Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on February 3, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--Heat Straightening at Lock and Dam 5A

Awarded
W912ES-15-T-0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 22 days

General Info

Contract Value

$39,000

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

MN

Set-Aside

NONE

Award Issued Date

Documents

8

15-T-0037.pdf

PDF

A02_Downstream_I-Wall_Gate.docx

DOCX

A02_M_L_5A_21_1_General_Elevation.pdf

PDF

A02_M_L_5A_21_4_Miter_Girders.pdf

PDF

IMG_2481.jpg

JPG

IMG_2482.jpg

JPG

IMG_2483.jpg

JPG

IMG_2484.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 5:00 AM UTC to 5:00 PM UTC on Jan 30, 2015. The point of contact changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts

Full Description

Show more
Lock and Dam 5A Miter Gate Repair by Heat Straightening Scope of Work 1. General. The contractor shall provide all plant, labor and material to repair bent webs and flanges of the vertical miter girder member through heat straightening. 2. Repair Areas. The downstream intermediate wall miter gate was damaged as the result of a tow boat impact several years ago. The miter girder (last girder towards the centerline of the lock chamber) was left with an approximate four inch permanent distortion toward the lock wall on the upstream side of the member. This distortion is limited to approximately the top 8 feet of the member directly under the top horizontal girder. This permanent deflection does not allow the miter contact blocks to meet as intended. The miter girder is a built up member made up of 3/8 inch thick web plate and L 6 x 4 x flange angles. These components are riveted together. See attached photographs and as-built drawings. They are comprised of 1930s vintage ASTM A 7 steel. Required yield strength was specified as 33,000 pounds per square inch. See attached as-built drawing and damage photos. 3. Required Relevant Experience. The Contractor shall have at least 10 years experience in conducting heat straightening repairs for damaged steel structures. During the preceding three year period, the Contractor shall have conducted an average of at least five heat straightening projects per year. The personnel conducting the heat straightening must have a minimum of 5 years experience on heat straightening projects. Experience documentation shall include: date of project, location, bridge owner, number and type of members straightened, and duration of the project. 4. Equipment. a. Heating shall be with an oxygen-fuel combination. The fuel provided will be acetylene. b. Heat application shall be by single or multiple orifice tips only. The size of the tips shall be proportional to the thickness of the heated material. As a guide, the tip sizes shown in the table below are recommended. No cutting torch heads are permitted. Steel Thickness (in) Orifice Type Size less than 1/4 Single 3 3/8 Single 4 1/2 Single 5 5/8 Single 7 3/4 Single 8 1 Single Rosebud 8 3 2 Single Rosebud 8 4 c. Jacks, come-alongs or other force application devices shall be gauged and calibrated so that the force exerted by the device may be controlled and measured. No external force shall be applied to the structure by the Contractor unless it is measured. 5. Damage Assessment. a. Suspected areas of cracking shall be called to the attention of the Government before any testing or work is performed. 6. Heat Application. a. The temperature of the steel during heat straightening shall not exceed 1100 degrees Fahrenheit. b. The Contractor shall use one or more of the following methods for routine, ongoing documented temperature verification during heat straightening: Temperature sensitive crayons, Pyrometer, or Infrared non-contact thermometer. c. Material should be heated in a single pass and allowed to cool to below 250 degrees Fahrenheit prior to re-heating. d. Vee heats shall be shifted over the yield zone on successive heating cycles. e. Simultaneous vee heats may be used provided that the clear spacing between vees is greater than the width of the plate element. f. Repair of previously heat straightened members in the same region of damage may be conducted once. Further repairs of previously heat straightened members will not be conducted unless approved by the Government. 7. Application of Jacking Forces. a. Jacks shall be placed so that forces are relieved as straightening occurs during cooling. 8. Field Supervision of Repair. a. Heating temperatures shall be routinely monitored to ensure compliance with specified limits. 9. Tolerances. a. The dimensions of heat straightened structural members shall conform to the tolerances specified in the following table except as noted in paragraph 8. b. Member Type Minimum Tolerance Beams, Truss members, or Columns Overall At Impact Point inch over 20 ft inch over 20 ft Local Web Deviations d/100 but not less than inch Local Flange Deviations b/100 but not less than inch d is the depth of the member, b is the width of the flange b. Relaxation of the tolerance limits will be at the discretion of the Government based on one or more of the following conditions: Type and location of damage in the member or degree of restoration required to restore structural integrity. 10. Lock and Dam 5A Location and Lockmaster. Mr. Mark Beseler, Lockmaster W679 State Highway 35 Fountain City, WI 54629-7214 +1 (555) 000-0000 11. Government Technical Point of Contact. Ms. Elizabeth (Beth) Killian, P.E. 180 5th Street East St. Paul, MN 55101 +1 (555) 000-0000 +1 (555) 000-0000 (cell) 12. Government Provided Equipment, Personnel, and Services. a. The Government shall provide an aerial lift sufficient to accommodate the contractor's crew and tools. The Government will provide the operator for the aerial lift. The aerial lift and operator shall be made available for up to three work days. Use of the aerial lift and operator is restricted to regular duty work hours during the work week. It may not be used on federal holidays or weekends. b. The Government shall provide a means to transport the contractor's materials between the parking lot and the lock chamber. c. The Government shall provide crane support to place the contractor's tools and equipment on the aerial lift in the lock chamber. Use of the crane and operator is restricted to regular duty work hours during the work week. It may not be used on federal holidays or weekends. d. The Government Technical Point of Contact shall be on site during the heat straightening operation to offer any technical assistance/ approvals necessary to complete the work. e. The Government shall provide sufficient oxygen and acetylene gas to complete the repairs described in this scope of work. f. The Government shall provide jacking brackets per the contractor's submitted sketch at the contractors specified locations. The jacking brackets requested by the contractor shall be limited to an eight inch by quote mark thick angle (L8 quote mark x6 quote mark x quote mark ) with gussets welded for support. The bracket may only remove 3 rivets at a time when attaching to the gate. The bracket may be repositioned as needed limiting the removal of rivets to 3 at a time. 13. Site Visit. The Government will provide a site visit during regular duty work hours during the work week. It may not be requested on a federal holiday or weekend. 14. Schedule. The Contractor shall complete all work to straighten the bent webs and flanges of the vertical miter girder member as shown in the attached photos no later than 1 March 2015. 15. Coordination. The Contractor shall coordinate with the Lockmaster and Government Technical Point of Contact a minimum of five (5) work days prior to the scheduled start date to ensure all necessary arrangements for access, operators and removal of rivets have been made. If the contractor will need special jacking brackets installed, due to the repair location, the contractor shall provide the Government Technical Point of Contact the required location, a sketch of the brace and the material thicknesses to jack against a minimum of seven (7) work days prior to the scheduled start date to ensure fabrication and installation prior to the contractors arrival. 16. Submittals. All submittals shall be sent to the Government Technical Point of Contact. Electronic submission of required documentation is acceptable. At least three business days shall be allowed for review unless noted otherwise. All submittals are for Government Approval. a. Relevant Experience. Description of previous relevant experience as noted above in paragraph 2. This submittal is required within five (5) calendar days of contract award. b. Equipment Description. Provide a description of tools, equipment, and personnel to be placed in the aerial lift, to include weight and area. The weights of all equipment over 100 pounds must be provided to ensure the Government provides an aerial lift capable of accommodating the contractor's personnel and equipment. This submittal is required within five (5) calendar days of contract award. c. Calibration. (i) Documentation showing electronic temperature measuring devices have been calibrated within the previous year shall be submitted within 7 calendar days of contract award. d. Schedule. A schedule showing starting date and estimated ending date shall be submitted within 7 calendar days of contract award. Attachments: Photographs 1, 2, 3, and 4 As-Built Drawings: M-L5A-21-1 27 Foot Miter Gate General Drawing M-L5A-21-4 Details of Girders

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS