Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

125 S. San Marcos Road Contaminated Soil Excavation

Forecast
PTO 16542State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Barbara County Air Pollution Control District is overseeing the excavation, loading, and hauling of approximately 1,750 cubic yards of arsenic contaminated soil at the Tatum Property, located at 125 S. San Marcos Road and 4750 Hollister Avenue in Santa Barbara, California. This project, identified under solicitation number PTO 16542 and NAICS code 562910, is part of the Tatum Multifamily Housing Development Project. The scope of work requires all excavated soil to be removed via covered dump trucks and mandates that stockpiles be managed using continuous heavy-duty plastic sheeting or Soil-Sement binder to mitigate fugitive particulates and Reactive Organic Compound emissions. The project is governed by a Corrective Action Plan approved by the Environmental Health Services Site Mitigation Unit and must comply with all District rules and regulations to minimize air contaminant emissions. The County of Santa Barbara serves as the Lead Agency under CEQA, and the project has been granted a Notice of Exemption as a ministerial project. Administrative oversight is provided by the Santa Barbara County Air Pollution Control District, with key contacts including Carly Barham for CEQA matters and Zachary Akzin for engineering and permitting. A county documentary handling fee of 50.00 dollars is required for the associated filings.

General Info

Excavate and haul up to 1,750 cubic yards of arsenic-contaminated soil from Tatum Property with strict emission controls.

Agency

California → Santa Barbara County Air Pollution Control District

Place of Performance

Santa Barbara, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County Air Pollution Control District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Barbara County Air Pollution Control District
Office AddressN/A
Contacts
Carly BarhamAir Quality Specialist
Ron WuDirector, Development

Full Description

Show more
The project involves the excavating, loading, and hauling of up to approximately 1,750 cubic yards of arsenic contaminated soil located at what is commonly referred to as the "Tatum Property" (APN 065-040-026). Stockpiles will be covered with continuous heavy-duty plastic sheeting or treated with the soil binder "Soil-Sement" to reduce fugitive particulates and Reactive Organic Compound (ROC) emissions. The excavated soil will be removed from the site by covered dump trucks. The County of Santa Barbara is the Lead Agency under CEQA on the Tatum Multifamily Housing Development Project. Environmental Health Services (EHS) Site Mitigation Unit (SMU) has primary oversight authority with respect to soil investigation and cleanup located at the Tatum Property (site) and has approved the Corrective Action Plan which includes the excavation, handling, and disposal of arsenic contaminated soil. The District's permit action ensures that excavation activities authorized by EHS comply with all District rules and regulations and are performed in a manner that minimizes potential air contaminant emissions.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS