Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Y--NGWSP INTAKE & RIVER PUMPING PLANT

Awarded
140R4025R0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Navajo-Gallup Water Supply Project (NGWSP) Intake and River Pumping Plant contract, solicitation 140R4025R0023, is a firm-fixed-price construction project issued by the U.S. Department of the Interior Bureau of Reclamation. Located approximately 11 miles west of Farmington, New Mexico, the project scope includes the construction of a new river pumping plant, metal building systems, cast-in-place concrete structures, vertical turbine pumping units, steel manifold piping, and SCADA systems. The work also involves selective site demolition, channel modifications, and the installation of water quality monitoring equipment. The project magnitude is estimated between $50 million and $80 million, with a performance period beginning April 3, 2026, and concluding by October 20, 2028. Award is based on a Best Value trade-off under FAR Part 15, evaluating technical approach, staff qualifications, quality control, past performance, safety, and small business participation, with the combined weight of these technical factors approximately equal to the proposed cost. Contractors must adhere to strict quality control and environmental regulations, specifically the Clean Water Act, and comply with Davis-Bacon Act prevailing wage rates for San Juan County. Key administrative requirements include electronic invoicing via the Invoice Processing Platform (IPP) and the implementation of an Indian Preference hiring plan. Final acceptance of all materials and completed systems occurs exclusively at the jobsite following rigorous inspection and testing.

General Info

Contract Value

$67,726,344

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

UT, USA

Set-Aside

NONE

Award Issued Date

Documents

50

00_00_02_Dwgs-B_201-285_22x34_04-20-2025_4 - Engineering Drawings and Notes

PDF, High priority: read this firstspecifications
High

140R4025R0023 Attachment 1-2 Specifications Price Schedule

PDF, High priority: read this first60 pages · specifications
High

140R4025R0023 Attachment 2.3 Slide Gates and Baffle Gates Drawings

PDF, High priority: read this first94 pages · specifications
High

140R4025R0023 Attachment 2.5 Construction Plans for PNN River Station Pipeline As-Builts

PDF, High priority: read this firstconstruction-plans
High

140R4025R0023 Attachment 9 - Subcontracting Plan Template

DOCX, High priority: read this firstsubcontracting-plan
High

140R4025R0023 Questions and Answers Round 2

PDF, High priority: read this first4 pages · q-and-a
High

140R4025R0023 Questions and Answers Round 3

PDF, High priority: read this first2 pages · q-and-a
High

Amendment 0001 to Solicitation 140R4025R0023 for NGWSP Intake & River PP

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 to Solicitation 140R4025R0023 for NGWSP Intake & River PP

PDF, High priority: read this first21 pages · amendment
High

Amendment 0003 to Solicitation 140R4025R0023

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 to Solicitation 140R4025R0023 for NGWSP Intake & River PP

PDF, High priority: read this first34 pages · amendment
High

Amendment 0005 to Solicitation 140R4025R0023

PDF, High priority: read this first14 pages · amendment
High

Amendment 0006 to Solicitation 140R4025R0023

PDF, High priority: read this first2 pages · amendment
High

Amendment 0007 to Solicitation 140R4025R0023

PDF, High priority: read this first2 pages · amendment
High

DRAFT_140R4025R0023 Attachment 1 - Specifications Price Schedule 04102025

PDF, High priority: read this firstspecifications
High

DRAFT_140R4025R0023_Subcontracting_Plan_Template

DOCX, High priority: read this firstsubcontracting-plan
High

Draft Geology Attachment 3 - Weathering and Rock Characteristics

PDF, High priority: read this firstspecifications
High

Drawing Index and Site Civil Plans 00_00_02_Dwgs-B_001-100_22x34_04-20-2025_4

PDF, High priority: read this firstspecifications
High

Geology Attachment 3 - Weathering and Rock Characteristics

PDF, High priority: read this firstspecifications
High

Grounding and Electrical Installation Details Drawing 00_00_02_Dwgs-B_286-320_22x34_04-10-2025_4

PDF, High priority: read this firstspecifications
High

Navajo-Gallup Water Supply Project Concrete Outline Outlet Channel Drawings

PDF, High priority: read this first100 pages · specifications
High

Navajo-Gallup Water Supply Project Pumping Plant Architectural Drawings

PDF, High priority: read this first10 pages · drawings
High

Navajo-Gallup Water Supply Project San Juan Lateral Price Schedule B

PDF, High priority: read this first230 pages · price-schedule
High

Past Performance Questionnaire Attachment 6 for Solicitation 140R4025R0023

PDF, High priority: read this firstpast-performance
High

PNN River Station Pipeline Construction Plans As-Builts 04-10-2025

PDF, High priority: read this firstconstruction-plans
High

Presolicitation Notice for Navajo-Gallup Water Supply Project Intake & River Pumping Plant

DOCX, High priority: read this firstpresolicitation
High

San Juan Lateral Reach 1 Intake and River Pumping Plant Price Schedule

PDF, High priority: read this first1544 pages · price-schedule
High

Solicitation 140R4025R0023 Intake & River Pumping Plant

PDF, High priority: read this first118 pages · rfp
High

Solicitation 140R4025R0023 Intake & River Pumping Plant Construction

PDF, High priority: read this first4 pages · ifb
High

Solicitation 140R4025R0023 - NGWSP Intake & River Pumping Plant RFP

PDF, High priority: read this firstrfp
High

Structural Reinforcement and Special Inspection Notes Drawings 00_00_02_Dwgs-B_101-200

PDF, High priority: read this firstspecifications
High

Wage Determination NM20250040 Heavy Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20250040 Heavy Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20250046 Building Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20250046 Building Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

Wage Determination NM20250046 Building Construction San Juan County NM

PDF, High priority: read this firstwage-determination
High

140R4025R0023 Attachment 6 Past Performance Questionnaire

PDF, Low prioritypast-performance
Low

140R4025R0023 Attachment 8 - Key Personnel Form

DOCX, Low prioritykey-personnel-form
Low

140R4025R0023 Questions and Answers Round 1

PDF, Low priority1 page · q-and-a
Low

140R4025R0023 Questions and Answers Round 4

PDF, Low priority1 page · q-and-a
Low

Attachment 2.7 Drawings for Solicitation 140R4025R0023

PDF, Low priority15 pages · drawings
Low

DRAFT_140R4025R0023 Attachment 7 Experience Form

DOCX, Low priorityexperience-form
Low

Draft Attachment 8 - Key Personnel Form 3

DOCX, Low prioritykey-personnel-form
Low

Experience Worksheet Attachment 7 for Solicitation 140R4025R0023

DOCX, Low prioritypast-performance
Low

Intake and River Pumping Plant Site Visit Sign-in Sheet

PDF, Low priorityother
Low

Navajo-Gallup Water Supply Project San Juan Lateral Reach 1 Intake and River Pumping Plant Drawings

PDF, Low priority100 pages · other
Low

NGWSP River Intake Pumping Plant Pre-Bid Conference Agenda 8OCT2025

PDF, Low priority23 pages · industry-day
Low

River Intake and Pumping Plant Site Visit Attendance Record

PDF, Low priorityother
Low

Standard Drawings for Concrete Structures - Joint Details 40-D-5246 to 40-D-5248

PDF, Low priority35 pages · other
Low

DRAFT_140R4025R0023_Attachment_2_-_00_00_02_Dwgs-B_NGWSP-Intake1_001-356_22x34_04-10-2025_3.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Dec 19, 2025 to Jan 16, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
Contacts1 person available
OfficeSALT LAKE CITY, UT, 84138, USA
Office AddressSALT LAKE CITY, UT, 84138, USA

Full Description

Show more
NGWSP INTAKE & RIVER PUMPING PLANT - This amendment to the pre-solicitation notice (synopsis) is to add 5 new attachments to replace DRAFT 140R4025R0023 Attachment 2. Some contractors have stated that the document won't open. These 5 new attachments are the same drawings, just split up into 5 smaller PDFs.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

10 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

29 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS