Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on December 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--630-CSI-120 NY SPECT CT SITE PREP DESIGN BUILD

Closed
36C24224R0083Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
2026036-BID3289 ROADS AND BRIDGES ADMINISTRATION BUILDING RENOVATION
Solicitation # 2026036-BID3289
The Columbia County Board of Commissioners is soliciting bids for the renovation of the Columbia County Roads and Bridges Administration Building located in Appling, Georgia. The project aims to improve the facility's functionality and condition through the renovation of office, support, and common areas. The scope of work includes selective demolition, the installation of new finishes, and necessary modifications to mechanical, electrical, and plumbing systems to accommodate a new building layout. This is a lump sum contract requiring bidders to hold both a State of Georgia General Contractor's License and a Columbia County business license. A critical requirement for eligibility is attendance at the mandatory on-site pre-bid meeting on November 4, 2026, at 10:00 AM; failure to attend or arriving more than ten minutes late will result in automatic disqualification. Bids must be submitted electronically via the Bonfire portal by November 19, 2026, at 12:00 PM. Proposals must include a bid bond of at least five percent of the lump sum bid. Upon award, the successful contractor must provide performance and payment bonds equal to one hundred percent of the contract amount within ten days. The procurement process is managed by the Columbia County Procurement Department, with Glenn O'Steen serving as the Procurement Manager.
Columbia County Board of Commissioners

POSTED

about 7 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

This contract involves a comprehensive design-build project to prepare a site for the installation of a new GE SPECT CT Nuclear Medicine system at the Veterans Affairs Medical Center in Brooklyn, NY. The scope includes all necessary labor, materials, equipment, supervision, and safety measures to perform site demolition, renovation, and construction activities within an operational healthcare environment. The work encompasses the full renovation of approximately 1,000 square feet of radiology space, including the creation of specialized rooms such as main equipment, control, and injection rooms, with features like waterproof flooring, patient access considerations, and integrated monitoring systems. The project also requires the installation of a new HVAC system, including a rooftop glycol chiller, ductwork, humidification, and exhaust systems capable of maintaining strict temperature, humidity, and negative pressure standards, especially during pandemic emergency modes. The contractor is responsible for providing detailed architectural and engineering design services, ensuring compliance with VA specifications, safety regulations, and infection control protocols. They must coordinate all construction activities, including demolition of existing rooftop units, installation of new HVAC and electrical systems, and site preparation, while adhering to VA design guidelines and manufacturer specifications. The project has a strict completion deadline of August 2025, requiring meticulous project management, risk assessment, and coordination. Additionally, the contractor must utilize the VA’s construction management platform, complete mandatory privacy and safety training, and ensure all work is performed with a focus on safety, quality, and environmental responsibility. The contract emphasizes the importance of warranty, defect correction, and proper disposal of construction debris, with a focus on maintaining operational continuity and safety throughout the project duration.

General Info

Turnkey services for GE SPECT CT installation at VA Medical Center, New York, over 365 days.

Contract Value

$1,878,957.39

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Department of Veterans Affairs Network Contracting Office 2 VA New York Harbor Healthcare System 800 Poly Place, Brooklyn, NY, 11209, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

22

013200 Construction Documentation - VISN 2 ACC Platform Requirements

DOCX, High priority: read this first2 pages · sow
High

36C24224R0083 Amendment 0001

DOCX, High priority: read this firstamendment
High

36C2422R0083 - NY SPECT CT SITE PREP DESIGN BUILD

PDF, High priority: read this firstifb
High

3C242224R0083 Amendment 0002

PDF, High priority: read this firstamendment
High

630-csi-120 NY SPECT CT Design Build RFP

DOCX, High priority: read this first7 pages · rfp
High

630-CSI-120 NY SPECT CT Site Prep Design Build

DOCX, High priority: read this first116 pages · rfp
High

630-CSI-120 NY SPECT CT Site Prep - Selection Plan

PDF, High priority: read this firstspecifications
High

NUC-M037844-FIN-02-A: NM/CT 850 Final Study

PDF, High priority: read this firstspecifications
High

Participation Goals for Minorities and Females

PDF, High priority: read this first32 pages · wage-determination
High

Project 630-CS1-102: Gamma Camera RM 6503E/F 100% Submission

PDF, High priority: read this firstspecifications
High

S02 Additional Inserts - Safety and Subcontracting Requirements

PDF, High priority: read this first2 pages · specifications
High

Section 01 00 00 General Requirements - Modernize Elevators / Nuclear Medicine GE SPECT CT

DOCX, High priority: read this firstspecifications
High

Section 01 35 26 Safety Requirements

DOCX, High priority: read this first25 pages · specifications
High

Section 13 49 00 - Radiation Protection

DOCX, High priority: read this first11 pages · specifications
High

Section 23 31 00 - HVAC Ducts and Casings

DOCX, High priority: read this first13 pages · specifications
High

Section 23 74 13 - Packaged, Outdoor, Central-Station Air-Handling Units

DOCX, High priority: read this first14 pages · specifications
High

Section 23 84 00 - Humidity Control Equipment

DOCX, High priority: read this first12 pages · specifications
High

VA HVAC Design Manual (Rev. Nov 1, 2023)

PDF, High priority: read this firstspecifications
High

VA Imaging Services Design Guide (PG 18-12)

PDF, High priority: read this firstspecifications
High

ProductivityNOW Contractors Access Instructions

PDF, Low priorityother
Low

S02 VA ID PACKAGE

PDF, Low priorityother
Low

VA Privacy Training for Personnel without Access to VA Computer Systems

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Combined Synopsis

Notice updated

Response deadline changed from Dec 4, 2024 to Dec 6, 2024. The notice description changed.

Notice updated

Response deadline changed from Dec 6, 2024 to Dec 20, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)
Contacts1 person available
OfficeALBANY, NY, 12208, USA
Office AddressALBANY, NY, 12208, USA
Contacts
Contracting OfficerVladimir Stoyanov

Full Description

Show more
36C24224R0083 Page 1 of Page 30 of 123 Page 1 of Statement of Work Performance Period: 365 Calendar Days Description of Work: Provide turnkey services to include all labor, materials, tools, supervision, equipment, and safety necessary to design and construct the site preparation needed to install a new Nuclear Medicine GE SPECT CT for the Veteran s Affairs Medical Center, 423 East 23rd Street, New York, NY 10010 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp . Work shall meet all VA design guidelines and requirements. Equipment: GE 850ES NM/CT Nuclear Medicine Equipment. Specific Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labeling, commissioning, and site visits necessary to perform the site preparation. At a minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirements; additional information can be found in the VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26 : Manufacturer spec NUC-M037844-FIN-02-A.pdf VA TIL Specification 001121 Design Build Spec 013200 Construction Documentation.doc 01 00 00 General Requirements 01 35 26 Safety Requirements 134900 Radiation Protection 233100 HVAC Ducts and Casings 237413 Packaged, Outdoor, Central Station AHU 238400 Humidity Control Equipment VA 2020 Imaging Services Design Guide VA 2023 HVAC Design Manual VA Directive: 1105_02_D_2018-08-29 Radiation Directive 630-CSI-120 - Doc A - Scope of Work Meeting Attendance_24.02.23_Redacted Previous 100% drawing for reference only 630-CSI-102 Gamma Cam revised 100%r The Contractor shall provide Architectural Engineering Design Services to the extent needed for the production of the Work. Those services shall be furnished by Architects and Engineers licensed in the jurisdiction where the Work will be performed. The Contractor shall provide a design drawing, red-line drawing, and as-built drawing. Refer to attachment 630-CSI-102 Gamma Cam revised 100%r.pdf for reference only. The Contractor shall provide full renovation of the radiology space, approximate total of 1,000 square feet. The renovated space shall have a main equipment room, control room, and injection room. The Contractor shall provide wall protection, a door holder, a hand wash station, a patient lift, a ceiling picture, a patient storage area, and a patient monitoring system with an intercom function between the main equipment room and the control room. The electrical outlet shall be in proximity to allow staff to inflate the machine to move patients. Oxygen, Medical Air, and Medical Vacuum locations shall be in proximity to allow staff access. Flooring shall be waterproofed and allow the Environmental Management Service to easily clean and sanitize. Clean and Dirty Laundry shall be built into the cabinet. The design shall allow the patient stretcher to go directly under the new SPECT CT. All design and construction shall be in accordance with the VA Imaging Service Design Guide, Manufacturer Specifications, and VA TIL Specification. The Contractor shall provide demolition of the existing rooftop unit, as well as all ancillary equipment and ductwork. The Contractor shall provide a new standalone Heating, Ventilation, and Air Conditioning system (HVAC) located in the Outpatient Clinic 7th Floor mechanical room, with a minimum cooling capacity of 20 tons, air flow of 2,000 CFM, and associated reheat, exhaust system, and ductwork, supply, and return ductwork and humidification system. The new HVAC maximum footprint is 20 feet by 5 feet. The new HVAC must have a separate dehumidification cooling coil. The new ductwork and grill shall minimize airflow directly onto patients and staff for comfort. The Contractor shall provide localized HVAC temperature control for all three rooms and integrate it with the existing building management system (Integrated Control). The HVAC shall utilize Glycol Chilled Water for cooling, also installed as part of this project. The Contractor shall provide a new Variable Frequency Drive (VFD) exhaust system capable of maintaining negative pressure in the injection room and main equipment room. All design and construction shall be in accordance with VA TIL Imaging Service Design Guide, TIL HVAC Requirement, and VA TIL specification. The Contractor shall provide any supplement cooling coil to the HVAC unit to meet the minimum required cooling capacity for the pandemic emergency, which is 100% outside air. The renovated space must be capable of maintaining VA temperature, humidity, and negative pressure requirements by using 100% outside air during pandemic emergency mode. The Contractor shall provide a new year-round glycol chiller with a minimum cooling capacity of 20 tons. The glycol chiller shall be located on the roof of Building 6, adjacent to the new HVAC system for SPECT CT. The Contractor shall provide all pumps, insulation, breaker, strainer, piping, valves, temperature and pressure gauges, air bleeder, labeling, and electrical necessary to connect the chilled glycol to the new HVAC. The Contractor shall fill the glycol system with 40% propylene glycol. The Contractor shall provide structural engineering service to design and install a new foundation for the chiller. The Contractor shall provide duct humidification capable of delivering at minimum of 25-liter water per hour and shall be capable of meeting VA 20%-60% Relative Humidity requirement. All work performed shall be in an operational healthcare facility. The Contractor shall follow all Infection Control Risk Assessment (ICRA) and Interim Life Safety measures (ILSM) requirements as determined by the VA Infection Control and Safety Team. During equipment installation by the equipment manufacturer, the Contractor shall provide support for all electrical, data, and carpentry functions that are required to make the new equipment fully operational. The Contractor shall, at minimum, provide project management, risk assessment, risk register, biweekly meeting, schedule, critical path, milestone, and commissioning for the successful completion of the project. The Contractor shall utilize the VA-provided Construction Management Platform. The Contractor shall provide the startup of the unit and confirm the operation in accordance with the manufacturer s requirements. The Contractor shall provide a startup sheet and Standard Operating Procedure to the government indicating temperatures and pressures. Due to the urgency of the project, the Contractor shall complete the site prep before August 2025. Prior to mobilization, the Contractor must supply a timeline that meets the August 2025 completion date; the VA must be informed in advance of any difficulty in meeting the timeline, the reason for the change, and the path forward to meet the schedule. General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, commissioning, and site visits necessary to perform the site preparation. At a minimum, the following shall be performed: The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out an electrical power box that supplies power to the unit. The Contract shall provide and install all electrical piping connections by certified technicians in their trades. The Contractor shall test and verify all work to ensure proper operation. The Contractor must have OSHA training and specialized OSHA training. In the performance of all work, the workers must comply with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer's warranty that will exceed the one-year warranty the Contractor offers. A document shall have a minimum of the company, phone number, and an address of where the government can obtain the manufacturers for extended warranty. It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting. The Contractor shall provide an English-speaking working supervisor on-site at all times when work is being performed and for the duration of this project. Supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc. The Contractor shall post visible required warning signs and barriers prior to beginning any work. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government. The Contractor shall be responsible for the proper and safe removal and disposal of all debris. The contractor shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. The VA Directive 0063 requires 50% of waste to be prevented or recycled. The Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift. The C&A requirements do not apply, and a Security Accreditation Package is not required. The Contractor is responsible for completing the VA Privacy and Information Security Awareness training. VA Patient Privacy and Network Infrastructure None of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors that will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulations and complete the following training: VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or Use to VA Sensitive Information. Reference the attached Handbook 6500.6 Appendix A - Checklist for Information Security in the initiation phase of acquisitions. The system does not transmit or maintain electronic Protected Health Information. A Manufacturer Disclosure Statement for Medical Device Security (MDS2) form is not applicable. A VA Directive 6550 Pre-Procurement Assessment form is not applicable. Privacy Training: VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information All contractor employees and subcontractors participating under this contract are required to complete the VA's Privacy training requirement - VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information. Contractors must provide certifications of completion to the COR during each year of the contract. Training expires 365 days after the training is taken. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). The COR for the contract is responsible for ensuring the contractor takes the training and follows up with the annual requirements. See Attachment A VA Privacy Training for Personnel without Access to VA Computer Project Management Platform Requirement Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform. Contractor shall accomplish and complete the following tasks upon award of contract: Request access to the ACC platform and ProductivityNOW eLearning Site to project VA COR NLT 14 days after the contract award. Only staff that shall utilize the platform will be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Upon granting access, staff shall complete the required ACC training through the ProductivityNOW platform within 12 Calendar days. Upon successful completion of training, the contractor shall submit certificates of completion to COR NLT in 2 business days. Access to ProductivityNOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above. The contractor shall only use the ACC platform for contract-required submissions and official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor will an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of the platform shall not be the governing authority's contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration include but are not limited to RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertain to staff who were granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training. The purpose of Amendment 0001 is to provide RFI Questions and Answers and to extend the date and time due to December 6th and 2:00PM EST. Please see attachment 36C24224R0083 0001 for additional details. The purpose of Amendment 0002 is to extend the due date and time to December 20th at 2:00PM EST. Please see attachment 36C24224R0083 0002 for additional details.

More opportunities from Department Of Veterans Affairs → 242-NETWORK Contract Office 02 (36C242)

Same awarding agency

NAICS: 621511
New
Federal
Q301--FY27 (BASE+4) STAT Laboratory Testing - Syracuse (VA-27-00010334)
Solicitation # 36C24227Q0069
The Department of Veterans Affairs VISN 2 Network Contracting Office intends to award a firm fixed-price contract for STAT laboratory testing services at the Syracuse VA Medical Center. The proposed contract structure includes a base period followed by four option periods. The government intends to sole source this requirement to University Pathologists Laboratories under FAR 6.302-1(a)(2), though this special notice serves as market research to identify other capable providers, including various small business socioeconomic categories. The scope of work involves the 24/7, 365-day-a-year analysis, monitoring, and reporting of clinical and surgical specimens, utilizing advanced methods such as electron microscopy and molecular studies. Key operational requirements include picking up specimens within 30 minutes of a request and delivering final written reports within five working days. Critical results require immediate notification to authorized providers. To be eligible, the contractor must employ board-certified pathologists and accredited technologists and maintain mandatory certifications, including a NYS Department of Health Clinical Laboratory Permit, a CLIA license, and CAP or Joint Commission accreditation. This acquisition falls under NAICS code 621511. Interested parties must provide documentation of their technical expertise and socioeconomic status to the contracting officer within 10 calendar days of the notice publication.
Medical Laboratories

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS