 Pipeline

PDF, High priority: read this firstamendment
High

Wage Determination NM20260040 Heavy Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20260040 Heavy Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20260046 Building Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20260046 Building Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

BLK 2-3 Site Visit Sign-In Sheet

PDF, Low priorityother
Low

NGWSP BLK 2-3 Auger Bore Drawings 05182026

PDF, Low prioritydrawings
Low

NGWSP BLK 2-3 Drawings Attachment 2-2

PDF, Low prioritydrawings
Low

NGWSP Block 2-3 Pipeline Sources Sought Notice

PDF, Low priority2 pages · sources-sought
Low

Attachment_2_-_00_00_02_NGWSP_BLK_2-3_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
NGWSP BLOCK 2-3 PIPELINE

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 10 hours
View Details

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS