Venice High School Soil Garden Cleanup

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Venice High School Soil Garden Cleanup project, managed by the Los Angeles Unified School District, involves the excavation and disposal of arsenic and lead impacted soil from a 0.2-acre community garden area. The project aims to remove contaminants to levels below the DTSC background concentration, exporting the impacted soil to a State-permitted facility and importing clean soil to restore the site to its original grade and current use as a community garden. With an estimated cost of 308,775 dollars, the project is classified as a minor hazardous waste cleanup action and is exempt under CEQA Guidelines Section 15330. To ensure safety and regulatory compliance, the project will be implemented during the summer when students and staff are off campus. Operations must adhere to the Soil Excavation Plan and guidelines from the EPA, SCAQMD, OSHA/NIOSH, and the Regional Water Quality Control Board. Key safety measures include the use of personal protective equipment, engineering controls, security measures, and water sprays for dust suppression. The project must also comply with the December 2023 Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects and requires immediate notification to the Office of Environmental Health and Safety if any tree removal is necessary.

General Info

Excavate and remove arsenic-lead contaminated soil, restore site with clean soil, complete in summer under strict safety and regulatory protocols.

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Zulema RenteriaEnvironmental Planning Specialist

Full Description

Show more
The Project entails the implementation of a cleanup plan for arsenic and lead impacted soil following the environmental soil sampling that was conducted as part of the Comprehensive Modernization project at the Campus. The soil clean-up will include excavation and disposal of impacted soil in locations shown in Figure 1. The impacted soils could not be linked to current activities or structures at the school and are regarded as non-point source contaminants. A complete copy of the report for this investigation is included in the Soil Excavation Plan (SEP). This SEP was prepared to describe the procedure for removing the soil with elevated arsenic and lead concentrations to below the DTSC background concentration. The soil will be exported to a State-permitted disposal facility and clean soil will be imported to bring the site Project area back to original grade. Upon completion of clean-up activities, the site will be restored to its current use as a community garden. The SEP also identifies best management practices designed to limit potential short-term risks (e.g., the exposure of students, staff, community members, and onsite workers to chemical of concerns during soil excavation activities) through the proper use of institutional controls, such as engineering controls, security measures, personal protective equipment (PPE), and adherence to established health and safety procedures, including the application of water spray to suppress fugitive dust emissions during the excavation, the proper handling, transportation and disposal of impacted soil, and enforcing speed limits at the Project site.2 All soil removal activities will follow generally acceptable practices, institutional controls, and State, federal, and local agency guidelines, including, but not limited to, those of the: Environmental Protection Agency (EPA), South Coast Air Quality Management District (SCAQMD), Occupational Safety and Health Administration (OSHA)/National Institute of Occupational Safety and Health (NIOSH), and Regional Water Quality Control Board. Soil removal will occur in the summer when students and staff are off campus. The Project will be implemented pursuant to all applicable State, federal, and local regulations, and all applicable LAUSD specifications, standards, and/ or guidelines, including those in compliance with the California Environmental Quality Act (CEQA) and the updated Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects (SCs) as adopted by the Board of Education in December 2023.3 LAUSD's SCs, design guidelines, and best management practices are designed to be incorporated into the Project design in order to avoid or limit potential adverse impacts associated with the District's projects. The beneficiaries of this Project are the Venice HS students, faculty, staff, families, school supporters, and the community at large who may request access to the facilities and grounds of the Campus pursuant to the Civic Center Act (CA Ed. Code Sections 38130 - 38139).

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Federal
Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP)
Solicitation # W9127827RA002
The Fiscal Year 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP) is a small business set-aside solicitation for a single-award, 10-year firm-fixed-price contract. Managed by the U.S. Army Engineer District Mobile, the project has an estimated value between 25 million and 100 million dollars. The scope involves comprehensive, performance-based environmental remediation at 58 Installation Restoration Program sites and 5 Military Munitions Response Program sites across Eglin Air Force Base, Hurlburt Field, and Tyndall Air Force Base in Florida. Required services include investigation, design, construction of remedial systems, operation and maintenance, remedy optimization, and the achievement of site-specific performance objectives. The government will utilize a Best Value Tradeoff analysis for the award, where non-price factors—specifically technical approach, risk management, project management organization, the integrated master schedule, and past performance—are significantly more important than price. Key deliverables include a Project Management Plan, an Integrated Master Schedule in Primavera P6 format, and a Milestone Payment Schedule. Contractors must adhere to strict hazardous materials labeling, waste management, and sample preservation standards, as well as cybersecurity and geospatial data protection requirements. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment between December 1 and December 18, 2026.
W074 Endist Mobile

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Los Angeles Unified School District

Same awarding agency

NAICS: 423450
New
SLED
Automated External Defibrillators
Solicitation # 2381068792
The Los Angeles Unified School District is soliciting bids for a comprehensive Automated External Defibrillator (AED) program, including the provision of equipment, real-time monitoring, maintenance, compliance management, and post-event services. The resulting unit rate requirements contract will cover an initial 36-month period. Key technical specifications require a minimum four-year battery and electrode life. The District evaluates bidders primarily on the lowest unit cost on an FOB Destination basis, though bidders may be ruled non-responsible based on poor past performance. The District also reserves the right to inspect bidder facilities and may require a testing period for any newly proposed brands. Deliveries must be made to various District locations within 30 calendar days of a purchase order, with specific delivery windows between 8:00 a.m. and 3:30 p.m. All shipments must be properly packaged to prevent damage and include detailed packing slips. Payment is processed via Electronic Funds Transfer (EFT), and invoices must be submitted in PDF format. The contract emphasizes social responsibility, with a 25 percent participation goal for Small Business Enterprises and a 5 percent goal for Veteran and Disabled Veteran Business Enterprises. Bidders must provide proof of insurance, material safety data sheets, and disclosure of manufacturing plant locations to comply with the District's Sweat-Free Procurement Policy.
Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS