Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on February 10, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--554-22-138 Reconfigure Gas Lines for Pulmonary F2

Closed
36C25922Q0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes site preparation, structural modifications such as saw cutting reinforced concrete walls, and the installation of an ADA-accessible route featuring ramps, landings, and handrails. The contractor is responsible for all permitting, structural engineering, weatherproofing, and ensuring that interior and exterior finishes match the existing clubhouse architecture. Project acceptance is contingent upon successful inspections by the Authority Having Jurisdiction and final approval by Colville Fuels. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements per Colville Tribal Code Chapter 10-3. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Required insurance includes Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation. Bids are due by November 20, 2026, with a targeted contract award date of December 4, 2026, and a weather-dependent completion goal of March 31.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in about 1 month

General Info

Contract Value

$53,649

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

23

Amendment 0001 to Solicitation 36C25922Q0010

DOCX, High priority: read this firstamendment
High

Amendment 0002 to Solicitation 36C25922Q0010

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0003 to Solicitation 36C25922Q0010

DOCX, High priority: read this firstamendment
High

Amendment 0004 to Solicitation 36C25922Q0010

DOCX, High priority: read this first1 page · amendment
High

Amendment 0005 to Solicitation 36C25922Q0010

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0006 to Solicitation 36C25922Q0010

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0007 to Solicitation 36C25922Q0010

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0008 to Solicitation 36C25922Q0010

DOCX, High priority: read this first3 pages · amendment
High

Drawing and Photos - Bulk Oxygen Lines

PDF, High priority: read this first4 pages · specifications
High

Painting Specification Section 09 91 00

DOCX, High priority: read this first14 pages · sow
High

Section 01 00 00 General Requirements - Reconfigure Gas Lines for Pulmonary F2

DOCX, High priority: read this firstspecifications
High

Section 01 33 23 - Shop Drawings, Product Data, and Samples

DOCX, High priority: read this first3 pages · specifications
High

Section 01 35 26 Safety Requirements

DOCX, High priority: read this first23 pages · sow
High

Section 01 42 19 - Reference Standards

DOCX, High priority: read this first6 pages · specifications
High

Section 01 45 00 Quality Control

DOCX, High priority: read this first11 pages · specifications
High

Section 09 29 00 - Gypsum Board

DOCX, High priority: read this first6 pages · specifications
High

Section 22 05 11 Common Work Results for Plumbing

DOCX, High priority: read this first19 pages · specifications
High

Section 22 62 00 - Vacuum Systems for Laboratory and Healthcare Facilities

DOCX, High priority: read this first15 pages · specifications
High

Section 22 63 00 - Gas Systems for Laboratory and Healthcare Facilities

DOCX, High priority: read this first15 pages · specifications
High

Solicitation 36C25922Q0010 - Reconfigure Gas Lines for Pulmonary F2

DOCX, High priority: read this first52 pages · rfp
High

SOW – Reconfigure Gas Lines for Pulmonary F2

DOCX, High priority: read this first5 pages · sow
High

Site Visit Attendance 220120

DOCX, Low priority1 page · other
Low

Site+Visit+Attendance+220207.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Set-aside added: Service-Disabled Veteran-Owned Small Business Set Aside. The point of contact changed.

Notice updated

Response deadline changed from Jan 14, 2022 to Jan 27, 2022. Set-aside removed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jan 27, 2022 to Feb 3, 2022. The notice description changed.

Notice updated

NAICS code changed from 238220 to 236220.

Notice updated

Response deadline changed from Feb 3, 2022 to Feb 11, 2022. The notice description changed.

Notice updated

Set-aside added: Service-Disabled Veteran-Owned Small Business Set Aside.

Notice updated

Set-aside removed.

Notice updated

The notice description changed. The point of contact changed.

Deadline changed

Response deadline changed from Feb 11, 2022 to Feb 18, 2022.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Joseph (Joe) N Wingfield (COContract Officer

Full Description

Show more
Questions and Answers for Reconfigure Gas Lines for Pulmonary F2 What is the ICRA level for each location to add Med Gas Lines? Assume Class III in rooms on 2rd floor. In the interstitial, dust mats will be required at entry ways to prevent tracking dust out. The specifications call out to have a separate Superintendent, QC and Safety Officer on site full time. Can this requirement be waved so that the superintendent can perform all three of these duties? Yes, these duties can be performed by the same person. The Revised SOW calls out adding seven outlets and the room numbers. Please provide a floor plan showing the location of the new DLCO gas outlets and the location the DLCO gas line is coming from. The project drawing in is correct. The number of outlets in the text of the original SOW was not correct. There are three existing outlets in F2-232 which must be replaced with the custom DLCO outlets. There are two new DLCO outlets in F2-236. There are two new DLCO outlets in F2-238. This makes a total of seven outlets in the project. See blue line on project drawing. Will the contractor be able to work on each of the seven locations at the same time or will the work need to be phased? If phasing is required, please provide a phasing schedule/what areas can be worked on simultaneously. All work affecting patient areas will need to be performed on weekends when patients are not present. If work is not completed during a weekend, the dust containment will have to be removed where it restricts operations. How many locations for the new MED Gas lines will require drywall patch and repair? Nine. The seven DLCO location plus the two oxygen locations. Please confirm the rooms where the DLCO lines tie into these lines can be dropped out of the ceiling and tied into the bottles and not drywall patch is required at these locations. The requirement is to create seven locations with wall outlets for DLCO that utilize the DISS 1020 connection. The DLCO cylinders in F2-209 serve three existing outlets in F2-232 but these outlets must be replaced with a different type to incorporate the DISS 1020 fittings. - Since this is not a standard connection type for a wall outlet and demand check style fittings of this type do not exist, a custom wall plate with integral shutoff valve must be created. Drywall patching will be required to connect these custom wall plates to the existing drops in F2-232. The four new DLCO drops in rooms F2-236 and F2-238 will be fed from the cylinders in F2-209 via the existing distribution in the interstitial. Core drilling and drywall work will be required for the new DLCO drops. What is the shutdown requirements for tying into the Bulk Oxygen system? - Are there existing isolation valves or do we have to shut down the hole system? If the entire bulk oxygen system needs to be shut down will the VA provides an alternate source of oxygen to the hospital? The bulk oxygen will be isolated at the Medical Gas Zone box shown on 03.PP.102-A. This zone serves only the sleep lab and pulmonary. No, other areas will be affected. The tie-in will need to be scheduled for a weekend when neither area is in use. Can the work be performed during normal business hours? If not, what portion of work will need to be completed after hours? - Core drilling and tie-ins to oxygen and DLCO will need to be scheduled for weekends when neither the sleep lab or pulmonary are in use. Interstitial work with the exception of tie-ins and core drilling can be performed during normal working hours. Work inside the rooms on 2nd floor will need to be performed on weekends when patients are not present.

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS