Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on September 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--660-24-090 Emergency Demo Flooding Building 1 | (VA-24-00108043) - 660C43298

Awarded
36C25924C0135Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of Veterans Affairs, Network Contract Office 19, has issued a sole source, firm-fixed-price contract to MSC Design Build LLC for emergency demolition and disposal services at the George E. Wahlen Medical Center. This action, identified by Acquisition ID 36C250-24-090 and valued at 749,252.99 dollars, is necessary due to a 1.5 inch water line break on the sixth floor of Building 1. The damage spans floors 1 through 6, including the ground floor and zones A, B, and C, requiring immediate intervention to ensure patient and staff safety and to mitigate infection control risks such as mold. The contract was awarded under the statutory authority for unusual and compelling urgency, as the immediate need to address flooding made standard solicitation impractical. MSC Design Build LLC was selected based on their extensive experience at the facility and their ability to mobilize immediately. The estimated period of performance is between 60 and 120 days. While the demolition is being handled via a sole source agreement, the subsequent repair and renovation of the affected spaces will be solicited as a set-aside for Service-Disabled Veteran-Owned Small Businesses through the VISN 19 Construction MATOC.

General Info

Contract Value

$1,125,553.96

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

1

J&A - Emergency Demo Flooding Building 1 (36C25924C0135)

DOCX, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Justification (J&A)

Justification (J&A)

Justification & Approval published

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Ilze Karklins-PowersContracting Officer

Full Description

Show more
Request for Sole Source Justification Format >SAT VHAPG Part 806.3 OFOC Page 1 of 4 Revision: 03 Effective Date: 04/15/24 Acquisition ID#: 36C250-24-AP-5400 DEPARTMENT OF VETERANS AFFAIRS Justification and Approval (J&A) For Other Than Full and Open Competition (>SAT) Acquisition Plan Action ID: 36C259-24-AP-5400 Tracking #: FY24-NCO-19-2776 Contracting Activity: Department of Veterans Affairs, NCO 19 located at 6162 South Willow, Suite 300, Greenwood Village, CO 80111 on behalf of VISN 19, George E. Wahlen Medical Center located at 500 Foothill Drive, Salt Lake City, UT 84148. 2237 #: pending Nature and/or Description of the Action Being Processed: This requirement is for the emergent demolition of multiple areas with in Building 1 to include floors 1-6, ground floor and zones A, B and C due to a 1.5 water line break on the 6th floor of the building which has caused considerable damage to the area. The contractor will provide demolition and disposal of specified areas within the floors and zones which been damaged by water. This requirement will be a sole source firm-fixed-price contract. The HCA was notified of the emergency and provided approval for the action to move forward on August 27, 2024. The estimate cost of this requirement is $749,252.99. Description of Supplies/Services Required to Meet the Agency s Needs: The project requires construction services to demolish and remove the specified areas of Building 1 which have been affected by the damage of the water line break. The estimated period of performance is between 60 and 120 days. Statutory Authority Permitting Other than Full and Open Competition: ( ) (1) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per 41 USC §3304(a)(1) as implemented by FAR 6.302-1; ( X ) (2) Unusual and Compelling Urgency per 41 USC §3304(a)(2) as implemented by FAR 6.302-2; ( ) (3) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert Services per 41 USC §3304(a)(3) as implemented by FAR 6.302-3; ( ) (4) International Agreement per 41 USC §3304(a)(4) as implemented by FAR 6.302-4 ( ) (5) Authorized or Required by Statute per 41 USC §3304(a)(5) as implemented by FAR 6.302-5; ( ) (6) National Security per 41 USC §3304(a)(6) as implemented by FAR 6.302-6; ( ) (7) Public Interest per 41 USC §3304(a)(7) as implemented by FAR 6.302-7; Demonstration that the Contractor s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): The contractor, MSC Design Build is uniquely qualified for this project. MSC Design has years of experience working at the George E. Wahlen facility, is familiar with the location of the work and has provided construction services in similar situations with water main/line breaks at the facility. The contractor is ready to mobilize immediately. The contractor is active in SAM.gov and VetCert. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: For this emergent requirement, it was not practical to solicit the requirement. Immediate action was required for patient and staff safety as water was flooding the area. MSC Design Build was contacted based on previous experience and knowledge of the contractor s capabilities for a project of this size and magnitude. Determination by the CO that the Anticipated Cost to the Government will be Fair and Reasonable: The anticipated cost to the government has been an ongoing discussion with the contractor to determine what needs to be done immediately versus what can be done at a later time. This project will cover the demolition of the affected area to ensure mold and other contaminants are not actively remaining in the affected area. Based on discussions with the contractor, facility and management, the cost to the government for this requirement is determined to be fair and reasonable. Description of the Market Research Conducted and the Results, or a Statement of the Reasons Market Research Was Not Conducted: The following market research has been completed and is included in the eCMs briefcase Verification of MSC Design Build LLC in VetCert. Expiration 1/30/2028 Verification of MSC Design Build LLC in SAM. Expiration 2/19/2025 Any Other Facts Supporting the Use of Other than Full and Open Competition: Demolition for this emergent requirement is necessary to mitigate any infection control concerns based on the water damage. Patients have been moved from affected areas and the hospital is now more limited with the inpatient services they can provide for our veterans. Sole sourcing the requirement will cut down on the time it takes to get the hospital back to full service capacity and will allow contracting time to solicit through the VISN 19 Construction MATOC for construction services to repair/renovate the damaged space. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: NA A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: The demolition aspect of this emergent project is being sole sourced. While the demolition requirement is worked, a solicitation for the repairs/renovation of the affected areas will be solicited as a set aside for SDVOSBs through the VISN 19 Construction MATOC. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief. /s/ Jeremiah Percy 9/23/2024 _____________________________ ________________________ Name: Jeremiah Percy Date Title: Lead Maintenance Carpenter Facility: George E. Wahlen VAMC Approvals in accordance with the VHAPM Part 806.3 OFOC SOP: Contracting Officer Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief. /s/ Ilze Karklins-Powers 9/23/2024 _____________________________ ________________________ Name: Ilze Karklins-Powers Date Title: Contract Specialist Facility: NCO 19 Construction Team 1 One Level Above the Contracting Officer (Required over SAT but not exceeding $750K): I certify the justification meets requirements for other than full and open competition. /s/ Donna Gillette 9/23/2024 _____________________________ ________________________ Name: Donna Gillette Date NCO 19 Supervisory Contract Specialist Facility: NCO 19 Construction Team 1

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS