Z -- Replace Unit Substation #9 - G Range Building

Active
FA9101-06-B-0156Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the removal and replacement of a single exterior unit substation, including the replacement of all secondary feeders connected to it, while reusing the primary cables. The removal of asbestos-containing switchgear control cables will be handled by a separate contractor in coordination with this work. The project timeline allows for six consecutive calendar days to complete removal and installation, with all work scheduled to occur between April 1 and October 30, 2007. The medium voltage system outage is restricted to a maximum duration of 60 hours, typically spanning from Friday evening to early Monday morning over a holiday weekend, coinciding with the start of the low voltage outage. Additionally, a separate one-day weekend outage will be granted for preparatory modifications to the substation foundation. The estimated cost for this construction effort ranges from $250,000 to $500,000, and the contract will be awarded under the Small Business Competitiveness Demonstration Program. A site visit is strongly encouraged to better understand the project requirements. The bid opening will occur 30 calendar days after issuance of the solicitation. The contract is designated under NAICS code 237130 and includes a point of contact for further inquiries.

General Info

Remove and replace exterior unit substation, secondary feeders; reuse primary cables; six-day schedule; $250K-$500K cost.

Agency

N/A

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
This requirement is for the removal and replacement of one exterior unit substation. All secondary feeders that are fed from this unit substation will also be replaced. Primary cables for this substation will be reused. Removal of existing switchgear control cables containing asbestos will be performed by another contractor in conjunction with this requirement. The awardee will have 6 consecutive calendar days for removal and installation. The work will only be allowed to be executed between 1 April 2007 and 30 October 2007. Also, the duration of the outage for the medium voltage system will be no greater than 60 hours. The outage is typically granted between 1700 hours on Friday evening and 0500 hours on Monday morning. The medium voltage outage will take place during a holiday weekend. The low voltage outage will begin the same time as the medium voltage outage. Also, a one day outage will be given on a weekend to prepare the existing unit substation foundation for a required modification. A site visit is strongly recommended. The performance period shall be as described above. The estimated construction magnitude is between $250,000 and $500,000. Award is pursuant to the Small Business Competitiveness Demonstration Program. Bid opening date shall be 30 calendar days after issuance of the solicitation.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
Solicitation 2026-RFP-0272 is a request for proposals from the City of Pasadena Water and Power Department to provide comprehensive wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves the maintenance and documentation of approximately 11,000 wood poles to ensure system reliability and compliance with CPUC General Orders 95 and 165. Key deliverables include georeferenced UAV reports, the identification of structural defects, and specific maintenance tasks such as the installation of trusses, guy guards, and pole tags. The contract is designed for an initial four-year term with two optional one-year extensions. Proposers must submit separate technical and price proposals via the City's eProcurement Portal by November 5, 2026. Evaluation is based on a points-based scoring system focusing on technical competence, safety practices, and experience, with specific 5-point preferences available for certified California small/micro-businesses or local Pasadena businesses. Mandatory requirements include FAA Part 107 certification for UAV operations, submission of Form AA-1 and AA-2, and a detailed quality assurance plan. Additionally, the contract prohibits the use of City data for training AI or machine learning models and requires strict adherence to ADA accessibility and prevailing wage laws.
Water & Power Department, Power Delivery

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

2 days ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS