Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on November 14, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y1DZ--Radiology Rm 121 Renovations (Elevated Floor Replacement) (Proj: 436-23-109)(VA-23-00009103)

Closed
36C25922Q0806Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

41 minutes ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

41 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

41 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

41 minutes ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

about 1 hour ago

DEADLINE

in about 1 month

General Info

Contract Value

$117,425

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

12

36C25922Q0806+0001.docx

DOCX

36C25922Q0806+0002.docx

DOCX

36C25922Q0806+0003.docx

DOCX

36C25922Q0806_1.docx

DOCX

Attachment+1_Wage+Determination_MT20220040_9.9.22.pdf

PDF

Attachment+2_SOW+Photos.docx

DOCX

S04+436-23-109+Site+Visit+Sign+In.pdf

PDF

S04+-+Site+Visit++Meeting+Agenda-amended.docx

DOCX

S04+-+Site+Visit++Meeting+Agenda-original.docx

DOCX

S05+Design+Guide.pdf

PDF

S05+Photos+Attachment.docx

DOCX

S05+Room+121+Dimensions.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Nov 11, 2022 to Nov 21, 2022. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Denver D Robb (CSContract Specialist

Full Description

Show more
Block 14 Continued: The purpose of this amendment is to provide responses to the questions (RFI #2): The following questions are in regards to the Fort Harrison VA, Radiology Rm. 121 Renovations Project: 1. Site photos and further inspection during site walk indicates there is the presence of black mastic under existing floor tile. Will the VA consider leaving existing tile in place and overlaying existing tile with new specified LVT? Please confirm if contractor is to abate or overlay and encapsulated with new flooring Response: We want to encapsulate as much as possible but need to keep uniformity w/ the adjacent space to prevent any safety issues w/ an uneven surface. 2. Reference solicitation page 5 of 43 General Contractor Requirements updating w/ new flooring & casework . There is no reference on drawings regarding casework other than the previous statement above in the SOW. Is there casework for this project? Staff referenced filing cabinets during site walk that could be purchased by the VA. Please advise. Response: Please delete this requirement for casework. 3. There is an existing cooling unit located within the space specifically cools radiology equipment in the office by blowing cool air under the floor to vent at various locations. a. Given that the raised floor will be removed please confirm the cooling unit will no longer be needed and removed by contractor. Discussions with GE representative indicated that current equipment would be fine providing that a room temperature of 70 degrees or less could be maintained for the equipment in the space. Response: Confirmed, cooling unit to be removed. b. Please clarify if a new unit is required for this space? If so, please provide the specific equipment and ducting layouts for Room 121. Response: A new split unit will be required. This should be a simple selection for a pair of chill water-cooled unit (either wall cassette or fan coil type). c. Please confirm the design will be the responsibility of the VA. Response: VA will provide specifications. 4. Does the space require new ceiling and grid? Previous remodeling project have included up grade of the ceiling grid as all other finishes in space will be updated. Please advise. Response: New ceiling grid will be required. Also, include upgrade lighting w/ dimmable led fixtures. 5. Reference solicitation page 5 of 43 General Contractor Requirements Wall and floor finishes will be updated to align with the recommended standards in the Design Guide, walls will meet a level 4 finish and the floors will be a LVT that meets the approved VA finish schedule (provided upon request). Answers to previous RFI questions regarding flooring reference both LVT and Welded Seamless Flooring for the control room area. It is GCH s understanding that the station has been ion the process of standardizing finishes in the space to minimize the number of products for replacement. Past renovation projects have included Armstrong Natural Creations LVT for the floor upgrades. Please confirm this is the desired product or provide specific alternate product. Response: Confirmed Armstrong Natural Creations LVT for the floor upgrades.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS