Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on October 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z2DA--SL 554 Irrigation and Concrete Repair

Closed
36C25924Q0823Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
2026036-BID3289 ROADS AND BRIDGES ADMINISTRATION BUILDING RENOVATION
Solicitation # 2026036-BID3289
The Columbia County Board of Commissioners is soliciting bids for the renovation of the Columbia County Roads and Bridges Administration Building located in Appling, Georgia. The project aims to improve the facility's functionality and condition through the renovation of office, support, and common areas. The scope of work includes selective demolition, the installation of new finishes, and necessary modifications to mechanical, electrical, and plumbing systems to accommodate a new building layout. This is a lump sum contract requiring bidders to hold both a State of Georgia General Contractor's License and a Columbia County business license. A critical requirement for eligibility is attendance at the mandatory on-site pre-bid meeting on November 4, 2026, at 10:00 AM; failure to attend or arriving more than ten minutes late will result in automatic disqualification. Bids must be submitted electronically via the Bonfire portal by November 19, 2026, at 12:00 PM. Proposals must include a bid bond of at least five percent of the lump sum bid. Upon award, the successful contractor must provide performance and payment bonds equal to one hundred percent of the contract amount within ten days. The procurement process is managed by the Columbia County Procurement Department, with Glenn O'Steen serving as the Procurement Manager.
Columbia County Board of Commissioners

POSTED

about 8 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The contract involves comprehensive irrigation and concrete repair services at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado, with a performance period of 30 days from the notice to proceed. Key tasks include repairing a section of the irrigation main pipe near Zone 45 at the Colfax Entrance, which requires excavation to access the water supply pipe, and addressing leaks along the irrigation line in Zone 75. The contractor is responsible for safely excavating, assessing damage, replacing damaged parts, and restoring the area with proper safety measures in accordance with OSHA standards, including shoring and protective equipment. Additionally, the project entails repairing two sections of deteriorated concrete sidewalks near the Colfax and North Entrance Pedestrian Gates, ensuring safety and durability while minimizing disruption to pedestrian traffic. The scope also covers site preparation, traffic control, and coordination with VA personnel, including securing permits, providing qualified personnel with OSHA 10-hour certification, and maintaining safety and environmental compliance throughout the work. The contractor must manage all logistics, including material storage, waste disposal, and ensuring minimal interference with hospital operations. Work hours are generally from 7:00 am to 4:00 pm, with Saturday and Sunday work permitted at the same price. The contractor is responsible for obtaining all necessary licenses, permits, and insurance before starting work and must ensure all personnel are identifiable and adhere to VA regulations regarding safety, conduct, and security. The project emphasizes safety, environmental responsibility, and quality control, with the contractor required to provide warranties for completed repairs and submit detailed reports and documentation upon completion.

General Info

Irrigation and concrete repair at Rocky Mountain VA Medical Center; includes excavation and safety compliance.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

CO

Set-Aside

NONE

Documents

11

36C25924Q0823 - Irrigation and Concrete Repairs

DOCX, High priority: read this first61 pages · rfq
High

VA Notice of Limitations on Subcontracting - Certificate of Compliance (852.219-75)

DOCX, High priority: read this first2 pages · certification
High

36C25924Q0823 Past Performance Questionnaire - Irrigation and Concrete Repairs

DOCX, Low prioritypast-performance
Low

Concrete Repairs Map

PDF, Low priority1 page · other
Low

Photo+10_Chapel+North.jpg

JPG

Photo+11_North+Entry+Walkway.jpg

JPG

Photo+12_North+Entry+Curb+and+Sidewalk.jpg

JPG

Photo+13_17th+and+Wheeling_1.jpg

JPG

Photo+14_17th+and+Wheeling_2.jpg

JPG

Photo+15_17th+and+Wheeling+N.jpg

JPG

Photo+1_S-R+Driveway.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Nov 7, 2024 to Nov 25, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 19 (36C259)
Contacts1 person available
OfficeGreenwood Village, CO, 80111, USA
Office AddressGreenwood Village, CO, 80111, USA
Contacts
Christopher D Wentworth (ContractorContract Specialist

Full Description

Show more
STATEMENT OF WORK Irrigation Repair/Concrete Repair Rocky Mountain Regional VA Medical Center GENERAL INFORMATION Title of Project: Irrigation Main Pipe Repair at Zone 45 and irrigation line at Zone 75. Concrete Repairs near Colfax Entrance and at North Entrance Pedestrian Gate. A) Background: There is a section of Irrigation Main Pipe that needs to be repaired and a long section of Irrigation Pipe that needs repaired, both to ensure the grass is watered and that the grounds maintain their structural integrity. A section of the irrigation Main Pipe, (near Zone 45 at the Colfax Entrance between the sidewalk and street) needs to be repaired. To repair this section, it is necessary to excavate 6 -8 deep to access the Main Water Supply Pipe. There are several leaks along the Irrigation Line in Zone 75 that also need to be located and repaired. Per OSHA requirements, any excavation more than 4 must utilize shoring or an engineered Trench Box . This excavation requirement is beyond our current capabilities. To provide the best possible safety and repairs in the timeframe, it is recommended that we utilize a contractor for this work. A) Scope of Work: The contractor shall provide all personnel, supervision, professional expertise, vehicles, tools, materials, services, equipment, and quality control to the irrigation main at the Rocky Mountain Region VA Medical Center (RMRVAMC). Vendor will work with the COR or POC to turn off the gate valves to the main line and release any residual pressure if applicable, (Irrigation System may be empty at the time of repairs). Vendor will remove grass from each area to access the pipe and assess the damage. Grass that is removed will be kept and re-placed upon completion of repair. Vendor will remove dirt to expose Irrigation Main Pipe at Zone 45 and to the Irrigation Line at Zone 75. Care will be taken to avoid electrical and signal lines. Vendor will provide adequate room for repairs to Irrigation Main Pipe and/or Irrigation Line replacement. Vendor is responsible for providing all proper safety equipment, (shoring, mechanical restraints, etc.) for working at the depth of the work area. All work and safety precautions must be in accordance with OSHA requirements. Vendor will assess damage to Irrigation Main Pipe and/or Irrigation Line and determine parts and size for replacement. Vendor will replace all parts associated with the water leak at the Irrigation Main Pipe and Irrigation Line in each respective area. Vendor to provide a picture of completed repairs for reference and a one-year warrantee for all repairs accomplished. Vendor will return and compact dirt to all uncovered areas to properly cover irrigation system and return grass to cover dirt. B) Background: There are two sections of Concrete Sidewalk that needs to be repaired, one near the Colfax Entrance and one at the North Entrance Pedestrian Gate. Both sidewalk sections pose a slip/trip hazard in their current state and should be repaired as soon as possible. B) Scope of Work: The contractor shall provide all personnel, supervision, professional expertise, vehicles, tools, materials, services, equipment, and quality control for the Concrete Repairs at the Rocky Mountain Regional VA Medical Center (RMRVAMC). Vendor will block off area for repairs and divert pedestrian traffic safely around the sidewalk repair area. Vendor will cut the sidewalk in such a way that the replacement is designed for safety and durability. Care will be taken to avoid irrigation, electrical, and signal lines. Vendor will build a form for the replacement concrete to ensure that it matches the existing sidewalk and maintains the depth and construction methods of existing. Vendor is responsible for providing all proper safety equipment, (shoring, mechanical restraints, etc.) for the work area and for pedestrian traffic. All work and safety precautions must be in accordance with OSHA requirements. Vendor will provide, place, and finish new concrete in the prepared area, taking care to match existing as close as possible. Vendor will maintain the pedestrian traffic safety and barricade area until the concrete is set to a point that it is no longer a safety or damage concern. Vendor will remove forms, blocking, shoring etc. and all construction materials. Vendor will return dirt and grass to the edges of the sidewalk. Period of Performance: 30 consecutive calendar days from Notice to Proceed (NTP). Place of Performance: Rocky Mountain Regional VA Medical Center (ECHCS) at 1700 N. Wheeling St., Aurora, CO 80045. Access to the campus will be coordinated with COR. Contractor must check in with the Police first (720-857-5800) and follow COVID-19 precautions along with hospital requirements for ICRA and ILSM. Responsibilities of the Contractor Contractor to provide, and review with the COR, actual work, warrantees and daily reports, close-out meeting, provide invoices, always provide a supervisor while onsite. All staff require at least an OSHA 10-hour certification. Contractor is responsible for submitting a schedule and safety plan for review and approval prior to performing work. The Contractor shall be responsible to ensure all work shall be done in a manner that safeguards all VA visitors, employees, and public. The Contractor shall be solely responsible for all actions initiated and/or completed by his/her employees. Furthermore, the contractor and his/her employees shall have a clear understanding of, and be sensitive to, environmental issues, and be consistent and fully compliant with all applicable Federal, State, County and City laws, ordinances, Right-to-Know laws, EPA guidelines, and regulations. Matters related to safety, and any actions of the Contractor shall meet all safety requirements, Department of Veterans Affairs, OSHA, and the State. It is incumbent upon the Contractor to be familiar with these requirements. All hazardous materials shall be handled, stored, used, and disposed of in accordance with applicable NFPA, OSHA, and EPA standards appropriate for each material. Current Material Safety Data Sheets will be kept on hand for all materials. Adequate warning devices, barricades, or other necessary precautions shall be provided by the Contractor at all work sites to eliminate hazards and for the protection, safety, and warning of all public visitors, pedestrians, and vehicular traffic within the area. Spill Prevention, Containment, and Clean-up: The Contractor shall contain, clean up, and report all spills on Government property in a manner that complies with all applicable Federal, State, and Local laws and regulations or otherwise stated herein, and the installation spill control plan at no cost to the Government. Government s Responsibilities Upon request by interested parties, a site visit at RMRVAMC will be made available prior to the proposal due date. Notification of Non-Compliance: The COR will notify the Contractor of any detected non-compliance with the requirements. The Contractor shall take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order ceasing all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such cessation direction shall be made the subject of claim for extension of time for excess costs or damages by the Contractor. The VA shall provide, to the contractor s authorized personnel, adequate working space during the periods which the contractor has scheduled with the VAMC to perform service. Operations and Storage Areas Working space and space available for storing materials will only be available at the approval of the COR or Contracting Officer. If approved, the location is to be where approved by the COR or where shown on drawings as the Contractor Staging Area . It is understood the VA will not be held responsible for any damage to the Contractor s equipment, materials, supplies or the like which may result from vandalism, theft etc. while on site. Contractor shall base operations out of this staging area, using it for materials and equipment storage, administration, employee parking, employee lunch/break area, etc. Contractor is responsible for disposal of their construction plans and waste. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR or Contracting Officer. Do not store materials and equipment in other than approved areas. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. The Contractor shall, under regulations prescribed by the Contracting Officer or COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR or Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. Execute work in such a manner as to interfere as little as possible with work being done by others. To minimize grounds maintenance activity interference with flow of Medical Center traffic, keep roads, walks and entrances to grounds, parking and occupied areas of buildings clear of materials, debris and standing equipment/vehicles at all times. At least one lane must be always open to traffic. Coordination of work with COR or authorized designee: The Contractor shall cooperate and coordinate with the COR or authorized designee, in arranging schedule to cause the least possible interference with Medical Center activities. EMPLOYEE REQUIREMENTS The Contractor shall be responsible to ensure Contractor employees providing work on this contract are fully trained and completely competent to perform the required work. Personal Protective Equipment (PPE): Contractors and their subcontractors of any tier are required to wear personal protective equipment (PPE) in accordance with OSHA Act, 1971 and other Federal, State and Local regulations. Personnel observed in violation of these regulations may be subject to removal from the medical center. The Government assumes no responsibility for injury of contract personnel or subcontractors of any tier if the injury is a direct result of noncompliance or disregard for these regulations. Labor Force and Equipment: Contractor shall be responsible to provide all labor and equipment as necessary to meet deadlines. The Contractor will provide all necessary resources to complete the efforts assigned under the scope of this contract. Employee Listing: The Contractor shall maintain and provide the COR a current list of all employees on site including subcontractor personnel. The list shall include the employee s name, job title, and driver s license number. Employee Identification: The Contractor's employees shall always wear visible identification while on the premises of the Medical Center. This could be in the form of a company shirt which displays the company name and/or logo or by some other means suitable to this type of work. Contractor personnel shall park only in the COR approved area identified for this project. Workers are not allowed to park throughout the Medical Center. The Contractor shall be responsible to ensure that his/her employees (including contractor s consultants, subcontractors, etc.) are aware of all the terms and conditions regarding their performance and conduct during the performance period of this contract. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation/summons answerable in the United States (Federal) District Court, or another appropriate agency/jurisdiction. PERMITS AND LICENSES The Contractor shall be responsible for obtaining all necessary and current licenses, permits, vehicular insurance and registration, Workman s Compensatory Liability Insurance, property liability insurance etc., prior to the commencement of work. The contractor shall provide the Contracting Officer copies of these required documents with his/her proposal or at other times where the COR deems necessary during the duration of the project. HOURS OF WORK The normal hours of work shall take place between 7:00am and 4:00pm, Federal Holidays excluded. Saturday and Sunday work is acceptable provided the quoted price remains the same, (this acceptance is made in this case due to the nature of work and the diversion of pedestrian traffic will be made far easier and safer on a Saturday or Sunday).

More opportunities from Department Of Veterans Affairs → Network Contract Office 19 (36C259)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS