This Government Contract opportunity from Department Of Defense was posted on April 15, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Dworshak Powerhouse Bridge Cranes Rehabilitation

Awarded
W912EF-09-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the comprehensive rehabilitation of two 350-ton bridge cranes located in the powerhouse at Dworshak Dam. The scope of work includes extensive mechanical and structural upgrades such as replacing wire ropes, motor couplings, bearings, and operator controls, as well as the repair of drums and inspection of lifting beams. Electrical requirements entail the complete removal of existing wiring and equipment to be replaced with new motors, brakes, radio controls, load cells, and a hardwired public address system. All new components must be engineered and designed by a registered professional engineer, and the final systems must be tested and certified at their rated capacity. The project mandates strict adherence to safety and quality control standards, requiring a dedicated Site Safety and Health Officer and a separate Quality Control person. Environmental protocols are in place for lead abatement regarding the existing paint system, with specific restrictions against on-site spray painting. Administrative management will be handled through the Resident Management System and QCS for tracking finances, scheduling, and submittals. The estimated construction magnitude is between 1 million and 5 million dollars, with the project open to both large and small business concerns under NAICS code 238290.

General Info

Contract Value

$3,024,639.23

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

WA, USA

Set-Aside

NONE

Award Issued Date

Documents

10

Amendment+0001.pdf

PDF

Amendment+0002.pdf

PDF

Downloading+and+viewing+drawings.docm

DOCM

Plans1.zip

ZIP

Plans2.zip

ZIP

Plans3.zip

ZIP

Plans4.zip

ZIP

Plans-Amendment+0001.zip

ZIP

Site+Visit+Attendees+List.pdf

PDF

W912EF-09-R-0002.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Mar 4, 2009 to Mar 11, 2009. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 11, 2009 to Mar 10, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
ContactsNo contacts available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
ContactsNo contact information available

Full Description

Show more
The work shall consist of rehabilitating two 350-ton bridge cranes located in the powerhouse at Dworshak Dam. Mechanical and structural work for the rehabilitation of the two bridge cranes includes replacing existing wire rope, motor couplings, bearings, operator's cab, operator's controls, modify or replace mounting bases for motors and brakes, provide guardrails, as well as inspection, cleaning, alignment, balancing, and testing. Drums shall be removed, repaired and reinstalled. Two lifting beams shall be inspected. The Contractor shall engineer and design all new components of the system and submit computations and drawings. The design engineer for all calculations and drawings shall be a registered professional engineer. Electrical work includes repair of the existing grounding straps to the crane rails, removal of the operator's controls, the removal of all electrical equipment and wiring on the two bridge cranes, and the design, fabrication, factory testing and field testing, furnishing, and installation of electrical and control equipment and associated systems. The electrical equipment and associated systems include motors, brakes, limit switches, complete control systems including radio control, collectors and conductors, conduit, wiring, load cells and indication, a complete, hardwired, crane-mounted public address (PA) system (wireless will not be acceptable), and auxiliary devices required to replace and enhance the cranes' electrical power, lighting, and control systems. The bridge cranes shall be inspected, tested and certified at the rated capacity by the Contractor. Personnel training shall be conducted by the Contractor. The existing paint system has a primer containing red lead. Any damaged paint, rust, or corrosion is to be removed and receive touch-up painting. Only items taken away from the Powerhouse to the Contractor's facility for refurbishment will receive full lead abatement prior to being repainted. All on-site lead abatement, containment and disposal incidental to on-site painting activities shall be as specified. Spray painting shall not be performed at the Project. The Contractor shall provide an authorized representative responsible for the preparation of the schedule and all required updating (activity status) and preparation of reports. The authorized representative shall have previously developed, created, and maintained at least three electronic schedules for projects similar in nature and complexity to this project and shall be experienced in the use of the scheduling software. The Contractor shall provide a Site Safety and Health Officer (SSHO) provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The Contractor Quality Control (QC) person cannot be the SSHO on this project, even though the QC has safety inspection responsibilities as part of the QC duties. The SSHO shall have a minimum of three years safety work on similar project, a 30-hour OSHA construction safety class or equivalent within last three years, and Competent Person Training as needed. The Government will use the Resident Management System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor shall use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. This joint Government-Contractor use of RMS and QCS will facilitate electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, track, and electronically share information with the Government in the following areas: a. Administration b. Finances c. Quality control d. Submittal monitoring e. Scheduling f. Import/export of data The Contractor shall be responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with the contract requirements. The system shall cover all on-site construction operations and shall be keyed to the proposed construction sequence. The Contractor shall utilize established in-house quality control procedures to assure full compliance with all off-site work. The Contractor shall submit daily reports for all on-site work and for all off-site work. Contractor is required to follow the procedures in the Army Corps of Engineers Safety Manual, which can be found online at http://www.hq.usace.army.mil. At the Headquarters homepage, select Safety and Occupational Health. Solicitation No. W912EF-09-R-0002 will be posted to the FBO website on or about February 2, 2009. Proposals will be due no sooner than 30 calendar days after actual solicitation issuance date. The proposal due date information will be contained in the solicitation and any solicitation amendments that may be issued. A site visit will be offered approximately 2 weeks after the solicitation is made available to offerors. See solicitation for details about the site visit. Solicitation is open to both large and small business concerns. NAICS code for this project is 238290, and the small business size standard is $14,000,000 average annual receipts. Estimated magnitude of construction is between $1,000,000 and $5,000,000. When available, the solicitation documents for this project will be available via FedBizOpps, https://www.fbo.gov NO CD's OR HARD COPIES WILL BE AVAILABLE. Offerors are responsible for checking the referenced page for any update(s) to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document posted at the referenced website. To obtain automatic notifications of updates to this solicitation, you MUST log in to FedBizOpps.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the Add Me To Interested Vendors button in the listing for this solicitation on FedBizOpps.gov.

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

2 days ago

DEADLINE

in 1 day
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS