Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 14, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Folsom UHA Switchgear Replacement

Awarded
R16PS00263Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Solicitation R16PS00263 is a Total Small Business Set-Aside project issued by the Department of the Interior's Bureau of Reclamation for the Folsom Powerplant UHA Switchgear Replacement at the American River Division, Central Valley Project, in California. With an estimated cost between 1 million and 5 million dollars under NAICS code 237130, the scope of work involves the removal and replacement of station service switchgear, the installation of a fabricated power control building, and various electrical and structural modifications. Technical requirements include the installation of 4.16 KV UHA switchgear and PCB breakers, supported by detailed specifications for concrete, electrical systems, and hazardous materials management based on comprehensive site assessments. The contract stipulates a completion period of 300 calendar days, with liquidated damages set at 4,100 dollars per day. Administration is handled via the Mid-Pacific Regional Office, and the procurement process included multiple amendments to refine technical drawings, update price schedules, and extend proposal deadlines. The project requires strict adherence to hazardous materials protocols and includes specific CLINs for mobilization, document management, and the removal and disposal of existing equipment.

General Info

Contract Value

$3,151,600

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

9

Amendment 004 - Folsom UHA Switchgear Replacement (B16PS00263)

PDF, High priority: read this firstamendment
High

Folsom UHA Switchgear Replacement - Hazardous Materials Assessment

PDF, High priority: read this firstspecifications
High

R16PS00263 Amendment 001 - Folsom UHA Switchgear Replacement

PDF, High priority: read this firstamendment
High

R16PS00263 Amendment 002 - Folsom UHA Switchgear Replacement

PDF, High priority: read this firstamendment
High

R16PS00263 Folsom UHA Switchgear Replacement - Sections D-G

PDF, High priority: read this firstcontract-document
High

Section C - Description / Specifications (Part 1 of 3)

PDF, High priority: read this firstspecifications
High

Section C Part 3 - 4.16 KV UHA Switchgear Technical Specifications

PDF, High priority: read this firstspecifications
High

Solicitation R16PS00263 Amendment 003 - Folsom UHA Switchgear Replacement

PDF, High priority: read this firstamendment
High

Solicitation R16PS00263 - Folsom UHA Switchgear Replacement

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Notice updated

Response deadline added: Mar 30, 2016. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Denver Federal Center
Contacts1 person available
OfficeDENVER, CO, 80225, USA
Office AddressDENVER, CO, 80225, USA
Contacts
Matt ByrneContracting Officer

More opportunities from Department Of The Interior → Denver Federal Center

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS