Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

VALLEY PUMP & MOTOR WORKS INC

UEI: N8TZNK2HZPM2CAGE: 44192

VALLEY PUMP & MOTOR WORKS INC is a federal contractor, registered under UEI N8TZNK2HZPM2 and CAGE code 44192. It has been awarded $783,922 in federal contracts. Primary work spans Water and Sewer Line and Related Structures Construction, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance, and Pump and Pumping Equipment Manufacturing. Top awarding agencies include Department Of Defense, Department Of The Interior (doi), and Other agencies (1 agencies, <0.5% each).

Contact Information

Registration and classification details

Registration

UEI Code

N8TZNK2HZPM2

CAGE Code

44192

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationSelf Certified Small Disadvantaged Business

NAICS Codes

221310Water Supply and Irrigation Systems(Primary)
237110Water and Sewer Line and Related Structures Construction
238210Electrical Contractors and Other Wiring Installation Contractors
238220Plumbing, Heating, and Air-Conditioning Contractors
333914Measuring, Dispensing, and Other Pumping Equipment Manufacturing
+2 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

VALLEY PUMP & MOTOR WORKS INC specializes in the design, installation, and maintenance of industrial pumping systems and motor-driven equipment for critical infrastructure applications. Their core capabilities center on fluid handling systems, including centrifugal and positive displacement pumps, e...

VALLEY PUMP & MOTOR WORKS INC specializes in the design, installation, and maintenance of industrial pumping systems and motor-driven equipment for critical infrastructure applications. Their core capabilities center on fluid handling systems, including centrifugal and positive displacement pumps, electric motor integration, control panel fabrication, and mechanical alignment services. The company provides engineered solutions for water distribution, wastewater conveyance, and industrial process fluid systems, with technical expertise in ANSI/HI standards, NEMA motor classifications, and ASME B31.3 piping codes. Key differentiators include on-site commissioning support, preventive maintenance planning, and retrofitting legacy systems to meet modern efficiency and reliability benchmarks. Their work emphasizes durability, regulatory compliance, and operational continuity in mission-critical environments. Award history does not provide sufficient detail to identify specific federal agencies or program relationships. Consequently, no verifiable agency experience can be confirmed based on available contract data. The contractor’s primary NAICS code, 221310, corresponds to Water and Sewer Line and Related Structures Construction, indicating a focus on civil infrastructure projects involving water transmission, pumping stations, and associated mechanical systems. In practice, this translates to work supporting municipal water utilities, regional water districts, and public works departments engaged in system upgrades, pipeline rehabilitation, and pump station modernization. The company’s market positioning aligns with contractors serving public water and wastewater infrastructure markets, particularly in regions with aging utility networks requiring mechanical system replacement or enhancement. VALLEY PUMP & MOTOR WORKS INC is a small business structured as a 2L entity, with no active government certifications on record. The company operates from its base in Yuba City, California, serving regional infrastructure needs across Northern California. Its geographic footprint is localized, with an emphasis on direct, hands-on service delivery rather than national-scale program support.

Key Performance Metrics

Awards Count

13

All time

Active

0

Currently performing

Completed

13

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with VALLEY PUMP & MOTOR WORKS INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for VALLEY PUMP & MOTOR WORKS INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in VALLEY PUMP & MOTOR WORKS INC's top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details