This Government Contract opportunity from Department Of Veterans Affairs was posted on September 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z1DA--Replace roofing 607-22-106 (VA-24-00091745)

Awarded
36C25224B0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking a subcontractor for a fixed-price design-build project to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves the design and installation of a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system. Key deliverables include structural framing using wood or steel, the installation of three LED strip light fixtures with one emergency backup, and the submission of detailed shop drawings and project documents via Submittal Exchange in PDF and AutoCAD formats. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids equal to or greater than $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll reports and adherence to California prevailing wage determinations. Additionally, contractors must meet specific insurance minimums, including $1 million per occurrence for general liability, and provide a UEI number for FFATA reporting on contracts valued at $40,000 or more.
Inland Empire Job Corps

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 238160
New
SLED
ROOF MAINTENANCE SERVICES - IFB 27C580000
Solicitation # 27C580000
The Department of the California Highway Patrol is soliciting bids for annual roof maintenance and inspection services for the West Valley Area office in Los Angeles. The anticipated contract term runs from July 1, 2027, through June 30, 2030. The scope of work requires annual inspections between October and December, including debris removal from surfaces and gutters, interior and exterior structural assessments, surface analysis of flat roof membranes, and ponding assessments. Contractors must document all deficiencies using a specific checklist and provide photographs, submitting reports to the CHP Facilities Coordinator within three business days of inspection. The agreement will be awarded to the responsive and responsible bidder offering the lowest cost, with adjustments applied for Small Business or Micro Business preferences and Disabled Veteran Business Enterprise incentives. To be eligible, bidders must possess a valid California C-39 Roofing License, a local business license, and registration with the Department of Industrial Relations. Personnel are subject to security clearances and driver license checks. Bids must be submitted as a single, sealed physical package containing all required certifications and signed forms by the November 19, 2026, deadline. Compliance with the Americans with Disabilities Act and California prevailing wage laws is mandatory.
Department of the California Highway Patrol

POSTED

about 20 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

Contract 36C25224C0050, awarded on September 13, 2024, by the Department of Veterans Affairs to Ameritech Contracting LLC, provides for the replacement of roofs at the William S. Middleton VA Hospital in Madison, Wisconsin. The total award amount is 1,187,483.00 dollars. This project, categorized under NAICS code 238160 and set aside for Service-Disabled Veteran-Owned Small Businesses, involves the removal and replacement of roofing materials down to the substrate and the replacement of all flashing in specified sections. Key technical requirements include the removal and reinstallation of lightning protection systems and electrical components by certified individuals, as well as the installation of specific walk mats on various roof areas. The contractor is responsible for preparing staging and walkway layouts for VA approval. Operational constraints require that crane activities be limited to Saturdays, Sundays, and federal holidays, with the crane boom lowered nightly to avoid interfering with flight operations. The project timeline allows for work to extend into the following spring, as completion is not required during the upcoming winter.

General Info

Contract Value

$1,187,483

NAICS

238160 - Roofing Contractors

Place of Performance

WI, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

Award 36C25224C0050 - Replace roofing 607-22-106

DOCX, Low priority3 pages · award
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
John MeyersContracting Officer

Full Description

Show more
Accompanying Amendment 36C25224B0009 0001 Accompanying Amendment 36C25224B0009 - 0001 Replace Roofs William S. Middleton VA Hospital, Madison, WI I. bid opening information: the bid opening date remains changed at 13 august 2024. a. VIRTUAL BID OPENING INFORMATION: 1) Reminder, there will be no in-person public bid opening process this will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number; Join the meeting now (Meeting will be available to be accessed 15 min prior to bid opening) Meeting number (access code): 872-701-0185 Conference ID: 434540725# 3) IAW FAR 52.214-5 Submission of Bids and 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at john.meyers2@va.gov as follows; Vendor bids are due via email as shown above at 12:00 PM local time on 8/13/2024. The virtual public bid opening will be held at 1:00 PM local time on 8/13/2024 at the link and/or the phone # provided above. A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999). 4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer. 5) It is highly recommended that Bidders submit their bid at least one hour prior to bid opening to avoid any transmission issues. II. The following changes are made to the Drawings: The following changes/clarifications are made to the notes on the drawing; 2. Section B: 2.6. Remove and replace all material down to substrate as well as replace all flashing in the area. 4. Section D: 4.6. Replace all flashing. Remove and replace all material down to substrate. III. The following Questions and Answers / Clarifications are the result of bidders request(s) for information: Q1. Can the VA provide a staging plan for all roofs to include hours and requirements listed? A1. Staging plan would be the contractor s responsibility to prepare and submit for VA review and approval. Q2. What is the plan for lightning protection? Not in specs but exists on roofs. A2. Contractor is responsible for removal and reinstallation of lightning protection system. Removal and reinstallation required to be performed by a certified individual. Q3. Walkway for fully adhered roofs come 30 wide and that is what is specified, would this be sufficient for all walkways? In lieu of 2 and 4 ? A3. 30 is appropriate for 2 . Where 4 is required two 30 side by side is appropriate. Q4. Does the infrared moisture survey apply to this project? A4. Not required, not applicable. All insulation should be replaced. ROOF A: Q5. Confirm reuse of all metal flashings (counterflashing/coping), install new only where damaged. A5. Yes, reuse all undamaged metal flashings, install new only where damaged. Reinstalled flashing deemed to be damaged by VA to be replaced at contractor s expense. ROOF B: Q6. Can VA provide layout of where the walkway is to be installed? A6. 4 (or two 30 side by side) wide walk mats to be installed from access door out to and around air handler and exhaust fan. Contractor would be responsible to submit walkway layout for VA review and approval. Q7. Please define replace all flashing areas with a layout to verify roofing scope? A7. Replace all flashing including copper flashing at parapet. Flashing should extend over top of parapet and include top cap. Railing to be removed and reinstalled to facilitate replacement of parapet flashing. Refer to main drawing G000 to verify roofing scope. Q8. What is the type of coating on this roof? A8. Roof coating to be field verified by contractor. ROOF C: Q9. Please provide 2 walkway layouts for this roof? A9. Provide 4 (or two 30 side by side) walk mats from access ladder to the air handlers. Provide 2 wide walk mats around all roof mounted exhaust fans and chillers and connecting to the main walk mats. Contractor would be responsible to submit walkway layout for VA review and approval. Q10: Confirm reuse of all metal flashings (counterflashing/coping), install new only where damaged? A10. Yes, reuse all undamaged metal flashings, install new only where damaged. Reinstalled flashing deemed to be damaged by VA to be replaced at contractor s expense. ROOF D: Q11. Please define replace all flashing areas with a layout to verify roofing scope? Does flashing refer to the roof edge? A11. Refer to main drawing G000 for roofing scope. Replace ALL flashing. Yes, flashing refers to roof edge. Q12. Can this roof take fastener penetration with it being high voltage (is there any safety issues)? A12. Specs call for a fully adhered system. Q13. Can all work be completed during normal (0700-1530) daytime shifts? A13. Crane operation will need to be coordinated and is restricted to Saturdays, Sundays, and federal holidays. Q14. Can the Site Superintendent fulfill the duties of the SSHO as well? A14. Yes Q15. What is the anticipated award date for this project? A15. Contract award will not be delayed after bid opening and is anticipated within approximately 2-3 weeks from opening. Q16. When is the Notice to Proceed anticipated to be issued? A16. Notice to proceed will be scheduled based on award date and is not expected to be delayed. Q17. When is the anticipated Start of Construction for this project? Will this project need to be completed during the upcoming winter? A17. Start of construction will be dependent on submission/approval of contractor s submittals. No, this project will not need to be completed during the upcoming winter. The VA anticipates some roofs to begin replacement next spring. Q18. In section 01 00 00 1.11.C, referring to delivering two electronic copies of complete As-Builts after each completed phase. Does this also apply to shop drawings? If electronic, does the VA require two? A18. Provide electronic and one hard copy. Q19. What does (how many) the VA require for hard copies of the completed O&M? Do the manuals require delivery when the equipment arrives or at substantial completion? Q19. At completion of the job two (2) hard copies and one (1) electronic copy is sufficient. Q20. Specification Section 01 33 23, Will submittal exchange be used for this project and who is responsible for the cost of submittal exchange? A20. VA intends to pursue purchasing Submittal Exchange for this project, at cost to the government. Q21. Is a submittal log/register required for submission by the contractor for this project? Reference 01 33 23 1.3C, the VA provides the initial register. A21. Contractor shall develop and maintain submittal register for the project. VA anticipates procuring submittal exchange for use on this project. Q22. Reference 01 35 26.1.13, is Tuberculosis Screening required on this project? Can the Department of Health Services Wisconsin risk assessment TB questionnaire satisfy this requirement for this project? A22. TB screening is not required. Q23. Will crane picks for the rigging of equipment and materials be restricted to federal holidays and weekends? A23. Yes. See question 13. Q24. Is there an area planned for the use of a crane to set up for the sections of roof? The crane size is TBD but will need areas to set up at each area for use during the work. A24. Areas for crane set up to be submitted by contractor for VA review and approval. Q25. Will the crane need to be lowered to the ground nightly to not interfere with Flight for Life This will require space for the boom. A25. Yes. Information will be provided to the contractor after award concerning flight operations. Q26. Please confirm there are no new steel steps, ladders or railings required for this roof work project. A26. Confirmed, there are no new steel steps, ladders or railings required for this roof work project. Q27. There are a number of lightning protection systems installed on various roofs. These will need to be removed, reworked and or altered to complete the work. What is the required scope for this work? Will the system need to be recertified after the work? Who is responsible for this certification? A27. See question 2. Q28. Who is responsible for the design of the lightning protection system? Can drawings and a clear defined scope be provided for bidding? A28. See question 2. Q29. What electrical requirements should be included as there are no electrical drawings for removal and replacement of conduits, boxes, and devices that are attached to parapets, structures, and walls throughout the area. A29. Electrical conduits, boxes and devices shall be removed, retained, and reinstalled by a certified individual. Q30. Area B was noted as replacing the flashings as required. Does this include the Parapet flashing that appears to wrap up the parapet wall and terminate on the top of the existing stone cap. Can a new detail for the flashing required be provided? A30. Area B requires ALL flashing to be replaced including parapet flashing. See Answer 7. Q31. At area B there is a HM Door and frame that leave the building to enter the roof area. How is the contractor to flash this existing opening? Please provide a detail. Should the door and frame be removed/ replaced to flash the roof? A31. Door and frame to be removed, modified, or replaced as needed to accommodate installation of new insulation, roofing material and flashing. VI. general information: Pre-Bid/Site Visit attendance attached There are no further changes.

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 561710
New
Federal
F105--Integrated Pest Control Services for the Oscar G Johnson VA Hospital located in Iron Mountain MI
Solicitation # 36C25227Q0064
The Department of Veterans Affairs, through the Great Lakes Acquisition Center (NCO 12), has issued a Sources Sought Notice for market research purposes to identify qualified sources capable of providing integrated pest control services for the Oscar G Johnson VA Hospital in Iron Mountain, Michigan. The potential contractor will be responsible for providing all necessary management, tools, floor mats, supplies, equipment, transportation, and labor. This notice is not a formal solicitation or request for proposal, but the information gathered will help the government determine the appropriate acquisition methodology. Interested parties must submit a capabilities statement and a summary of past experience with similar projects, not exceeding 10 pages, in MS Word or PDF format by November 2nd at 8:00 a.m. Central. Submissions must include the organization's name, address, point of contact, SAM UEI number, business size, socio-economic status, and GSA contract number. For SDVOSB and VOSB contractors, a signed certification of compliance regarding limitations on subcontracting is mandatory; specifically, the contractor must certify that they will not pay more than 50 percent of the government contract value to firms that are not VIP-listed SDVOSBs or VOSBs. Failure to provide this certification will result in the response being deemed ineligible for evaluation.
Exterminating and Pest Control Services

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 561621
New
Federal
J042--Fire Alarm System Monitoring and Programming INTENT TO SOLE SOURCE
Solicitation # 36C25227Q0062
The Department of Veterans Affairs, through the Great Lakes Acquisition Center, intends to award a sole source, firm fixed price contract to Johnson Controls Fire Protection for fire and smoke alarm testing and fire suppression system services at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The contract consists of a one year base period with four optional one year extensions. The scope of work requires 24/7/365 monitoring of all fire systems across various medical, long term care, and general buildings, as well as two scheduled technician visits per month on the second and last Thursdays. All services must comply with National Fire Protection Association codes, The Joint Commission standards, OSHA, VA standards, and ISO 9000. To execute these services, the contractor must provide personnel certified in Simplex Grinnell systems and technicians with a minimum NICET Level II certification. The monitoring service must be UL 827 or FM-approved. Key administrative requirements include the appointment of a dedicated contract manager, adherence to specific check-in and check-out procedures at Building 188, and the procurement of facility identification badges. Invoicing is required on a monthly basis, with separate detailed billing for monitoring and labor services. While this is a notice of intent to sole source under 41 U.S.C. 1901, other firms may submit capability statements and references via email to the contracting officer by October 28, 2026, for evaluation.
Security Systems Services (except Locksmiths)

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
Federal
Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
Solicitation # 36C25227B0001
Solicitation 36C25227B0001 is a sealed bidding construction project for the Department of Veterans Affairs to replace Boilers 4 and 5 at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. Located in Building 112 Powerhouse, the project involves the demolition and removal of existing boilers and their associated electro-mechanical infrastructure, followed by the installation of one new firetube boiler. The base bid covers the full replacement of both units, while a deduct alternate allows for the removal of only Boiler 5, retaining Boiler 4 as a backup. The estimated project magnitude is between 2 million and 5 million dollars, with a total performance period of 455 calendar days divided into a 90-day pre-construction phase and a 275-day construction phase. This procurement is a 100 percent set-aside for CVE verified Service-Disabled Veteran-Owned Small Businesses under NAICS 238220. Eligible bidders must provide a bid bond and certify compliance with VAAR 852.219-75, which limits payments to non-VIP-listed SDVOSBs or VOSBs to 85 percent of the government payment. The contract is subject to the Davis-Bacon Act and Buy American requirements. Key technical requirements include the use of specific boiler controls from the Whesco Group and Fireye Nexus for system compatibility, strict adherence to equipment labeling and packaging standards, and the submission of monthly invoices using AIA forms G702/G703. Awarded contractors must also provide performance and payment bonds equal to the full contract value.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS